27 resultados para software management methodology
Resumo:
CAD software can be structured as a set of modular 'software tools' only if there is some agreement on the data structures which are to be passed between tools. Beyond this basic requirement, it is desirable to give the agreed structures the status of 'data types' in the language used for interactive design. The ultimate refinement is to have a data management capability which 'understands' how to manipulate such data types. In this paper the requirements of CACSD are formulated from the point of view of Database Management Systems. Progress towards meeting these requirements in both the DBMS and the CACSD community is reviewed. The conclusion reached is that there has been considerable movement towards the realisation of software tools for CACSD, but that this owes more to modern ideas about programming languages, than to DBMS developments. The DBMS field has identified some useful concepts, but further significant progress is expected to come from the exploitation of concepts such as object-oriented programming, logic programming, or functional programming.
Resumo:
Water supply and wastewater control are critical elements of society's infrastructure. The objective of this study will be to provide a generic risk assessment tool to provide municipalities and the nation as a whole with a quantifiable assessment of their vulnerability to water infrastructure threats. The approach will prioritize countermeasures and identify where research and development is required to further minimize risk. This paper outlines the current context, primary concerns and state-of-the art in critical infrastructure risk management for the water sector and proposes a novel approach to resolve existing questions in the field. The proposed approach is based on a modular framework that derives a quantitative risk index for varied domains of interest. The approach methodology is scaleable and based on formal definitions of event probability and severity. The framework is equally applicable to natural and human-induced hazard types and can be used for analysis of compound risk events.
Resumo:
Purpose - The purpose of this paper is to explore the concept of performance plumbing, arguing that too often performance management systems in organisations are not correctly installed. Without the appropriate plumbing, performance management systems do not drive organisational change and improvement. Design/methodology/approach - The paper draws on the consultancy experiences of two of the authors, as well as the research of the third. Specific case examples are provided throughout the paper to illustrate the points being made. Findings - The paper argues that the key elements of a plumbed-in performance management system are: performance architecture; performance insights; performance focus; and performance action. Taken together, these four elements provide the necessary plumbing to enable performance management systems to deliver real value. Research limitations/implications - The paper draws on the experience of the authors, rather than a formally designed piece of research. The ideas presented in the paper would therefore benefit from further investigation and testing. Originality/value - The paper will be valuable to scholars and practitioners interested in ensuring that performance management systems deliver lasting value. © Emerald Group Publishing Limited.
Resumo:
A small low air-speed wind turbine blade case study is used to demonstrate the effectiveness of a materials and design selection methodology described by Monroy Aceves et al. (2008) [24] for composite structures. The blade structure comprises a shell of uniform thickness and a unidirectional reinforcement. The shell outer geometry is fixed by aerodynamic considerations. A wide range of lay-ups are considered for the shell and reinforcement. Structural analysis is undertaken using the finite element method. Results are incorporated into a database for analysis using material selection software. A graphical selection stage is used to identify the lightest blade meeting appropriate design constraints. The proposed solution satisfies the design requirements and improves on the prototype benchmark by reducing the mass by almost 50%. The flexibility of the selection software in allowing identification of trends in the results and modifications to the selection criteria is demonstrated. Introducing a safety factor of two on the material failure stresses increases the mass by only 11%. The case study demonstrates that the proposed design methodology is useful in preliminary design where a very wide range of cases should be considered using relatively simple analysis. © 2011 Elsevier Ltd.
Resumo:
This book explores the processes for retrieval, classification, and integration of construction images in AEC/FM model based systems. The author describes a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval that have been integrated into a novel method for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks. objects. Therefore, automated methods for the integration of construction images are important for construction information management. During this research, processes for retrieval, classification, and integration of construction images in AEC/FM model based systems have been explored. Specifically, a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval have been deployed in order to develop a methodology for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks.
Resumo:
The Architecture, Engineering, Construction and Facilities Management (AEC/FM) industry is rapidly becoming a multidisciplinary, multinational and multi-billion dollar economy, involving large numbers of actors working concurrently at different locations and using heterogeneous software and hardware technologies. Since the beginning of the last decade, a great deal of effort has been spent within the field of construction IT in order to integrate data and information from most computer tools used to carry out engineering projects. For this purpose, a number of integration models have been developed, like web-centric systems and construction project modeling, a useful approach in representing construction projects and integrating data from various civil engineering applications. In the modern, distributed and dynamic construction environment it is important to retrieve and exchange information from different sources and in different data formats in order to improve the processes supported by these systems. Previous research demonstrated that a major hurdle in AEC/FM data integration in such systems is caused by its variety of data types and that a significant part of the data is stored in semi-structured or unstructured formats. Therefore, new integrative approaches are needed to handle non-structured data types like images and text files. This research is focused on the integration of construction site images. These images are a significant part of the construction documentation with thousands stored in site photographs logs of large scale projects. However, locating and identifying such data needed for the important decision making processes is a very hard and time-consuming task, while so far, there are no automated methods for associating them with other related objects. Therefore, automated methods for the integration of construction images are important for construction information management. During this research, processes for retrieval, classification, and integration of construction images in AEC/FM model based systems have been explored. Specifically, a combination of techniques from the areas of image and video processing, computer vision, information retrieval, statistics and content-based image and video retrieval have been deployed in order to develop a methodology for the retrieval of related construction site image data from components of a project model. This method has been tested on available construction site images from a variety of sources like past and current building construction and transportation projects and is able to automatically classify, store, integrate and retrieve image data files in inter-organizational systems so as to allow their usage in project management related tasks.
