This report deals with collaborations of engineering consultants and clients in the automobile industry.

In these relationships three main challenges have been identified which have to be addressed by the consultancies. Therefore, the research takes the viewpoint of the consulting side. The challenges are

(i) the appropriate project goal definition;

(ii) achieving client satisfaction; and

(iii) dealing with international clients.

An investigation of such a relationship carried out on a case study shows that improvements can be achieved through communication support. The ways to do that are proposed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The spinning off of Cambridge Semiconductor Ltd (Camsemi) from the High Voltage Microelectronics Lab at Cambridge University is discussed. The technology originated from Cambridge University and was subsequently developed and commercialized as PowerBrane by Camsemi. The paper also discusses the business model and the enabling financial factors that led to the formation of Camsemi as a fables IC company, including access to seed funding from University and the subsequent investments of venture capital in several rounds. © 2011 IEEE.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Strategic planning can be an arduous and complex task; and, once a plan has been devised, it is often quite a challenge to effectively communicate the principal missions and key priorities to the array of different stakeholders. The communication challenge can be addressed through the application of a clearly and concisely designed visualisation of the strategic plan - to that end, this paper proposes the use of a roadmapping framework to structure a visual canvas. The canvas provides a template in the form of a single composite visual output that essentially allows a 'plan-on-a-page' to be generated. Such a visual representation provides a high-level depiction of the future context, end-state capabilities and the system-wide transitions needed to realise the strategic vision. To demonstrate this approach, an illustrative case study based on the Australian Government's Defence White Paper and the Royal Australian Navy's fleet plan will be presented. The visual plan plots the in-service upgrades for addressing the capability shortfalls and gaps in the Navy's fleet as it transitions from its current configuration to its future end-state vision. It also provides a visualisation of project timings in terms of the decision gates (approval, service release) and specific phases (proposal, contract, delivery) together with how these projects are rated against the key performance indicators relating to the technology acquisition process and associated management activities. © 2013 Taylor & Francis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In recent years, the healthcare sector has adopted the use of operational risk assessment tools to help understand the systems issues that lead to patient safety incidents. But although these problem-focused tools have improved the ability of healthcare organizations to identify hazards, they have not translated into measurable improvements in patient safety. One possible reason for this is a lack of support for the solution-focused process of risk control. This article describes a content analysis of the risk management strategies, policies, and procedures at all acute (i.e., hospital), mental health, and ambulance trusts (health service organizations) in the East of England area of the British National Health Service. The primary goal was to determine what organizational-level guidance exists to support risk control practice. A secondary goal was to examine the risk evaluation guidance provided by these trusts. With regard to risk control, we found an almost complete lack of useful guidance to promote good practice. With regard to risk evaluation, the trusts relied exclusively on risk matrices. A number of weaknesses were found in the use of this tool, especially related to the guidance for scoring an event's likelihood. We make a number of recommendations to address these concerns. The guidance assessed provides insufficient support for risk control and risk evaluation. This may present a significant barrier to the success of risk management approaches in improving patient safety. © 2013 Society for Risk Analysis.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A methodology for the analysis of building energy retrofits has been developed for a diverse set of buildings at the Royal Botanic Gardens (RBG), Kew in southwest London, UK. The methodology requires selection of appropriate building simulation tools dependent on the nature of the principal energy demand. This has involved the development of a stand-alone model to simulate the heat flow in botanical glasshouses, as well as stochastic simulation of electricity demand for buildings with high equipment density and occupancy-led operation. Application of the methodology to the buildings at RBG Kew illustrates the potential reduction in energy consumption at the building scale achievable from the application of retrofit measures deemed appropriate for heritage buildings and the potential benefit to be gained from onsite generation and supply of energy. © 2014 Elsevier Ltd.