During strong earthquakes, significant excess pore pressures can develop in saturated soils. After shaking ceases, the dissipation of these pressures can cause significant soil settlement, creating downward-acting frictional loads on piled foundations. Additionally, if the piles do not support the full axial load at the end of shaking, then the proportion of the superstructure's vertical loading carried by the piles may change as a result of the soil settlement, further altering the axial load distribution on piles as the soil consolidates. In this paper, the effect of hydraulic conductivity and initial post-shaking pile head loading is investigated in terms of the changing axial load distribution and settlement responses. The investigation is carried out by considering the results from four dynamic centrifuge experiments in which a 2 × 2 pile group was embedded in a two-layer profile and subjected to strong shaking. It is found that large contrasts in hydraulic conductivity between the two layers of the soil model affected both the pile group settlements and axial load distribution. Both these results stem from the differences in excess pore pressure dissipation, part of which took place very rapidly when the underlying soil layer had a large hydraulic conductivity.
Resumo:
Monopiles supporting offshore wind turbines are subjected to cyclic lateral loading. The properties of the applied cyclic lateral load are known to have an effect on the accumulation of permanent displacement and rotation at the pile head. The results of centrifuge testing on model piles show that certain loading regimes lead to the development of locked in soil stresses around the pile. These locked in soil stresses change the stiffness of the monopile response to cyclic lateral loading and the natural frequency of the pile-soil system. © 2014 Taylor & Francis Group.
Resumo:
Pile jacking is a common installation method for displacement piles due to the low noise and vibration involved in the installation procedure. Problems may occur when modelling jacked piles in the centrifuge, especially for friction piles, due to scaling effects which can be minimised, provided that the pile diameter is greater than fifty times the mean grain size. A series of centrifuge tests of jacked piles was performed in both dry and saturated fine sand. Piles were installed using three different methods. The effect of the installation method on the head load required is assessed. The influence of the normalised roughness was also tested by testing one rough and one smooth pile. Finally, cyclic shearing at constant depth was performed to establish the shaft load reduction due to friction fatigue. © 2014 Taylor & Francis Group.