79 resultados para K-regulations


Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

New atmospheric pressure flow reactor data on the oxidation of formaldehyde in the temperature range 943-995 K and over equivalence ratios from 0.013 to 36.7 are reported and discussed. A detailed mechanism assembled from previously published results produced acceptable agreement with the experimental data for the fuel-lean conditions, but failed to predict results for oxidative pyrolysis. Analysis or the very fuel-lean conditions, but failed to modelling results are principally sensitive to CH2O+HO2→HCO+H2O2 (6) and H2O2 +M→OH+OH+M (33). Whereas the specific rate of each reaction cannot be independently determined, it is found that the product k33.k6 is a well defined function of temperature: (3.4±3.0).1028 exp(-(26,800±400)/T). Inadequacies in the mechanism which may be responsible for the disagreement under fuel-rich conditions are discussed. © 1991 Combustion Institute.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Water service providers (WSPs) in the UK have statutory obligations to supply drinking water to all customers that complies with increasingly stringent water quality regulations and minimum flow and pressure criteria. At the same time, the industry is required by regulators and investors to demonstrate increasing operational efficiency and to meet a wide range of performance criteria that are expected to improve year-on-year. Most WSPs have an ideal for improving the operation of their water supply systems based on increased knowledge and understanding of their assets and a shift to proactive management followed by steadily increasing degrees of system monitoring, automation and optimisation. The fundamental mission is, however, to ensure security of supply, with no interruptions and water quality of the highest standard at the tap. Unfortunately, advanced technologies required to fully understand, manage and automate water supply system operation either do not yet exist, are only partially evolved, or have not yet been reliably proven for live water distribution systems. It is this deficiency that the project NEPTUNE seeks to address by carrying out research into 3 main areas; these are: data and knowledge management; pressure management (including energy management); and the associated complex decision support systems on which to base interventions. The 3-year project started in April of 2007 and has already resulted in a number of research findings under the three main research priority areas (RPA). The paper summarises in greater detail the overall project objectives, the RPA activities and the areas of research innovation that are being undertaken in this major, UK collaborative study. Copyright 2009 ASCE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this study, TiN/La 2O 3/HfSiON/SiO 2/Si gate stacks with thick high-k (HK) and thick pedestal oxide were used. Samples were annealed at different temperatures and times in order to characterize in detail the interaction mechanisms between La and the gate stack layers. Time-of-flight secondary ion mass spectrometry (ToF-SIMS) measurements performed on these samples show a time diffusion saturation of La in the high-k insulator, indicating an La front immobilization due to LaSiO formation at the high-k/interfacial layer. Based on the SIMS data, a technology computer aided design (TCAD) diffusion model including La time diffusion saturation effect was developed. © 2012 American Institute of Physics.