49 resultados para Development Permit System
Resumo:
The developments of standard, projects and technology of PV concentrator system was briefly reported. A detailed description of photovoltaic concentrator system was given, which included technology and recent development of optical components, receivers and balance of system (BOS). The heat sink of passive cooling and active cooling was given. A brief discussion promise of this technology was included. Finally, main technological problems were presented.
Resumo:
Industrialists have few example processes they can benchmark against in order to choose a multi-agent development kit. In this paper we present a review of commercial and academic agent tools with the aim of selecting one for developing an intelligent, self-serving asset architecture. In doing so, we map and enhance relevant assessment criteria found in literature. After a preliminary review of 20 multiagent platforms, we examine in further detail those of JADE, JACK and Cougaar. Our findings indicate that Cougaar is well suited for our requirements, showing excellent support for criteria such as scalability, persistence, mobility and lightweightness. © 2010 IEEE.
Resumo:
This paper presents the findings from four case studies on stakeholder engagement in new health information and communication technology (ICT) product-service system (PSS) development. The degree of connectivity between the new health ICT PSS and its intended operating environment has emerged to be an important contextual factor that may impact the decision of stakeholder engagement in the early stage development process. Along with the proposition of a four-level framework to guide stakeholder identification for new PSS development, three stakeholder engagement propositions that are based on the degree of connectivity are developed. Analysis has shown that there can be two types of connectivity: data and process. Moreover, each connectivity type can be characterized by how much the new PSS is connected with its environment: independent if there is no linkage, linked if it interfaces with, or incorporated if it is embedded into. Furthermore, depending upon whether and to what extent the PSS has data and process connectivity with its intended operating environment, the stakeholder engagement needs in early stage development vary. The propositions presented in this paper provide important directions for future work exploring PSS characterization and stakeholder engagement decision in early stage new PSS development in the healthcare industry. © 2013 PICMET.