5 resultados para Lean Manufacturing, Make to Order Manufacturing, Time Study, Kanban, Rapid Performance Management

em Aquatic Commons


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fifty four purse-seine boats at Mangalore landing centre were observed during different stages of unloading fish catch. It was found that a boat takes 75% of the berthing time to unload an average quantity of 2.4 tons of fish. Further, unloading period and catch were found to be directly related where it was estimated that 5 to 7 minutes are spent in unloading about half a ton of fish to a nearby tempo by employing 9 ± 2 laborers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The workshop agenda included: presentations from collaborative institutions, national governments and resource persons; a draft scoping study on nutrient loading; and an ecosystem approach to pollution management was tested.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An examination is made of various issues regarding freshwater aquaculture development raised by the IIMA study on inland fish marketing in India. The following topics are discussed: 1)fish production and the resources; 2)desirability for refined methodology for assessment of fish production; 3)pond resource under fish culture; 4)conflicting data and 5)observation on research input for freshwater.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A comparative study of the insulation efficiencies of expanded polystyrene slabs and multi-layer gunny fabric in long distance transportation of fresh iced fish was made. Used plywood boxes (second hand tea chests) were employed as containers and the experiments conducted between Kakinada and Calcutta. All the three insulants tried, namely, 25.4 mm thick expanded polystyrene slab, four and two layer gunny (jute) fabric, all sealed in 150 gauge polythene sheets, showed comparable insulation efficiencies, considering total bacterial counts, organoleptic qualities and TMA and TVN values of the transported fish as parameters.