4 resultados para COE
em Aquatic Commons
Resumo:
This report offers guidelines for the provision of adequate port reception facilities for vessel-generated garbage under the requirements of Annex V of the International Convention for the Prevention of Pollution From Ships, 1973 (MARPOL 73/78), Regulations for the Prevention of Pollution by Garbage from Ships. MARPOL Annex V prohibits at-sea disposal of plastic materials from vessels, and specifies the distance from shore at which other materials may be dumped. Annex V also requires the provision of port reception facilities for garbage, but it does not specify these facilities or how they are to be provided. Since the at-sea dumping restrictions apply to all vessels, the reception facility requirement applies to all ports, terminals, and marinas that serve vessels. These guidelines were prepared to assist port owners and operators in meeting their obligation to provide adequate reception facilities for garbage. The report synthesizes available information and draws upon experience from the first years ofimplementation of MARPOL Annex V. (PDF file contains 55 pages.)
Resumo:
More than a decade has passed since the passage of the Marine Mammal Protection Act of 1972. During that time the U.S. tuna purse seine neet reduced its incidental porpoise mortality rate more than 10-fold. This was made possible through the development of gear and techniques aimed at reducing the frequency of many low probability events that contribute to the kill. Porpoise are killed by becoming entangled or entrapped in folds and canopies of the net and suffocating. The configuration of the net, both before and during the backdown release procedure, is a major determinant of the number of porpoise killed. Speedboats can be used to tow on the corkllne to prevent net collapse and also to adjust the net configuration to reduce net canopies prior to backdown. Deepening a net can reduce the probability of porpoise being killed by prebackdown net collapse. The effects of environmental conditions and mechanical failures on net configuration can result in high porpoise mortality unless mitigated by skilled vessel maneuvers or prevented by the timely use of speedboats to adjust the net. The backdown procedure is the only means to effectively release captured porpoise from a purse seine. It is also the time during the set when most of the mortality occurs. The use of small mesh safety panels and aprons in the backdown areas of nets reduces porpoise entanglement, and Increases the probability of an effective release. The tie-down points on the net for preparing the backdown channel must be properly located in order to optimize porpoise release. A formula uses the stretched depth of the net to calculate one of these points, making it a simple matter to locate the other. Understanding the dynamics of the backdown procedure permits a thorough troubleshooting of performance, thus preventing the repetition of poorly executed backdowns and thereby reducing mortality. Porpoise that cannot be released must be rescued by hand. A rescuer in a rigidly inflated raft can rescue porpoise effectively at any time during a net set. Hand rescue can make the difference between above average kill and zero kill sets. In all circumstances, the skill and motivation of the captain and his crew are the final determinants in the prevention of incidental porpoise mortality in tuna seining. (PDF file contains 22 pages.)
Resumo:
Dataq uantifying the area of habitat affected by Federal programs that regulate development in coastal zones of the southeastern United States are provided for 1988. The National Marine Fisheries Service (NMFS) made recommendations on 3,935 proposals requiring Federal permits or licenses to alter wetlands. A survey of 977 of these activities revealed that 359,876 acres of wetlands that support fishery resources under NMFS purview were proposed for some type of alteration or manipulation. Almost 95 percent of this acreage was for impounding andl/or manipulation of water levels in Louisiana marshes. The NMFS did not object to alteration of 173,284 acres and recommended the conservation of 186,592 acres. To offset habitat losses, 1,827 acres of mitigation were recommended by the NMFS or proposed by applicants and/or the Corps of Engineers (COE). From 1981 to 1988 the NMFS has provided in depth analyses on 8,385 projects proposing the alteration of at least 656,377 acres of wetlands. A follow-up survey on the disposition of 339 permits handled by the COE during 1988 revealed that the COE accepted NMFS recommendations on 68 percent. On a permit-by-permit basis, 13 percent of NMFS recommendations were partially accepted, 17 percent were completely rejected, and 2 percent were withdrawn. The permit requests tracked by the NMFS proposed the alteration of 2,674 acres of wetlands. The COE issued permits to alter 847 acres or 32 percent of the amount proposed.