9 resultados para Natura (Firma)
em Aquatic Commons
Resumo:
Taxonomic observations on the larval forms of Cyclops leuckarti are being discussed and compared with Cyclops oithonoides var. hyalina. Observations include Nauplius and Metanauplius stages. The author concludes that specific differences are recognisable even in the nauplius stages.
Resumo:
This is the Habitats regulations for stage 3 assessments: radioactive substances authorisations report from the Environment Agency, published on October 2003. The report focuses on the stage 3 assessments of radioactive substances authorisations in UK (to take place over the next five years, starting in 2003), which may have a potential impact on European designated Natura 2000 sites such Special Protection Areas (SPA), Special Areas of Conservation (SAC); and thus require further detailed assessment. This Environment Agency R&D project was commissioned to ERC, University o f Liverpool, in conjunction with Westlakes Scientific Consulting and the Centre for Ecology and Hydrology, as part o f the agency's preparation for the Stage 3 Assessments o f radioactive substances authorisations. The aim was to prepare site information sheets containing all data relevant for individual Natura 2000 sites needing Stage 3 Assessment and to stylise and represent species that require protection under the Habitats Regulations by the reference organism geometries listed in R&D Publication 128 (Copplestone et al., 2001).
Resumo:
This is the report on Habitats Directive, the Review of Consents Stage 1 and 2 by the Environment Agency of the Manchester Mosslands cSAC, Astley and Bedford Moss, Holcroft Moss and Risley Moss. The Habitats Directive has the main aim to promote the maintenance of biodiversity by defining a common framework for the conservation of wild plants and animals and habitats of community interest. The Directive establishes a European ecological network known as "Natura 2000". The network comprises Special Areas of Conservation (SAC) and Special Protection Areas (SPA). In the section on Stage 1 or Screening Process of the Habitat Directive, it is identified the likely impacts upon the Manchester Mosslands cSAC, Astley and Bedford Moss, Holcroft Moss and Risley Moss of a project, plan or activities, either alone or in combination with other projects, plans or activities, and considers whether these impacts are likely to be significant. In the section on Stage 2 or Appropiate Assessment of the Habitat Directive, it is considered the impact on the integrity of the Manchester Mosslands cSAC, Astley and Bedford Moss, Holcroft Moss and Risley Moss of the projects, plans or activities, either alone or in combination with other projects, plans or activities, with respect to the site’s structure and function and its conservation objectives. Additionally, where these are adverse impacts, an assessment of the potential mitigation of those impacts. The criteria used in this report to identify relevant projects, plans or activities and their impacts are water quality discharge consents, waste management licences, abstraction licences, Integration Pollution Control (IPC) and Integrated Pollution Prevention Control (IPPC) permits. Proformas, hydrogeological and GIS maps are included in the review.
Resumo:
This is the report on Habitats Directive, the Review of Consents Stage 1 and 2 by the Environment Agency of the Rixton Clay Pits cSAC. The Habitats Directive has the main aim to promote the maintenance of biodiversity by defining a common framework for the conservation of wild plants and animals and habitats of community interest. The Directive establishes a European ecological network known as "Natura 2000". The network comprises Special Areas of Conservation (SAC) and Special Protection Areas (SPA). In the section on Stage 1 or Screening Process of the Habitat Directive, it is identified the likely impacts upon the Rixton Clay Pits cSAC of a project, plan or activities, either alone or in combination with other projects, plans or activities, and considers whether these impacts are likely to be significant. In the section on Stage 2 or Appropiate Assessment of the Habitat Directive, it is considered the impact on the integrity of the Rixton Clay Pits cSAC of the projects, plans or activities, either alone or in combination with other projects, plans or activities, with respect to the site’s structure and function and its conservation objectives. Additionally, where these are adverse impacts, an assessment of the potential mitigation of those impacts. The criteria used in this report to identify relevant projects, plans or activities and their impacts are water quality discharge consents, waste management licences, abstraction licences, Integration Pollution Control (IPC) and Integrated Pollution Prevention Control (IPPC) permits. Proformas, hydrogeological and GIS maps are included in the review.
Resumo:
This is the report on Habitats Directive, the Review of Consents Stage 1 and 2 by the Environment Agency of the South Pennine Moors cSAC/SPA. The Habitats Directive has the main aim to promote the maintenance of biodiversity by defining a common framework for the conservation of wild plants and animals and habitats of community interest. The Directive establishes a European ecological network known as "Natura 2000". The network comprises Special Areas of Conservation (SAC) and Special Protection Areas (SPA). In the section on Stage 1 or Screening Process of the Habitat Directive, it is identified the likely impacts upon the Rixton Clay Pits cSAC of a project, plan or activities, either alone or in combination with other projects, plans or activities, and considers whether these impacts are likely to be significant. In the section on Stage 2 or Appropiate Assessment of the Habitat Directive, it is considered the impact on the integrity of the Rixton Clay Pits cSAC of the projects, plans or activities, either alone or in combination with other projects, plans or activities, with respect to the site’s structure and function and its conservation objectives. Additionally, where these are adverse impacts, an assessment of the potential mitigation of those impacts. The criteria used in this report to identify relevant projects, plans or activities and their impacts are water quality discharge consents, waste management licences, abstraction licences, Integration Pollution Control (IPC) and Integrated Pollution Prevention Control (IPPC) permits. Proformas, hydrogeological and GIS maps are included in the review.
