4 resultados para Established churches

em Aquatic Commons


Relevância:

20.00% 20.00%

Publicador:

Resumo:

We conducted a field experiment between August 2001 and February 2002 in Kings Bay, FL, USA, designed to determine whether the amount of time allowed for wild celery (Vallisneria americana Michx) transplants to establish altered the effect of herbivorous manatees (Trichechus manatus L.)on their survival.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Some relevant components of selection program theory and implementation are reviewed. This includes pedigree recording, genetic evaluation, balancing genetic gains and genetic diversity and tactical integration of key issues. Lessons learned are briefly described – illustrating how existing method and tools can be useful when launching a program in a novel species, and yet highlighting the importance of proper understanding and custom application according to the biology and environments of that species.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this thesis, producing ability of electricity by horizontal tidal current turbines and installing possibility of these turbines on bridge's piers in the marine environments has been studied to reduce primary implementation costs and make the plan, economical. To do this and to study its feasibility, the exerted forces from installing horizontal tidal current turbines were compared with the forces applied to the bridge structure during designing process (given in the Standards). Then, the allowable ranges of the overloading which is tolerable by the piers of the bridge were obtained. Accordingly, it is resulted that for installing these turbines, the piers of the existing bridges are required to be strengthened. Because of increasing usage of renewable powers and as a suggestion, the exerted forces from installing turbine for loading coefficients of different Standards are given. Finally as an example, preliminary designing of a horizontal tidal current turbine was carried out for Gesham Channel and the forces exerted from turbine to the bridge's pier were calculated for the future usage in order to create a test site of real dimensions.