2 resultados para Thermal barrier
em Aquatic Commons
Resumo:
The Buniyar hydroelectric project and the lower Jhelum Barrier at Gantamulla constructed across river Jhelum are in operation from several years. The two power stations have changed the hydrological features of the area where dam is situated. Therefore, the impact of hydroelectric projects on fishery resources of river Jhelum is a matter of great concern. The treated water from the power house is released through turbines, having cooling effect on them. The change in the hydrological parameters such as increase in temperature, depletion of oxygen etc. might have brought fishes under stress which is the main cause in decreased population of finfishes from site to site. The golden mahseer, Tor putitora which was once an abundant species in river Jhelum has disappeared due to human intervention. The prevailing water quality around hydroelectric projects is unsuitable for finfishes of river Jhelum.
Resumo:
The commercial development of ocean thermal energy conversion (OTEC) operations will involve some environmental perturbations for which there is no precedent experience. The pumping of very large volumes of warm surface water and cold deep water and its subsequent discharge will result in the impingement, entrainment, and redistribution of biota. Additional stresses to biota will be caused by biocide usage and temperature depressions. However, the artificial upwelling of nutrients associated with the pumping of cold deep water, and the artificial reef created by an OTEC plant may have positive effects on the local environment. Although more detailed information is needed to assess the net effect of an OTEC operation on fisheries, certain assumptions and calculations are made supporting the conclusion that the potential risk to fisheries is not significant enough to deter the early development of IDEe. It will be necessary to monitor a commercial-scale plant in order to remove many of the remaining uncertainties. (PDF file contains 39 pages.)