2 resultados para Data Interviews
em Aquatic Commons
Resumo:
After several years of surveys on the Kainji Lake fisheries activities by the Nigerian German Kainji Lake Fish promotion Project (KLFPP) trends regarding catches, yield and other parameter begin to emerge. However, it became obvious that some of the data were not quite as accurate as they were believed to be. Looking at the different editions of the statistical bulletin of Kainji Lake, concerning one given fisheries parameter, sometimes it is possible to reveal inconsistencies and unexplained trends. As compared to the survey method, PRA is primarily for analysis of differences in local phenomenon and processes. Therefore, PRA was used as a complementary tool to enhance the knowledge on issues like fisher women, entrepreneurs, gear ownership structure, mode of operation by owners of large gear number, preference in the use of twine and nylon gill nets, and reasons for misinformation on the number of fishing equipment owned by entrepreneurs, which cannot be done with frame survey. PRA techniques like timeline, mapping, seasonal calendar, transect walk and key informant interviews were utilized in the study process
Resumo:
A baseline survey for the project which had been conducted in 2009 had gaps that could not allow assessment of project performance in the outcome and impact indicators to be made. This study was, therefore, commissioned to reconstruct the baseline data, aligned to the impact and outcome indicators on the project logframe and results framework, against which project achievements could be assessed. The purpose and scope of the study was to reconstruct the baseline data and analysis describing the situation prior to QAFM Project inception, taking 2008 as the baseline year, which was aligned to the project logframe outcome and impact indicators; to collect data on current status to compare project outcome (and where possible impact) in improved fish handling sites in comparison with the baseline as well as with comparable non-improved fish landing sites as control group. The study was conducted through secondary data search from sources at NaFIRRI, DFR and ICEIDA. Field data collection was carried out using a sample survey covering 312 respondents including boat and gear owners, crew members, processors and traders at eight project and two control landing sites. Key Informant Interviews were conducted with DFOs and BMU leaders in the study districts and landing sites respectively.