396 resultados para Snowy River catchment
em Aquatic Commons
Resumo:
The River Darwen is a highly impacted Lancashire river with very little known about its fishery interest above the impassable weir at Salmesbury Bottoms. Below the weir there are populations of coarse fish around the confluence with the River Ribble. To the knowledge of local bailiff staff, prior to 1996 the fish population in the middle and upper River Darwen had never been surveyed by electric fishing. In order to address this lack of knowledge, a survey was undertaken during the summer of 1996 with the aim of evaluating the salmonid and cyprinid fish population in the river. Twenty two sites were surveyed by electric fishing between June 11th and July 11th 1996. Information was gathered on the presence and density of fish populations in the river catchment, and analysed according to the National Fisheries Classification Scheme in order to determine how these populations compare nationally with sites of similar habitat features. From this report, recommendations were made to improve and develop the fishery potential in relation to water quality and habitat prioritising areas classed as being Ashless. It was recommended that juvenile coarse fish should be stocked in the Houghton Bottoms area. This area has excellent fishery habitat and was found to contain a minor coarse fish population. Water quality in this stretch of river was thought to be good enough to establish a major coarse fish population. Fish were introduced for the first time in 1998 at Houghton Bottoms from the Agency's Leyland Fish Farm. 3000 each of Roach, Chub and Dace were introduced. Further fish introductions occurred in 2000 with the stocking of 1000 Chub, again from the Agency's Leyland Fish Farm in the Lower Darwen and Witton areas of the main river on a trial basis.
Resumo:
The Hawkesbury-Nepean River in New South Wales (NSW), Australia, is the largest river system in the Sydney metropolitan area, and it drains most of the developing areas to the west. This catchment is under increasing pressure from urban expansion and the river frequently experiences extended periods of low flows due to a combination of extensive river regulation and the Australian temperate climate. Added to this, the river and several of its tributaries receive treated sewage and stormwater from various sources. Habitats and biota within the Hawkesbury-Nepean River catchment have been altered since European settlement and many introduced species have spread throughout the terrestrial and aquatic environment (Recher et al. 1993). Submersed macrophyte assemblages within the river have undergone significant changes in their distribution and abundance due to eutrophication, habitat alteration and changes to river flows (Recher et al 1993). Anecdotal evidence and some early unpublished studies suggest that egeria (Egeria densa Planchon), introduced from South America as an aquarium plant, was present in the Hawkesbury-Nepean River prior to 1980. Sainty (1973) reported a persistent and troublesome infestation over a number of years at Wallacia in the upper Nepean River. Here, as part of a larger study on the ecology of macrophyte and invertebrate assemblages associated with anthropogenic disturbance in the Hawkesbury-Nepean River, we document the rapid spread of egeria since 1994. Significant increases in egeria biomass were also found, and we present preliminary evidence which suggest that the native ribbonweed, vallisneria (Vallisneria americana Michx.) is being displaced.
Resumo:
This is the River Camel Salmon Action Plan produced by the Environment Agency in 2002. The report focuses on the River Camel Salmon Action Plan (SAP). The River Camel SAP follows the format of those completed for the Rivers Tamar, Lynher and Tavy. It is the 4th of 7 action plans that will be produced for salmon rivers managed by the Cornwall Area Fisheries, Recreation and Biodiversity Team. This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. In addition, for the first time, Salmon Action Plans have attempted to evaluate in economic terms, all of the contributory components of the salmon fishery. The River Camel Salmon Action Plan contains a description of the river catchment and highlights particular features that are relevant to the salmon population and associated fishery.
Resumo:
This is the River Fowey Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Fowey Salmon Action Plan (SAP). The River Fowey SAP follows the format of those completed for the Rivers Tamar, Lynher, Tavy and Camel. It is the 5th of 7 action plans that will be produced for salmon rivers managed by the Cornwall Area Fisheries, Recreation and Biodiversity Team. This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Fowey SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. Notably, there are historic workings for copper and china clay and two significant potable supply reservoirs (Siblyback and Colliford) which have been constructed within the catchment during the past 35 years. The whole of the Fowey catchment is set at the highest water quality grading of RE1 and this standard is met in all reaches of the River Fowey and its tributaries.
