52 resultados para Landing operations.
Resumo:
Production responsiveness refers to the ability of a production system to achieve its operational goals in the presence of supplier, internal and customer disturbances, where disturbances are those sources of change which occur independently of the system's intentions. A set of audit tools for assessing the responsiveness of production operations is being prepared as part of an EPSRC funded investigation. These tools are based on the idea that the ability to respond is linked to: the nature of the disturbances or changes requiring a response; their impact on production goals; and the inherent response capabilities of the operation. These response capabilities include information gathering and processing (to detect disturbances and production conditions), decision processes (which initiate system responses to disturbances) and various types of process flexibilities and buffers (which provide the physical means of dealing with disturbances). The paper discusses concepts and issues associated with production responsiveness, describes the audit tools that have been developed and illustrates their use in the context of a steel manufacturing plant.
Resumo:
The Silent Aircraft Initiative aims to provide a conceptual design for a large passenger aircraft whose noise would be imperceptible above the background level outside an urban airfield. Landing gear noise presents a significant challenge to such an aircraft. 1/10th scale models have been examined with the aim of establishing a lower noise limit for large aircraft landing gear. Additionally, the landing gear has been included in an integrated design concept for the 'Silent' Aircraft. This work demonstrates the capabilities of the closed-section Markham wind tunnel and the installed phased microphone arrays for aerodynamic and acoustic measurements. Interpretation of acoustic data has been enhanced by use of the CLEAN algorithm to quantify noise levels in a repeatable way and to eliminate side lobes which result from the microphone array geometry. Results suggest that highly simplified landing gears containing only the main struts offer a 12dBA reduction from modern gear noise. Noise treatment of simplified landing gear with fairings offers a further reduction which appears to be limited by noise from the lower parts of the wheels. The importance of fine details and surface discontinuities for low noise design are also underlined.
Resumo:
This paper discusses the application of Discrete Event Simulation (DES) in modelling the complex relationship between patient types, case-mix and operating theatre allocation in a large National Health Service (NHS) Trust in London. The simulation model that was constructed described the main features of nine theatres, focusing on operational processes and patient throughput times. The model was used to test three scenarios of case-mix and to demonstrate the potential of using simulation modelling as a cost effective method for understanding the issues of healthcare operations management and the role of simulation techniques in problem solving. The results indicated that removing all day cases will reduce patient throughput by 23.3% and the utilization of the orthopaedic theatre in particular by 6.5%. This represents a case example of how DES can be used by healthcare managers to inform decision making. © 2008 IEEE.
Resumo:
A set of audit tools is being prepared for assessing the response capability of a production operation, as part of an EPSRC1 funded investigation into improving the responsiveness of manufacturing production systems. These tools are based on the idea that the ability to respond is linked to i) the nature of the disturbances or changes requiring a response, ii) their impact on production goals and iii) the decision processes which initiate system responses to disturbances.
Resumo:
Purpose: This paper aims to improve understanding of how to manage global network operations from an engineering perspective. Design/methodology/approach: This research adopted a theory building approach based on case studies. Grounded in the existing literature, the theoretical framework was refined and enriched through nine in-depth case studies in the industry sectors of aerospace, automotives, defence and electrics and electronics. Findings: This paper demonstrates the main value creation mechanisms of global network operations along the engineering value chain. Typical organisational features to support the value creation mechanisms are captured, and the key issues in engineering network design and operations are presented with an overall framework. Practical implications: Evidenced by a series of pilot applications, outputs of this research can help companies to improve the performance of their current engineering networks and design new engineering networks to better support their global businesses and customers in a systematic way. Originality/value: Issues about the design and operations of global engineering networks (GEN) are poorly understood in the existing literature in contrast to their apparent importance in value creation and realisation. To address this knowledge gap, this paper introduces the concept of engineering value chain to highlight the potential of a value chain approach to the exploration of engineering activities in a complex business context. At the same time, it develops an overall framework for managing GEN along the engineering value chain. This improves our understanding of engineering in industrial value chains and extends the theoretical understanding of GEN through integrating the engineering network theories and the value chain concepts. © Emerald Group Publishing Limited.