3 resultados para Hydro-sedimentology
em Aquatic Commons
Resumo:
The Bassam artificial inlet was opened (in September 22, 1987) in order to revacuate offshore invasive aquatic plants. This has considerably modified the hydro-sedimentary environment of the lagoonal domain at Grand-Bassam. Tidal currents effect has confered the lagoonal waters an estuarine feature, the saline intrusion (25-35%o) increased beyond the Moossou bridges up to the confluence of the Comoe river. This has led to a cleaning of the river lower course and above all to the bottoms of the lagoon, which were previously confined. The remobilization of mud (from lagoonal bottoms around Bouet Island) evacuated offshore, has exposed lagoonal and oceanic sandy features. This new system remains fragile, with the seasonal (low river-flow) clogging.
Resumo:
Surface temperature was measured by remote sensing through Cape Lopez (Gulf of Guinea) frontal region during the fishing season in June and July 1972 and 1974. Twelve typical situations are analysed through four main directions: surface situation, tendency, hydrobiological structure and availability to fisheries. The tuna behavior is analysed in relation with the frontal zone movements and a mechanism which tends to aggregate important shoals of tunas is presented.
Resumo:
Human use of water resow-ces in Uganda has grown and intensified along with population growth and increasing demand to meet the diverse human needs. In the case of Uganda's rivers, the main uses include fisheries, hydropower generation, abstraction for potable water supply, discharge of sewage and navigation. All these uses can disrupt the integrity of the aquatic ecosystem and may affect the survival of the diversity of organisms. In consideration of the need to increase electricity to meet demand, the Bujagali Hydro-power Project (BHPP) and the National Environment Management Authority (NEMA) recognised the importance of safeguards to mitigate impacts of the project. The National Fisheries Resources Research Institute (NaFIRRI) was assigned the role of providing baseline information on the aquatic ecosystem of the Upper Victoria Nile and to follow up the findings with a monitoring framework during construction and post-commissioning phases.