6 resultados para Methods engineering.

em Aquatic Commons


Relevância:

30.00% 30.00%

Publicador:

Resumo:

We evaluated the use of strip-transect survey methods for manatees through a series of replicate aerial surveys in the Banana River, Brevard County, Florida, during summer 1993 and summer 1994. Transect methods sample a representative portion of the total study area, thus allowing for statistical extrapolation to the total area. Other advantages of transect methods are less flight time and less cost than total coverage, ease of navigation, and reduced likelihood of double-counting. Our objectives were: (1) to identify visibility biases associated with the transect survey method and to adjust the counts accordingly; (2) to derive a population estimate with known variance for the Banana River during summer; and (3) to evaluate the potential value of this survey method for monitoring trends in manatee population size over time. (51 page document)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A fixed-bed hydraulic model of Jupiter Inlet, Florida, was constructed for the purpose of testing measures designed to remedy problems of sediment erosion and deposition in the inlet area. Both tide-induced flows as well as waves were simulated in the model which was built on an undistorted scale of 1:49. Model verification was based on prototype measurements of waves, tides and currents. Results have been interpreted in terms of the influence of various proposed remedial schemes on flow velocity magnitude, distribution and wave height at various locations within the study area. A stability parameter has been utilized for evaluating the degree of sediment erosion or deposition at a given location. Various structural solutions were examined in the model. It is proposed that, in the initial phase of solution implementation, sediment removal/nourishment methods be used primarily to mitigate the existing problems. New structures, as per model test results, should be installed under subsequent phases, only if sediment management procedures do not prove to be adequate. The currently followed procedure of periodic sand trap dredging may be extended to include the new dredging/nourishment requirements. (PDF contains 245 pages.)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Most microbiological methods require culture to allow organisms to recover or to selectively increase, and target organisms are identified by growth on specific agar media. Many cultural methods take several days to complete and even then the results require confirmation. Alternative techniques include the use of chromogenic and fluorogenic substances to identify bacteria as they are growing, selective capture using antibodies after short periods of growth, molecular techniques, and direct staining with or without flow cytometry for enumeration and identification. Future microbiologists may not use culture but depend on the use of specific probes and sophisticated detection systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Offshore structures with numerous applications in different environments throughout the world and used at different depths. Due to the expansion of marine industries, including offshore oil industry in Iran , particularly in the Persian Gulf region, in order to more accurately model these structures and to prevent incidents such as the Overturning of the platform serious damage to the South Pars Phase ١٣ was platforms, the use New Technic is essential technologies. One of the methods that are used in the construction of offshore wind turbines, using a pre-pile. In this method, a template is constructed with the dimensions specified in the workshop. After making templates using special vessels for placement in the desired location on the sea bed is carried, then the template is placed on the sea bed, Then, using a hammer for Pile Driving Operation Started Vibration hammer and fit the template of 3 or 4 piles of crushed within this template on the seabed . The next step piling, templates have been removed from the site And Jacket placed on piles. The system was installed on the deck on piles and Consequently Deck Load pile inserted on .It should be noted that the design of these types of platforms, base diameter of the pile diameter independent of the choice as one of the major advantages of this system is. This thesis examines a Template Fixed Platform in the oil Soroush Using the Pre-Piling and the Common Piling systems in the Persian Gulf were studied and the effect of different design compared to the Pre-Piling Platforms Persian Gulf were evaluated. The results suggest that Pre-Piling system compared with conventional systems piling in the Persian Gulf, as a more appropriate model structure and behavior Top Model economic efficiency is selected. It should be noted that all calculations and analyzes were performed using Software Abaqus.