31 resultados para fire safety design


Relevância:

30.00% 30.00%

Publicador:

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The software package Dymola, which implements the new, vendor-independent standard modelling language Modelica, exemplifies the emerging generation of object-oriented modelling and simulation tools. This paper shows how, in addition to its simulation capabilities, it may be used as an embodiment design tool, to size automatically a design assembled from a library of generic parametric components. The example used is a miniature model aircraft diesel engine. To this end, the component classes contain extra algebraic equations calculating the overload factor (or its reciprocal, the safety factor) for all the different modes of failure, such as buckling or tensile yield. Thus the simulation results contain the maximum overload or minimum safety factor for each failure mode along with the critical instant and the device state at which it occurs. The Dymola "Initial Conditions Calculation" function, controlled by a simple software script, may then be used to perform automatic component sizing. Each component is minimised in mass, subject to a chosen safety factor against failure, over a given operating cycle. Whilst the example is in the realm of mechanical design, it must be emphasised that the approach is equally applicable to the electrical or mechatronic domains, indeed to any design problem requiring numerical constraint satisfaction.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A small low air-speed wind turbine blade case study is used to demonstrate the effectiveness of a materials and design selection methodology described by Monroy Aceves et al. (2008) [24] for composite structures. The blade structure comprises a shell of uniform thickness and a unidirectional reinforcement. The shell outer geometry is fixed by aerodynamic considerations. A wide range of lay-ups are considered for the shell and reinforcement. Structural analysis is undertaken using the finite element method. Results are incorporated into a database for analysis using material selection software. A graphical selection stage is used to identify the lightest blade meeting appropriate design constraints. The proposed solution satisfies the design requirements and improves on the prototype benchmark by reducing the mass by almost 50%. The flexibility of the selection software in allowing identification of trends in the results and modifications to the selection criteria is demonstrated. Introducing a safety factor of two on the material failure stresses increases the mass by only 11%. The case study demonstrates that the proposed design methodology is useful in preliminary design where a very wide range of cases should be considered using relatively simple analysis. © 2011 Elsevier Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The world is at the threshold of emerging technologies, where new systems in construction, materials, and civil and architectural design are poised to make the world better from a structural and construction perspective. Exciting developments, that are too many to name individually, take place yearly, affecting design considerations and construction practices. This edited book brings together modern methods and advances in structural engineering and construction, fulfilling the mission of ISEC Conferences, which is to enhance communication and understanding between structural and construction engineers for successful design and construction of engineering projects. The articles in this book are those accepted for publication and presentation at the 6th International Structural Engineering and Construction Conference in Zurich. The 6th ISEC Conference in Zurich, Switzerland, follows the overwhelming reception and success of previous ISEC conference in Las Vegas, USA in 2009; Melbourne, Australia in 2007; Shunan, Japan in 2005; Rome, Italy in 2003; and Honolulu, USA in 2001. Many topics are covered in this book, ranging from legal affairs and contracting, to innovations and risk analysis in infrastructure projects, analysis and design of structural systems, materials, architecture, and construction. The articles here are a lasting testimony to the excellent research being undertaken around the world. These articles provide a platform for the exchange of ideas, research efforts and networking in the structural engineering and construction communities. We congratulate and thank the authors for these articles that were selected after intensive peer-review, and our gratitude extends to all reviewers and members of the International Technical Committee. It is their combined contributions that have made this book a reality.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Space heating accounts for a large portion of the world's carbon dioxide emissions. Ground Source Heat Pumps (GSHPs) are a technology which can reduce carbon emissions from heating and cooling. GSHP system performance is however highly sensitive to deviation from design values of the actual annual energy extraction/rejection rates from/to the ground. In order to prevent failure and/or performance deterioration of GSHP systems it is possible to incorporate a safety factor in the design of the GSHP by over-sizing the ground heat exchanger (GHE). A methodology to evaluate the financial risk involved in over-sizing the GHE is proposed is this paper. A probability based approach is used to evaluate the economic feasibility of a hypothetical full-size GSHP system as compared to four alternative Heating Ventilation and Air Conditioning (HVAC) system configurations. The model of the GSHP system is developed in the TRNSYS energy simulation platform and calibrated with data from an actual hybrid GSHP system installed in the Department of Earth Science, University of Oxford, UK. Results of the analysis show that potential savings from a full-size GSHP system largely depend on projected HVAC system efficiencies and gas and electricity prices. Results of the risk analysis also suggest that a full-size GSHP with auxiliary back up is potentially the most economical system configuration. © 2012 Elsevier Ltd.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

OBJECTIVE: This study identifies the stakeholders who have a role in medical device purchasing within the wider system of health-care delivery and reports on their particular challenges to promote patient safety during purchasing decisions. METHODS: Data was collected through observational work, participatory workshops, and semi-structured qualitative interviews, which were analyzed and coded. The study takes a systems-based and engineering design approach to the study. Five hospitals took part in this study, and the participants included maintenance, training, clinical end-users, finance, and risk departments. RESULTS: The main stakeholders for purchasing were identified to be staff from clinical engineering (Maintenance), device users (Clinical), device trainers (Training), and clinical governance for analyzing incidents involving devices (Risk). These stakeholders display varied characteristics in terms of interpretation of their own roles, competencies for selecting devices, awareness and use of resources for purchasing devices, and attitudes toward the purchasing process. The role of "clinical engineering" is seen by these stakeholders to be critical in mediating between training, technical, and financial stakeholders but not always recognized in practice. CONCLUSIONS: The findings show that many device purchasing decisions are tackled in isolation, which is not optimal for decisions requiring knowledge that is currently distributed among different people within different departments. The challenges expressed relate to the wider system of care and equipment management, calling for a more systemic view of purchasing for medical devices.