2 resultados para Conventional methods
em Aquatic Commons
Resumo:
Available of carp breeders in their prim state of maturity is a major constraint in hypophysation. Experiments conducted in a fish farm at Naihati, West Bengal, for two consecutive years, 1983-84 and 1984-85, clearly prove that by manipulation of environmental parameters such as metabolites, dissolved oxygen, running water conditions, as also of stock densities and quality and quantity of feed. Catla catla, Hypophythalmichthys molitrix, Labeo rohita, Cirrhina mrigala and Ctenopharyngodon idella can be made to attain better maturity and spawning stage much earlier than normal i.e. even in summer months and the entire stock spawned during the period from March to September. Percentage of successful breeding, quantities of eggs released and fertilised in relation to the body weight of all the species, were also found to be more in comparison to the brood stock raised through the conventional methods.
Resumo:
Offshore structures with numerous applications in different environments throughout the world and used at different depths. Due to the expansion of marine industries, including offshore oil industry in Iran , particularly in the Persian Gulf region, in order to more accurately model these structures and to prevent incidents such as the Overturning of the platform serious damage to the South Pars Phase ١٣ was platforms, the use New Technic is essential technologies. One of the methods that are used in the construction of offshore wind turbines, using a pre-pile. In this method, a template is constructed with the dimensions specified in the workshop. After making templates using special vessels for placement in the desired location on the sea bed is carried, then the template is placed on the sea bed, Then, using a hammer for Pile Driving Operation Started Vibration hammer and fit the template of 3 or 4 piles of crushed within this template on the seabed . The next step piling, templates have been removed from the site And Jacket placed on piles. The system was installed on the deck on piles and Consequently Deck Load pile inserted on .It should be noted that the design of these types of platforms, base diameter of the pile diameter independent of the choice as one of the major advantages of this system is. This thesis examines a Template Fixed Platform in the oil Soroush Using the Pre-Piling and the Common Piling systems in the Persian Gulf were studied and the effect of different design compared to the Pre-Piling Platforms Persian Gulf were evaluated. The results suggest that Pre-Piling system compared with conventional systems piling in the Persian Gulf, as a more appropriate model structure and behavior Top Model economic efficiency is selected. It should be noted that all calculations and analyzes were performed using Software Abaqus.