Resumo:
This is the report on Habitats Directive, the Review of Consents Stage 1 and 2 by the Environment Agency of the Rochdale Canal cSAC. The Habitats Directive has the main aim to promote the maintenance of biodiversity by defining a common framework for the conservation of wild plants and animals and habitats of community interest. The Directive establishes a European ecological network known as "Natura 2000". The network comprises Special Areas of Conservation (SAC) and Special Protection Areas (SPA). In the section on Stage 1 or Screening Process of the Habitat Directive, it is identified the likely impacts upon the Rochdale Canal of a project, plan or activities, either alone or in combination with other projects, plans or activities, and considers whether these impacts are likely to be significant. In the section on Stage 2 or Appropiate Assessment of the Habitat Directive, it is considered the impact on the integrity of the Rochdale Canal of the projects, plans or activities, either alone or in combination with other projects, plans or activities, with respect to the site’s structure and function and its conservation objectives. Additionally, where these are adverse impacts, an assessment of the potential mitigation of those impacts. The criteria used in this report to identify relevant projects, plans or activities and their impacts are water quality discharge consents, waste management licences, abstraction licences, Integration Pollution Control (IPC) and Integrated Pollution Prevention Control (IPPC) permits. Proformas, hydrogeological and GIS maps are included in the review.
Resumo:
This is the report on Habitats Directive, the Review of Consents Stage 1 and 2 by the Environment Agency of the West Midlands Mosses cSAC, Wybunbury Moss and Abbots Moss. The Habitats Directive has the main aim to promote the maintenance of biodiversity by defining a common framework for the conservation of wild plants and animals and habitats of community interest. The Directive establishes a European ecological network known as "Natura 2000". The network comprises Special Areas of Conservation (SAC) and Special Protection Areas (SPA). In the section on Stage 1 or Screening Process of the Habitat Directive, it is identified the likely impacts upon the West Midlands Mosses cSAC, Wybunbury Moss and Abbots Moss of a project, plan or activities, either alone or in combination with other projects, plans or activities, and considers whether these impacts are likely to be significant. In the section on Stage 2 or Appropiate Assessment of the Habitat Directive, it is considered the impact on the integrity of the West Midlands Mosses cSAC, Wybunbury Moss and Abbots Moss of the projects, plans or activities, either alone or in combination with other projects, plans or activities, with respect to the site’s structure and function and its conservation objectives. Additionally, where these are adverse impacts, an assessment of the potential mitigation of those impacts. The criteria used in this report to identify relevant projects, plans or activities and their impacts are water quality discharge consents, waste management licences, abstraction licences, Integration Pollution Control (IPC) and Integrated Pollution Prevention Control (IPPC) permits. Proformas, hydrogeological and GIS maps are included in the review.
Resumo:
This is the report on Habitats Directive, the Review of Consents Stage 1 and 2 by the Environment Agency of the Oak Mere cSAC. The Habitats Directive has the main aim to promote the maintenance of biodiversity by defining a common framework for the conservation of wild plants and animals and habitats of community interest. The Directive establishes a European ecological network known as "Natura 2000". The network comprises Special Areas of Conservation (SAC) and Special Protection Areas (SPA). In the section on Stage 1 or Screening Process of the Habitat Directive, it is identified the likely impacts upon the Oak Mere cSAC of a project, plan or activities, either alone or in combination with other projects, plans or activities, and considers whether these impacts are likely to be significant. In the section on Stage 2 or Appropiate Assessment of the Habitat Directive, it is considered the impact on the integrity of the Oak Mere cSAC of the projects, plans or activities, either alone or in combination with other projects, plans or activities, with respect to the site’s structure and function and its conservation objectives. Additionally, where these are adverse impacts, an assessment of the potential mitigation of those impacts. The criteria used in this report to identify relevant projects, plans or activities and their impacts are water quality discharge consents, waste management licences, abstraction licences, Integration Pollution Control (IPC) and Integrated Pollution Prevention Control (IPPC) permits. Proformas, hydrogeological and GIS maps are included in the review.
Resumo:
A brief outline is given of the Philippine seaweed industry, which involves mainly the red seaweed Kappaphycus alvarezii, produced as a source of the semi-refined or Philippine natural grade (PNG) carrageenan. Other species cultured and marketed include: Gracilaria changii, G. firma, G. heteroclada, G. manilaensis and G. tenuistipitata. The Philippines has the largest carrageenan refinery in Asia. However, production of seaweeds is rather erratic, which is attributed to the following factors: 1) indiscriminate harvesting, seasonal abundance of different species in different areas and lack of proper management; 2) shortage and deteriorating quality of seedlings, especially for Kappaphycus; and 3) natural calamities.