64 resultados para consultation
em Aquatic Commons
Resumo:
In February 1996 "A Strategy for the Management of Salmon in England and Wales" was launched by the then National Rivers Authority. The strategy concentrates on four main objectives for the management of salmon fisheries in England and Wales. These are primarily aimed at securing the well being of the stock but in doing so will strive to improve catches and any associated economic returns to the fisheries: (i) Optimise the number of salmon returning to homewater fisheries. (ii) Maintain and improve the fitness and diversity of salmon stocks. , (iii) Optimise the total economic value of surplus stocks. (iv) Ensure necessary costs are met by beneficiaries. These four objectives will be addressed through local Salmon Action Plans (SAPs) which will be produced for each of the principle salmon rivers in England and Wales by the year 2001. Each plan will review the status of the stock and the fisheries on a particular river, seek to identify the main factors limiting performance, draw up and cost a list of options to address these, and, consult 0with local interest groups. This report is the draft version of the Salmon Action Plan for the River Lune.
Resumo:
This consultation document sets out the proposed future licensing strategy for the Lune Catchment Abstraction Management Strategy (CAMS) area. Following the three month consultation period, the Environment Agency will determine the final licensing strategy and publish it in the CAMS document. The strategy will provide an indication of whether new abstraction licences are likely to be available and the conditions that should be expected on licences. Water plays a vital role in the Lune catchment, providing water for public supply, supporting recreation, such as angling and canoeing, and providing sustainable flows to preserve numerous designated sites. There is minimal abstraction throughout much of the catchment, apart from the lower reaches of the River Lune. The document is split into five sections relating to the CAMS process. Sections 1 to 4 outline the CAMS process, and Section 5 outlines the proposed licensing strategy for the Lune CAMS areas. It is important to note that this strategy deals with groundwater and surface water abstractions separately; Sections 4 and 5 are split to differentiate between the surface water and groundwater results and strategy.
Resumo:
In February 1996, the National Salmon Management Strategy was launched by the Environment Agency's predecessor the National Rivers Authority (NRA, 1996). The strategy concentrates on four main objectives for the management of salmon fisheries in England and Wales. These are primarily aimed at securing the well being of the stock, but in doing so will improve catches and the associated economic returns to the fisheries. The four main objectives are : (i) Optimise the number of salmon returning to home water fisheries, (ii) Maintain and improve fitness and diversity of salmon stocks. (Hi) Optimise the total economic value of surplus stocks, (iv) Ensure necessary costs are met by beneficiaries
Resumo:
This is the River Camel Salmon Action Plan produced by the Environment Agency in 2002. The report focuses on the River Camel Salmon Action Plan (SAP). The River Camel SAP follows the format of those completed for the Rivers Tamar, Lynher and Tavy. It is the 4th of 7 action plans that will be produced for salmon rivers managed by the Cornwall Area Fisheries, Recreation and Biodiversity Team. This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. In addition, for the first time, Salmon Action Plans have attempted to evaluate in economic terms, all of the contributory components of the salmon fishery. The River Camel Salmon Action Plan contains a description of the river catchment and highlights particular features that are relevant to the salmon population and associated fishery.
Resumo:
This is the River Fowey Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Fowey Salmon Action Plan (SAP). The River Fowey SAP follows the format of those completed for the Rivers Tamar, Lynher, Tavy and Camel. It is the 5th of 7 action plans that will be produced for salmon rivers managed by the Cornwall Area Fisheries, Recreation and Biodiversity Team. This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Fowey SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. Notably, there are historic workings for copper and china clay and two significant potable supply reservoirs (Siblyback and Colliford) which have been constructed within the catchment during the past 35 years. The whole of the Fowey catchment is set at the highest water quality grading of RE1 and this standard is met in all reaches of the River Fowey and its tributaries.
Resumo:
This is the River Lynher Salmon Action Plan Consultation document produced by the Environment Agency in 1998. The report pays attention on the external consultation of the River Lynher Salmon Action Plan (SAP). The River Lynher SAP follows that for the River Tamar and is the second of seven action plans that will be produced for salmon rivers managed by the Cornwall area fisheries department. This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Lynher SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The analysis of recent and historical catches of salmon on the River Lynher from both the rod and net fisheries indicated the fishery's reliance upon post 1 June salmon. Historically, annual salmon catches (both rod and net) on the River Lynher have been found to consist of a much higher proportion of pre 1 June (spring) salmon. Evidence is provided that illustrates the extent of the decline within this stock component since the early 1980s.
Resumo:
This is the River Plym Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Plym Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Plym SAP follows the format of those completed for the rivers Tamar, Lynher, Tavy, Camel and Fowey. It is the sixth of seven action plans that will be produced for salmon rivers managed by Cornwall Area. The River Plym SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. Notably, there are historic workings for china clay and a significant potable water supply at Burrator Reservoir. The main River Plym has been designated as River Ecosystem class 1 for its water quality objectives. This is the highest water quality target set for rivers. This standard has been met in all reaches of the main River Plym and River Meavy.
Resumo:
This is the River Tamar Salmon Action Plan Consultation document produced by the Environment Agency in 1998. The report pays attention on the external consultation of the River Tamar Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Tamar was one of the premier salmon rivers in the West Country, supporting fifteen licensed estuary nets, and the second highest rod catch behind the River Exe. The River Tamar SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery.
