This report documents abundance and cover for selected elements of the benthic coral reef assemblage at the site of the 1984 grounding of the M/V Wellwood on Molasses Reef, Florida Keys. The purpose of the effort was to establish a pre-construction baseline before the installation of reef modules at the site. The installation process is intended to stabilize fractured substrates that were recently exposed by storm impacts, and to provide three-dimensional relief in order to enhance reef community recovery. It is hoped that the restoration effort will result in a biological assemblage with the character of the transition community that would exist there had the incident not occurred. To date, the assemblage has developed the character of a comparatively featureless hard ground similar in composition to hard ground areas and transition zones surrounding the grounding site. These data will allow scientists and resource managers to better track the trajectory of recovery following the installation of modules. Direct counts of scleractinian and gorgonian corals, hydrocorals of the genus Millepora, and zoanthids of the genus Palythoa were made in three areas within and around the grounding site. The site is poorly developed with respect to scleractinian colony size and cover compared to surrounding areas. Key scleractinian species necessary for the development of topographic relief in the area denuded by the grounding are not well represented in the current community. Though gorgonian cover and richness is similar in all study areas, gorgonian community recovery in the damaged area is not complete. Unlike surrounding areas, one species, Pseudopterogorgia americana, accounts for over half of all corals at the grounding site, over 80% of all gorgonians, and nearly all the coral cover. Based on these findings and other observations made in the 18 years since the grounding, recommendations are made that should be considered in the course of human intervention targeted at stabilizing and enhancing the site. (PDF contains 24 pages.)

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Following the commencement of construction works of a 250 MW hydropower plant at Dumbbell Island in the Upper Victoria Nile in September 2007, BEL requested NaFIRRI to conduct continuous monitoring of fish catches at two transects i.e. the immediate upstream transect of the project site (Kalange-Makwanzi) and the immediate downstream .transect (Buyala-Kikubamutwe). The routine monitoring surveys were designed to be conducted twice a week at each of the tWo transects. It was anticipated that major immediate impacts were to occur during construction, and these needed to be known by BEL as part of a mitigation strategy. For example, the construction of it cofferdam could be accompanied by rapid changes in water quality and quantity downstream of the construction. These changes in turn could affect the fish catch and would probably be missed by the quarterly monitoring already in place. Therefore, a major cbjective of the more regular and rapid monitoring was to discern immediate impacts of construction activities by focusing on selected water quality parameters (total suspended solids, water conductivity, temperature, dissolved oxygen and pH) and fish catch characteristics (total catch, catch rates and value of the catch)

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The specific objectives were to: WATER QUALITY 1. To measure the water physical variables as indicators of environmental conditions in the upstream and downstream transects of Kalange (1) and Buyala (2), respectively, 2. To determine the concentrations of total suspended solids as a major constituent likely to be released into the waters at any time during the construction activities, by comparing the concentrations at the two transects. FISH CATCH 1. To follow up trends in fish catch as construction activity progresses, and to precision of the estimate; 2. To estimate the prevailing fish catch rates, total fish catches and the total value of the fish catch to the local fishers at the two transects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Soft engineering solutions are the current standard for addressing coastal erosion in the US. In South Carolina, beach nourishment from offshore sand deposits and navigation channels has mostly replaced construction of seawalls and groins, which were common occurrences in earlier decades. Soft engineering solutions typically provide a more natural product than hard solutions, and also eliminate negative impacts to adjacent areas which are often associated with hard solutions. A soft engineering solution which may be underutilized in certain areas is shoal manipulation. (PDF contains 4 pages)