2 resultados para Soil structure.

em Aquatic Commons


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Planktonic community in floodplain wetlands embodies the energy transfer through this phase and indicates trophic status of lake. Originally rich bottom coupled with a conducive physicochemical environment encourages fast colonization of the plankton population. Present investigation was carried out in two floodplain wetlands having characteristics of open (Amda beel) and closed (Suguna beel) system. The physicochemical parameters of water and soil of the investigated heels were by and large conducive for planktonic growth. The density of plankton population varied between 1,346 and 2,170 u/l in Suguna bed whereas in Amda beel it ranged from 1,030 to 1,802 u/l. Seasonal fluctuations in water column were conspicuous and mostly dependent on the replenished resources and volume, A mixed and balanced population of diversified fauna constituted the plankton population of the investigated ecosystems. Mostly the diversity was observed to be maximum during winter seasons with coincidence of favorable temperature, dissolved oxygen and other physico-chemical parameters of water besides optimum solar penetration. Richness of planktonic structure in closed system (Suguna) resulted in higher fish production (1,570,05 kg/ha/yr) than that of open system (Amda) (384.4 kg/ha/yr).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Offshore structures with numerous applications in different environments throughout the world and used at different depths. Due to the expansion of marine industries, including offshore oil industry in Iran , particularly in the Persian Gulf region, in order to more accurately model these structures and to prevent incidents such as the Overturning of the platform serious damage to the South Pars Phase ١٣ was platforms, the use New Technic is essential technologies. One of the methods that are used in the construction of offshore wind turbines, using a pre-pile. In this method, a template is constructed with the dimensions specified in the workshop. After making templates using special vessels for placement in the desired location on the sea bed is carried, then the template is placed on the sea bed, Then, using a hammer for Pile Driving Operation Started Vibration hammer and fit the template of 3 or 4 piles of crushed within this template on the seabed . The next step piling, templates have been removed from the site And Jacket placed on piles. The system was installed on the deck on piles and Consequently Deck Load pile inserted on .It should be noted that the design of these types of platforms, base diameter of the pile diameter independent of the choice as one of the major advantages of this system is. This thesis examines a Template Fixed Platform in the oil Soroush Using the Pre-Piling and the Common Piling systems in the Persian Gulf were studied and the effect of different design compared to the Pre-Piling Platforms Persian Gulf were evaluated. The results suggest that Pre-Piling system compared with conventional systems piling in the Persian Gulf, as a more appropriate model structure and behavior Top Model economic efficiency is selected. It should be noted that all calculations and analyzes were performed using Software Abaqus.