Resumo:
This is the River Lynher Salmon Action Plan Consultation document produced by the Environment Agency in 1998. The report pays attention on the external consultation of the River Lynher Salmon Action Plan (SAP). The River Lynher SAP follows that for the River Tamar and is the second of seven action plans that will be produced for salmon rivers managed by the Cornwall area fisheries department. This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Lynher SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The analysis of recent and historical catches of salmon on the River Lynher from both the rod and net fisheries indicated the fishery's reliance upon post 1 June salmon. Historically, annual salmon catches (both rod and net) on the River Lynher have been found to consist of a much higher proportion of pre 1 June (spring) salmon. Evidence is provided that illustrates the extent of the decline within this stock component since the early 1980s.
Resumo:
This is the River Plym Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Plym Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Plym SAP follows the format of those completed for the rivers Tamar, Lynher, Tavy, Camel and Fowey. It is the sixth of seven action plans that will be produced for salmon rivers managed by Cornwall Area. The River Plym SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. Notably, there are historic workings for china clay and a significant potable water supply at Burrator Reservoir. The main River Plym has been designated as River Ecosystem class 1 for its water quality objectives. This is the highest water quality target set for rivers. This standard has been met in all reaches of the main River Plym and River Meavy.
Resumo:
This is the River Tamar Salmon Action Plan Consultation document produced by the Environment Agency in 1998. The report pays attention on the external consultation of the River Tamar Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Tamar was one of the premier salmon rivers in the West Country, supporting fifteen licensed estuary nets, and the second highest rod catch behind the River Exe. The River Tamar SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery.
Resumo:
This is the River Tavy Salmon Action Plan Consultation document produced by the Environment Agency in 1999. The report pays attention on the external consultation of the River Tavy Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. In addition, salmon action plans have for the first time, attempted to evaluate in economic terms, all of the contributory components of the salmon fishery. The River Tavy Salmon Action Plan follows that for the River Tamar and River Lynher and is the third of seven action plans that will be produced for salmon rivers managed by the Cornwall Area FER department. The River Tavy SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery.
Resumo:
This is the River Yealm Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Yealm Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Yealm Salmon Action Plan follows the format of those completed for the rivers Tamar, Lynher, Tavy, Camel, Fowey and Plym. It is the final one of seven action plans that will be produced for salmon rivers managed by Cornwall Area. The River Yealm SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. Notably there are potable water abstractions in the headwaters, workings for china clay on the main tributary, two inert waste landfill sites and an aggregate quarry adjacent to the main river and inputs from several Sewage Treatment Works (STW) and two industrial estates. The main River Yealm has been designated as River Ecosystem Class 1 for its water quality objectives. This is the highest water quality target set for rivers.
Resumo:
This is the River Dart Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Dart Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The north of the River Dart catchment is included in the Dartmoor candidate Special Area of Conservation (cSAC), designated under the Council EC Directive 92/43/EEC, the “Habitats Directive”. One of the conservation objectives for the cSAC is to maintain the habitat for Atlantic Salmon, Salmo Salar in favourable condition. The River Dart is an important salmon, sea trout and brown trout fishery with no significant coarse fishery. However, eels are ubiquitous throughout the catchment and are lightly exploited. The River Dart SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery.
Resumo:
This is the River Exe Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Exe Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Exe SAP follows the format of those completed for the Rivers Teign, Torridge, Taw and Dart. It is the fifth of eight action plans that will be produced for salmon rivers within Devon Area. The River Exe SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The Exe salmon stock is judged to be meeting its Conservation Limit. However, this assessment is uncertain as it is based on an estimate of rod exploitation rate, which in itself is also uncertain. At present there is no means of accurately assessing the River Exe salmon run. In common with many other rivers, estimation of stock using catch statistics and rod exploitation rate is the model used, when direct assessment is not possible. The installation of a fish counter on the lower river, or the use of other direct counting methods, would help to provide a direct assessment of the annual run of salmon into the river. This would improve our ability to estimate the spawning escapement and hence assess compliance with the Conservation Limit.
