2 resultados para Fourth-order methods

em Aquatic Commons


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Today, the use of heavy metals and chemical products industry expanded. The presence of significant amounts of, pollutants in industrial waste water can lead to serious risks to the environment and human health have heavy metals like chromium is one example of the future of salmon knock pond environment. Chromium is an essential element in the diet, but high doses of this element is very dangerous. Hence the use of chemical methods as a tool for the removal of metals from waste water pond be used. The aim of this study was to investigate the mineral kaolin adsorbents for the removal of chromium is water. Thus, the effect of different concentrations of absorbent micro amounts of chromium absorption and variable temperature, pH and electrolytes were studied. During the investigation of spectroscopic instrument (Varian) UV-VIS are used. Comparison of the absorption mechanism of chromium adsorption by the adsorbent with nano-absorbent kaolin kaolin was investigated. According to the studies done in the same conditions of temperature, pH and shaking rate of chromium absorption by nano kaolin kaolin is much more attractive. Therefore, its use as an adsorbent abundant, cheap, accessible, efficient and effective is proposed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Offshore structures with numerous applications in different environments throughout the world and used at different depths. Due to the expansion of marine industries, including offshore oil industry in Iran , particularly in the Persian Gulf region, in order to more accurately model these structures and to prevent incidents such as the Overturning of the platform serious damage to the South Pars Phase ١٣ was platforms, the use New Technic is essential technologies. One of the methods that are used in the construction of offshore wind turbines, using a pre-pile. In this method, a template is constructed with the dimensions specified in the workshop. After making templates using special vessels for placement in the desired location on the sea bed is carried, then the template is placed on the sea bed, Then, using a hammer for Pile Driving Operation Started Vibration hammer and fit the template of 3 or 4 piles of crushed within this template on the seabed . The next step piling, templates have been removed from the site And Jacket placed on piles. The system was installed on the deck on piles and Consequently Deck Load pile inserted on .It should be noted that the design of these types of platforms, base diameter of the pile diameter independent of the choice as one of the major advantages of this system is. This thesis examines a Template Fixed Platform in the oil Soroush Using the Pre-Piling and the Common Piling systems in the Persian Gulf were studied and the effect of different design compared to the Pre-Piling Platforms Persian Gulf were evaluated. The results suggest that Pre-Piling system compared with conventional systems piling in the Persian Gulf, as a more appropriate model structure and behavior Top Model economic efficiency is selected. It should be noted that all calculations and analyzes were performed using Software Abaqus.