52 resultados para Amsterdam, Gemeente
Resumo:
The north-south line in Amsterdam is being built underneath the historic centre of the city. Three deep stations are being constructed in deep excavations supported by diaphragm walls. During the excavation for Vijzelgracht station, leakage through the wall resulted in large settlements and damage to historic buildings, which threatened continuation of the project. The authors analysed the cause of the leakage and the damage to the buildings. With the application of robust preventative measures at two of the deep excavations it was possible to continue the project. This paper reports on the cause of the events, the damage to the buildings and the counter-measures taken. It includes lessons learned for the project and for the foundations industry.
Resumo:
This paper explores the influence of the piled foundation on the building response to excavation-induced deformations. The influence of the type of foundation, the position of positive and negative skin friction zones, and the flexibility of the piles is evaluated with respect to both horizontal and vertical soil deformations. Case histories from the Netherlands are included from Amsterdam (North South Line) and Rotterdam (a building adjacent to the Willemspoortunnel). Most of the buildings are founded on timber piles ranging in length from 12-17 m. Conclusions are drawn about the interaction between the piled building and the soil deformation. © 2012 Taylor & Francis Group.