18 resultados para Pedagogy of architectural project
Resumo:
This research addresses product introduction dispersed across locations and companies. Mechanisms appropriate to integrate activities in collocated teams may not serve dispersed teams well. A semiconductor design licensor was studied in depth to explore how dispersed product introduction varies with uncertainty. We found that autonomous teams focused on sub-products (micro-products) were used rather than cross-functional teams in departments with high architectural uncertainty. Both types of teams were effectively dispersed across locations and companies. This suggests that small high-technology companies may find it easier to expand into new geographies and product lines than was previously believed.
Resumo:
Choosing a project manager for a construction project—particularly, large projects—is a critical project decision. The selection process involves different criteria and should be in accordance with company policies and project specifications. Traditionally, potential candidates are interviewed and the most qualified are selected in compliance with company priorities and project conditions. Precise computing models that could take various candidates’ information into consideration and then pinpoint the most qualified person with a high degree of accuracy would be beneficial. On the basis of the opinions of experienced construction company managers, this paper, through presenting a fuzzy system, identifies the important criteria in selecting a project manager. The proposed fuzzy system is based on IF-THEN rules; a genetic algorithm improves the overall accuracy as well as the functions used by the fuzzy system to make initial estimates of the cluster centers for fuzzy c-means clustering. Moreover, a back-propagation neutral network method was used to train the system. The optimal measures of the inference parameters were identified by calculating the system’s output error and propagating this error within the system. After specifying the system parameters, the membership function parameters—which by means of clustering and projection were approximated—were tuned with the genetic algorithm. Results from this system in selecting project managers show its high capability in making high-quality personnel predictions
Resumo:
This report is a product of close industry-academia collaboration between British Aerospace and the Cambridge Engineering Design Centre (EDC). British Aerospace designs and integrates some of the most complex systems in the world, and its expertise in this field has enabled the company to become the United Kingdom's largest exporter. However, to stay at the forefront of the highly competitive aerospace industry it is necessary to seek new ways to work more effectively and more efficiently. The Cambridge EDC has played a part in supporting these needs by providing access to the methods and tools that it has developed for improving the process of designing mechanical systems. The EDC has gained an international reputation for the quality of its work in this subject. Thus, the collaboration is between two organisations each of whom are leaders in their respective fields. The central aim of the project has been to demonstrate how a systematic design process can be applied to a real design task identified by industry. The task selected was the design of a flight refuelling probe which would enable a combat aircraft to refuel from a "flying tanker". However, the systematic approach, methods and tools described in this report are applicable to most engineering design tasks. The findings presented in this report provide a sound basis for comparing the recommended systematic design process with industrial practice. The results of this comparison would enable the company to define ways in which its existing design process can be improved. This research project has a high degree of industrial relevance. The value of the work may be judged in terms of the opportunities it opens up for positive changes to the company's engineering operations. Several members of the EDC have contributed to the project. These include Dr Lucienne Blessing, Dr Stuart Burgess, Dr Amaresh Chakrabarti, Major Mark Nowack, Aylmer Johnson and Dr Paul Weaver. At British Aerospace special thanks must go to Alan Dean and David Halliday for their interest and the support they have given. The project has been managed by Dr Nigel Upton of British Aerospace during a 3 year secondment to the EDC.
Resumo:
In this paper we shall discuss the use of the TSIM simulation software for modelling large-scale industrial processes. The discussion draws on our recent experience of modelling a large plant in the food-processing industry. We shall focus on those features of software organization and software engineering which proved to be particularly necessary for the execution of this project, and illustrate the extent to which the use of TISM facilitated the implementation of these features. We shall also make some general remarks about the 'life-cycle' of models resulting from projects of this kind.
Resumo:
The conceptual design phase of any project is, by its very nature, a vibrant, creative and dynamic period. It can also be disorganized with much backtracking accompanying the exchange of information between design team members. The transfer of information, ideas and opinion is critical to the development of concepts and as such, rather than being recognized as merely a component of conceptual design activity, it needs to be understood and, ultimately, managed. This paper describes an experimental workshop involving fifteen design professionals in which conceptual design activity was tracked, and subsequently mapped, in order to test and validate a tentative design framework (phase and activity model). The nature of the design progression of the various teams is captured and analyzed, allowing a number of conclusions to be drawn regarding both the iterative nature of this phase of design and how teams of professionals actually design together.
Resumo:
A case study of the response of two buildings to the construction of a 12 m diameter tunnel excavated by conventional method, in Italy, is studied. The 12 m diameter tunnel was constructed carrying out reinforcement of the tunnel face and around the crown prior to excavation and installation of the temporary sprayed concrete lining and the permanent reinforced concrete lining. Reflective prisms, placed at first floor level around the perimeter of the building facades, allowed building settlements to be measured. Ground settlements between the two buildings were measured using BRE type settlement studs. Extensive protective measures were adopted to maintain stability of the tunnel excavation and to reduce ground movements. The number of horizontal jet grout columns installed into the tunnel face was reduced over the course of the project. Results from CPT tests indicate that the undrained shear strength at the tunnel axis is around 120 kPa. SPT and undrained unconsolidated (UU) triaxial tests indicate lower strengths of around 80 kPa, although this may be due to sample disturbance.
Resumo:
This paper presents the results of a project aimed at minimising fuel usage while maximising steam availability in the power and steam plant of a large newsprint mill. The approach taken was to utilise the better regulation and plant wide optimisation capabilities of Advanced Process Control, especially Model Predictive Control (MPC) techniques. These have recently made their appearance in the pulp and paper industry but are better known in the oil and petrochemical industry where they have been used for nearly 30 years. The issue in the power and steam plant is to ensure that sufficient steam is available when the paper machines require it and yet not to have to waste too much steam when one or more of the machines suffers an outage. This is a problem for which MPC is well suited. It allows variables to be kept within declared constraint ranges, a feature which has been used, effectively, to increase the steam storage capacity of the existing plant. This has resulted in less steam being condensed when it is not required and in significant reductions in the need for supplementary firing. The incidence of steam being dump-condensed while also supplementary firing the Combined Heat & Power (CHP) plant has been reduced by 95% and the overall use of supplementary firing is less than 30% of what it was. In addition the plant runs more smoothly and requires less operator time. The yearly benefit provided by the control system is greater than £200,000, measured in terms of 2005 gas prices.
Resumo:
Air pockets, one kind of concrete surface defects, are often created on formed concrete surfaces during concrete construction. Their existence undermines the desired appearance and visual uniformity of architectural concrete. Therefore, measuring the impact of air pockets on the concrete surface in the form of air pockets is vital in assessing the quality of architectural concrete. Traditionally, such measurements are mainly based on in-situ manual inspections, the results of which are subjective and heavily dependent on the inspectors’ own criteria and experience. Often, inspectors may make different assessments even when inspecting the same concrete surface. In addition, the need for experienced inspectors costs owners or general contractors more in inspection fees. To alleviate these problems, this paper presents a methodology that can measure air pockets quantitatively and automatically. In order to achieve this goal, a high contrast, scaled image of a concrete surface is acquired from a fixed distance range and then a spot filter is used to accurately detect air pockets with the help of an image pyramid. The properties of air pockets (the number, the size, and the occupation area of air pockets) are subsequently calculated. These properties are used to quantify the impact of air pockets on the architectural concrete surface. The methodology is implemented in a C++ based prototype and tested on a database of concrete surface images. Comparisons with manual tests validated its measuring accuracy. As a result, the methodology presented in this paper can increase the reliability of concrete surface quality assessment