Resumo:
This is the River Tavy Salmon Action Plan Consultation document produced by the Environment Agency in 1999. The report pays attention on the external consultation of the River Tavy Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. In addition, salmon action plans have for the first time, attempted to evaluate in economic terms, all of the contributory components of the salmon fishery. The River Tavy Salmon Action Plan follows that for the River Tamar and River Lynher and is the third of seven action plans that will be produced for salmon rivers managed by the Cornwall Area FER department. The River Tavy SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery.
Resumo:
This is the River Yealm Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Yealm Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Yealm Salmon Action Plan follows the format of those completed for the rivers Tamar, Lynher, Tavy, Camel, Fowey and Plym. It is the final one of seven action plans that will be produced for salmon rivers managed by Cornwall Area. The River Yealm SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. Notably there are potable water abstractions in the headwaters, workings for china clay on the main tributary, two inert waste landfill sites and an aggregate quarry adjacent to the main river and inputs from several Sewage Treatment Works (STW) and two industrial estates. The main River Yealm has been designated as River Ecosystem Class 1 for its water quality objectives. This is the highest water quality target set for rivers.
Resumo:
This is the Rivers Avon & Erme Salmon Action Plan Consultation document produced by the Environment Agency in 2003. This document is part of a national initiative to produce action plans for the management of all the main salmon rivers of England and Wales by 2003. The aim of this plan is (i) to assess the status of the salmon stocks and fisheries of the rivers Avon and Erme - including the use of Conservation Limits as part of this process, (ii) to identify factors which may limiting stock and fishery performance and (iii) to propose remedial measures address these factors. The report pays attention on the external consultation of the Rivers Avon & Erme Salmon Action Plan (SAP). While the stocks of both rivers have exceeded their respective conservation limits occasionally in individual years, only the Erme has achieved a period of statistical compliance since 1993. It is possible that this situation is largely normal, due to the steep nature of the rivers, obstructions to migration and dependence on suitable flow conditions occurring at the right time of year. The decline of the spring-running component of the stocks has left the populations dependent on autumn flows for the success of the late running component. Actions required to improve compliance with Conservation Limits are proposed and prioritised. The urgent actions relate to the need to improve the consistency with which adequate numbers of salmon reach and utilise fully all the accessible areas of the river systems. This document is intended to be dynamic, with opportunities for review occurring at regular intervals. For example, as the science of fisheries management improves, particularly in the setting of Conservation Limits, so the targets may be altered to reflect any improved methodology.
Resumo:
This is the River Axe Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Axe Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. This document is part of a national initiative to produce action plans for the management of all the main salmon rivers of England and Wales by 2003. The aim of this plan is (i) to assess the status of the salmon stocks and fisheries of the River Axe - including the use of Conservation Limits as part of this process, (ii) to identify factors which may be limiting stock and fishery performance and (iii) to propose remedial measures address these factors. The salmon stock of the River Axe was apparently in a healthy state in the 1950s, supporting net and rod fisheries with average annual catches of around 100 and 50 fish respectively. Catches declined through the 1970s and 1980s to the extent where no salmon were recorded in the late 1980s and early 1990s. This decline was probably due largely to the effects of agricultural pollution, which virtually extinguished the salmon stock of the River Axe. Water quality has subsequently improved, but has deteriorated again in recent years.
Resumo:
This is the River Dart Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Dart Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The north of the River Dart catchment is included in the Dartmoor candidate Special Area of Conservation (cSAC), designated under the Council EC Directive 92/43/EEC, the “Habitats Directive”. One of the conservation objectives for the cSAC is to maintain the habitat for Atlantic Salmon, Salmo Salar in favourable condition. The River Dart is an important salmon, sea trout and brown trout fishery with no significant coarse fishery. However, eels are ubiquitous throughout the catchment and are lightly exploited. The River Dart SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery.
Resumo:
This is the River Exe Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Exe Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Exe SAP follows the format of those completed for the Rivers Teign, Torridge, Taw and Dart. It is the fifth of eight action plans that will be produced for salmon rivers within Devon Area. The River Exe SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The Exe salmon stock is judged to be meeting its Conservation Limit. However, this assessment is uncertain as it is based on an estimate of rod exploitation rate, which in itself is also uncertain. At present there is no means of accurately assessing the River Exe salmon run. In common with many other rivers, estimation of stock using catch statistics and rod exploitation rate is the model used, when direct assessment is not possible. The installation of a fish counter on the lower river, or the use of other direct counting methods, would help to provide a direct assessment of the annual run of salmon into the river. This would improve our ability to estimate the spawning escapement and hence assess compliance with the Conservation Limit.
Resumo:
This is the River Lyn Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Lyn Salmon Action Plan (SAP). This approach to salmon management within the England and Wales introduces the concept of river-specific Conservation Limits as a method of assessing the status of the salmon stock. The River Lyn Salmon Action Plan follows the format of those completed for the Rivers Exe, Axe, Avon & Erme, Teign, Torridge, Taw and Dart. It is the last of eight action plans that have been produced for salmon rivers within Devon Area. The River Lyn Salmon Action Plan contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The Lyn salmon stock is judged to be meeting its Conservation Limit. However, this assessment is uncertain as it is based on an estimate of rod exploitation rate, which in itself is also uncertain.