Resumo:
This is the River Lyn Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Lyn Salmon Action Plan (SAP). This approach to salmon management within the England and Wales introduces the concept of river-specific Conservation Limits as a method of assessing the status of the salmon stock. The River Lyn Salmon Action Plan follows the format of those completed for the Rivers Exe, Axe, Avon & Erme, Teign, Torridge, Taw and Dart. It is the last of eight action plans that have been produced for salmon rivers within Devon Area. The River Lyn Salmon Action Plan contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The Lyn salmon stock is judged to be meeting its Conservation Limit. However, this assessment is uncertain as it is based on an estimate of rod exploitation rate, which in itself is also uncertain.
Resumo:
This is the River Teign Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Teign Salmon Action Plan (SAP). This approach to salmon management within the England and Wales introduces the concept of river-specific Conservation Limits as a method of assessing the status of the salmon stock. The River Teign Salmon Action Plan follows the format of those completed for the Rivers Torridge, Taw and Dart. It is the fourth of eight action plans that will be produced for salmon rivers within the Devon Area Fisheries, Recreation and Biodiversity Team. The River Teign SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The Teign salmon stock is currently failing to meet its conservation limit. This failure is largely attributed to the reduction in the survival rate during the marine phase of the salmon life cycle. This is likely to constrain stocks to lower levels than have existed historically. Still further catch controls may contribute to a reduction in exploitation rates and allow stocks to recover to meet their conservation limit. Other important actions include the continuation of habitat improvement works which aim to maximise spawning habitat utilisation, spawning success, and juvenile survival and production.
Resumo:
As part of the River Lune juvenile salmonid investigation, a number of sites on the River Wenning catchment were electrofished annually from 1981 - 1985. Particularly low Salmon parr populations were evident for much of the Wenning catchment which has caused some concern. All the Wenning catchment electrofishing results are reported in this paper and comparisons are made with designated groups of sites on the remainder of the Lune catchment. These groups of sites are: River Lune and tributaries, upstream Tebay, Upper Middle Lune, Lower Middle Lune, Lower Lune, Birk & Borrow Becks, Chapel & Crosdale Becks, Rawthey system, Barbon & Leek Becks and the Greta system. The general scarcity of Salmonids in large sections of the main river Wenning probably reflects the apparent limited natural spawning areas on the catchment. Details of Salmon fry and ova planting on the Wenning catchment since 1981 have been collated and whilst survival through the 0+ stage appears to be quite good, recruitment to the 1++ stage appears to be poor. Water quality does not appear to be responsible for the very low salmonid densities at some main river sites but is possibly a factor in apparently preventing any Salmon run in Keasden Beck. Recommendations for future Fisheries and Biological work are given.
Resumo:
The aim of this study was to assess the status of the juvenile salmonid populations of the River Lune and its tributaries. There was special emphasis on juvenile salmon stocks in view of the implementation of a net limitation order in 1980. The number of licensed instruments were reduced as follows: (1) Drift, hang or whammel nets - from 12 to 10 (2) Draft or seine nets - from 3 to 1 (3) Heave or haaf nets - from 4 6 to 2 6 For the purpose of this report, the River Lune system has been divided into 13 subcatchments and these are examined with a view to detecting any trends in the data such as subcatchment productivity, partitioning between salmon and trout nursery streams, and whether the restrictions on salmon fishing had any discernible effects on juvenile salmon productivity. The effect of flow and instream obstructions on salmonid densities are also investigated as these have been shown to be important factors affecting abundance. Throughout the study period a programme of enhancement stocking took place primarily with salmon ova and fry. The possible impact of this on the results of the surveys has been assessed. The distribution and abundance of juvenile salmon was found to be relatively consistent in each of the 13 subcatchments studied over the 1981-1985 period.