70 resultados para Port Dalhousie Thorold Railway Company


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reviews advances in the technology of integrated semiconductor optical amplifier based photonic switch fabrics, with particular emphasis on their suitability for high performance network switches for use within a datacenter. The key requirements for large port count optical switch fabrics are addressed noting the need for switches with substantial port counts. The design options for a 16×16 port photonic switch fabric architecture are discussed and the choice of a Clos-tree design is described. The control strategy, based on arbitration and scheduling, for an integrated switch fabric is explained. The detailed design and fabrication of the switch is followed by experimental characterization, showing net optical gain and operation at 10 Gb/s with bit error rates lower than 10-9. Finally improvements to the switch are suggested, which should result in 100 Gb/s per port operation at energy efficiencies of 3 pJ/bit. © 2011 Optical Society of America.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Ultrafast self-switching of spectral-amplitude-encoded 40 Gb/s DPSK signals is demonstrated for the first time. Switching between 21 ports with 15nm maximum bin separation is achieved using a single correlator based on HNLF and an AWG. © 2009 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: The purpose of this paper is to present an exception to the common belief "If you can't measure it, you can't manage it". It aims to show how in certain situations particular practices, attitudes and cultures can remove the need for individual performance measurement. Design/methodology/approach: First, the paper identifies the usual roles of performance measurement in managing individual employees as described by control and motivation theorists. Second, it identifies a market-leading organisation where managers deliberately refuse to use their top-level performance measurement system to manage the performance of individual employees. A case study is carried out to test what non-measurement mechanisms fulfil the roles of individual performance measurement in this organisation. Findings: Building on situations observed at this company, a set of possible characteristics of companies that do not require formalised individual performance measurement systems in order to achieve high performance standards is put forward. Practical implications: Managers should not always assume that individual performance measurement is the only way to achieve excellent performance. This study shows that, by granting responsibilities and providing appropriate support, managers can channel workers' enhanced motivation towards meeting wider organisational goals. Originality/value: This work broadens the understanding of how excellent performance can be achieved. It shows that excellence can be achieved through practices based on shared values linked to motivation, trust, and a common sense of mission, without the need to install individual performance measurement systems based on cybernetic principles. © Emerald Group Publishing Limited.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Accurate predictions of ground-borne vibration levels in the vicinity of an underground railway are greatly sought after in modern urban centres. Yet the complexity involved in simulating the underground environment means that it is necessary to make simplifying assumptions about this system. One such commonly made assumption is to ignore the effects of neighbouring tunnels, despite the fact that many underground railway lines consist of twin-bored tunnels, one for the outbound direction and one for the inbound direction. This paper presents a unique model for two tunnels embedded in a homogeneous, elastic fullspace. Each of these tunnels is subject to both known, dynamic train forces and dynamic cavity forces. The net forces acting on the tunnels are written as the sum of those tractions acting on the invert of a single tunnel, and those tractions that represent the motion induced by the neighbouring tunnel. By apportioning the tractions in this way, the vibration response of a two-tunnel system is written as a linear combination of displacement fields produced by a single-tunnel system. Using Fourier decomposition, forces are partitioned into symmetric and antisymmetric modenumber components to minimise computation times. The significance of the interactions between two tunnels is quantified by calculating the insertion gains, in both the vertical and horizontal directions, that result from the existence of a second tunnel. The insertion-gain results are shown to be localised and highly dependent on frequency, tunnel orientation and tunnel thickness. At some locations, the magnitude of these insertion gains is greater than 20 dB. This demonstrates that a high degree of inaccuracy exists in any surface vibration prediction model that includes only one of the two tunnels. This novel two-tunnel solution represents a significant contribution to the existing body of research into vibration from underground railways, as it shows that the second tunnel has a significant influence on the accuracy of vibration predictions for underground railways. © 2011 Elsevier Ltd. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The authors use simulation to analyse the resource-driven dependencies between concurrent processes used to create customised products in a company. Such processes are uncertain and unique according to the design changes required. However, they have similar structures. For simulation, a level of abstraction is chosen such that all possible processes are represented by the same activity network. Differences between processes are determined by the customisations that they implement. The approach is illustrated through application to a small business that creates customised fashion products. We suggest that similar techniques could be applied to study intertwined design processes in more complex domains. Copyright © 2011 Inderscience Enterprises Ltd.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report deals with collaborations of engineering consultants and clients in the automobile industry.

In these relationships three main challenges have been identified which have to be addressed by the consultancies. Therefore, the research takes the viewpoint of the consulting side. The challenges are

(i) the appropriate project goal definition;

(ii) achieving client satisfaction; and

(iii) dealing with international clients.

An investigation of such a relationship carried out on a case study shows that improvements can be achieved through communication support. The ways to do that are proposed.