7 resultados para Mosses
em Aquatic Commons
Resumo:
In a previous paper relating to a singular new fern (Polypodium podocarpum) from Panama, I have described very briefly the mountian (sp) region above David in the province of Chiriqui, and have referred in particular to a most interesting collecting trip of three days which I took from El Boquete over "Holcomb's trail" along the Rio Caldera to "Camp I" and to the summit of the Continental Divide a few miles farther on...(Document contains 9 pages)
Resumo:
This study focusses on the plants in the open parts of the lake - mostly aquatic charophytes and mosses, in what are called in Lake Sevan (Armenia), the ”zones of chara and moss”. Distribution and other ecological conditions are reviewed. Quantity of chara in the littoral zone of lake Sevan is provided
Resumo:
This is the report on Habitats Directive, the Review of Consents Stage 1 and 2 by the Environment Agency of the West Midlands Mosses cSAC, Wybunbury Moss and Abbots Moss. The Habitats Directive has the main aim to promote the maintenance of biodiversity by defining a common framework for the conservation of wild plants and animals and habitats of community interest. The Directive establishes a European ecological network known as "Natura 2000". The network comprises Special Areas of Conservation (SAC) and Special Protection Areas (SPA). In the section on Stage 1 or Screening Process of the Habitat Directive, it is identified the likely impacts upon the West Midlands Mosses cSAC, Wybunbury Moss and Abbots Moss of a project, plan or activities, either alone or in combination with other projects, plans or activities, and considers whether these impacts are likely to be significant. In the section on Stage 2 or Appropiate Assessment of the Habitat Directive, it is considered the impact on the integrity of the West Midlands Mosses cSAC, Wybunbury Moss and Abbots Moss of the projects, plans or activities, either alone or in combination with other projects, plans or activities, with respect to the site’s structure and function and its conservation objectives. Additionally, where these are adverse impacts, an assessment of the potential mitigation of those impacts. The criteria used in this report to identify relevant projects, plans or activities and their impacts are water quality discharge consents, waste management licences, abstraction licences, Integration Pollution Control (IPC) and Integrated Pollution Prevention Control (IPPC) permits. Proformas, hydrogeological and GIS maps are included in the review.
Resumo:
This is a report on the Conservation Plan for Rostherne Mere. The project primarly involved collating existing information from a variety of sources, supplemented by a limited amount of survey work commissioned for the project, including identification of the surface water catchment, water flows, and land use within the catchment. The section 1 outlines the physical situation of the Site of Special Scientific Interest (SSSI), its geological setting and hydrological regime. A summary of the ecological characteristics, conservation interest and objectives is provided in Section 2, and the issues affecting the site are identified in Section 3. . Operations and mechanisms for addressing the issues are suggested in Section 4, compiled from field visits, information held on file by English Nature and the Environment Agency, and English Nature. The last Section 5 provides a brief summary of the site’s condition and a discussion of the issues and operations suggested. A summary table is provided of the recommended actions for each site. Supporting information on the hydrology and aquatic ecology (where relevant) is provided in appendices.
Resumo:
This paper focuses on the financial analysis involved in setting up of fish farming on a small-scale in a homestead. About 0.5 acres of land was used for the construction of pond which as a stock of Clarias spp/ Heterobranchus spp and Tilapia spp at the ratio of one to three for a period of 12 months. The land/land development cost is N26,500.00, pond construction cost, N35,700.00, equipment cost, N2,650.00 and stock/Input requirement cost N155,727.00 while the revenue from sales is N376,000.00. A cash flow analysis is also calculated for the fish farm, which is N155,423.00 for first year cash flow, and appropriate profit/mosses were calculated for five-year production cycle of N1,036,515.00 million. At the end appreciable profit is realized from the enterprises. This type of enterprises is viable for small-scale farmers to practices and adopted for financial support for their family
Resumo:
The high density of meres and mosses in the Delamere area comes from numerous moraine-hollows formed after the melting of stranded ice-blocks following last glaciation. The main vegetation is of conifers along with some deciduous species and the area was designated as a National Forest Park in 1987. It has been managed since the beginning of the 19th century and is a popular tourist area with walking, orienteering, cycling and educational activities. In recent years this forest park has been attracting over half a million people per year. This paper studies the limnology of different aquatic habitats in the Delamere Forest area in order to give some insight into the waters of a coniferous, temperate forest area, which has so far been largely unexplored. The authors assume therefore, thought that despite apparent large variability in origin, age, surface area, morphometry, catchment size and hydraulic regime, the waters of Delamere Forest might share some revealing chemical and biological features. Seven water-bodies in the Delamere Forest Park area, namely, Black Lake, Blakemere Moss, Delamere Lake, Delamere Quarry, Hatchmere, Windyhowe Farm Spring and Fir Brook were sampled, their water chemistry and dissolved organic carbon and the occurrence of phytoplankton and zooplankton species examined. In a final chapter the authors analyse their findings for patterns.
Resumo:
Pisidium obtusale in the neighbourhood of Borka occurs in deep pools on upland bogs. The majority of water-bodies where this mollusc lives are temporary. Their bottoms are covered with sedges, and sometimes mosses occur. Evidently there is a marked attraction of P. obtusale to places overgrown by willow. In pools remote from scrub or woody vegetation it does not appear. Temporary water-bodies fill up with melt water in the middle or the end of April and finally dry up at the end of July or the beginning of August. Observations on the life cycle of P. obtusale started on 21 April 1966, following on the filling-up of the water-body by melt water. The findings of the study are presented in this paper.