32 resultados para Central of Georgia Railway.


Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper presents a three-dimensional comprehensive model for the calculation of vibration in a building based on pile-foundation due to moving trains in a nearby underground tunnel. The model calculates the Power Spectral Density (PSD) of the building's responses due to trains moving on floating-slab tracks with random roughness. The tunnel and its surrounding soil are modelled as a cylindrical shell embedded in half-space using the well-known PiP model. The building and its piles are modelled as a 2D frame using the dynamic stiffness matrix. Coupling between the foundation and the ground is performed using the theory of joining subsystems in the frequency domain. The latter requires calculations of transfer functions of a half-space model. A convenient choice based on the thin-layer method is selected in this work for the calculations of responses in a half-space due to circular strip loadings. The coupling considers the influence of the building's dynamics on the incident wave field from the tunnel, but ignores any reflections of building's waves from the tunnel. The derivation made in the paper shows that the incident vibration field at the building's foundation gets modified by a term reflecting the coupling and the dynamics of the building and its foundation. The comparisons presented in the paper show that the dynamics of the building and its foundation significantly change the incident vibration field from the tunnel and they can lead to loss of accuracy of predictions if not considered in the calculation.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In the central part of the Delft railway tunnel project, an underground railway station is being built at very close distance to the existing station building, which is still in operation. Although elaborate sensitivity analyses were made, some unforeseen deformations were encountered during the first phases of the execution process. Especially the installation of temporary sheet pile walls as well as the installation of a huge amount of grout anchor piles resulted in deformations exceeding the predicted final deformations as well as the boundary values defined by a level I limiting tensile strain method (LTSM) approach. In order to ensure the execution process, supplementary analyses were made to predict future deformations, and this for multiple cross sections. These deformations were implemented into a finite element model of the masonry of the building in order to define probable crack formation. This Level II LTSM approach made it possible to increase the initially foreseen deformation criteria and the continuation of the works. Design steps, design models and monitoring results will be explained within this paper.