Resumo:
The concept of sustainable manufacturing is a form of pollution prevention that integrates environmental considerations in the production of goods while focusing on efficient resource use. Taking the industrial ecology perspective, this efficiency comes from improved resource flow management. The assessment of material, energy and waste resource flows, therefore, offers a route to viewing and analysing a manufacturing system as an ecosystem using industrial ecology biological analogy and can, in turn, support the identification of improvement opportunities in the material, energy and waste flows. This application of industrial ecology at factory level is absent from the literature. This article provides a prototype methodology to apply the concepts of industrial ecology using material, energy and waste process flows to address this gap in the literature. Various modelling techniques were reviewed and candidates selected to test the prototype methodology in an industrial case. The application of the prototype methodology showed the possibility of using the material, energy and waste resource flows through the factory to link manufacturing operations and supporting facilities, and to identify potential improvements in resource use. The outcomes of the work provide a basis to build the specifications for a modelling tool that can support those analysing their manufacturing system to improve their environmental performance and move towards sustainable manufacturing. © IMechE 2012.
Resumo:
Established literature on new product development (NPD) management recognizes top management involvement (TMI) as one of the most critical success factors. With increasing pressure to sustain competitive advantage and growth, NPD activities remain the focus of close interest from top management in many organizations. TMI in the NPD domain is receiving increasing academic attention. Despite its criticality, there is no systematic review of the existing literature to inform and stimulate researchers in the field for further investigation. This paper introduces the current state of literature on TMI in NPD, synthesizes important findings, and identifies the gaps and deficiencies in this research stream. The contents of the selected articles, which investigated TMI in NPD, are analyzed based on the type of the study, level of analysis, research methodology, operationalization of TMI, and main findings. Additionally, other studies, which did not directly investigate TMI and support in NPD, but were sufficiently related, are briefly summarized. As a result of this detailed literature review, it can be stated that both exploratory and relational studies provide rich evidence on the critical role of top management in NPD. However, the identified gaps and deficiencies in this research stream call for a better theoretical understanding and well-defined constructs of TMI in the NPD domain for different levels of analysis for future studies.
Resumo:
BGCore is a software package for comprehensive computer simulation of nuclear reactor systems and their fuel cycles. The BGCore interfaces Monte Carlo particles transport code MCNP4C with a SARAF module - an independently developed code for calculating in-core fuel composition and spent fuel emissions following discharge. In BGCore system, depletion coupling methodology is based on the multi-group approach that significantly reduces computation time and allows tracking of large number of nuclides during calculations. In this study, burnup calculation capabilities of BGCore system were validated against well established and verified, computer codes for thermal and fast spectrum lattices. Very good agreement in k eigenvalue and nuclide densities prediction was observed for all cases under consideration. In addition, decay heat prediction capabilities of the BGCore system were benchmarked against the most recent edition of ANS Standard methodology for UO2 fuel decay power prediction in LWRs. It was found that the difference between ANS standard data and that predicted by the BGCore does not exceed 5%.
Resumo:
In the modern engineering design cycle the use of computational tools becomes a necessity. The complexity of the engineering systems under consideration for design increases dramatically as the demands for advanced and innovative design concepts and engineering products is expanding. At the same time the advancements in the available technology in terms of computational resources and power, as well as the intelligence of the design software, accommodate these demands and make them a viable approach towards the challenge of real-world engineering problems. This class of design optimisation problems is by nature multi-disciplinary. In the present work we establish enhanced optimisation capabilities within the Nimrod/O tool for massively distributed execution of computational tasks through cluster and computational grid resources, and develop the potential to combine and benefit from all the possible available technological advancements, both software and hardware. We develop the interface between a Free Form Deformation geometry management in-house code with the 2D airfoil aerodynamic efficiency evaluation tool XFoil, and the well established multi-objective heuristic optimisation algorithm NSGA-II. A simple airfoil design problem has been defined to demonstrate the functionality of the design system, but also to accommodate a framework for future developments and testing with other state-of-the-art optimisation algorithms such as the Multi-Objective Genetic Algorithm (MOGA) and the Multi-Objective Tabu Search (MOTS) techniques. Ultimately, heavily computationally expensive industrial design cases can be realised within the presented framework that could not be investigated before. ©2012 AIAA.