81 resultados para 11-106


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objectives of the workshop were to review and update Marine Protected Area (MPA) data, finalise policy briefs for each country and recommend future actions and policies for sustainable management of MPAs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Participants were exposed to concepts and information about EAFM using a structured, participatory method of delivery. The learning strategy involved specifically designed exercises, using real examples, to consolidate learning. Daily monitoring and reviews were conducted together with pre-and post-course assessment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Socio-economic Monitoring (SocMon) is an approach and set of tools for conducting socio-economic monitoring of changes in coastal communities. Planned outputs of the workshop included: training of local staff i SocMon methodologies; draft a SocMon report for St. Martin's Island; a workplan for implementing the SocMon; a communication strategy; and key inputs to a regional SocMon strategy

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This Socioeconomic Monitoring (SocMon) training workshop was coordinated by the Small Fisher Federation of Lanka (SFFL). Planned outputs included: participants from Mannar trained in SocMon methodologies; draft SocMon reports fro Vidathaltivu; a workplan for Mannar; a communication strategy for Vidathaltivu/ Mannar; and key inputs to a regional SocMon strategy

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report was based on fieldwork conducted by trainees at the Socio-economic Monitoring (SocMon) workshop held at Vidathaltivu, Mannar Region. Topics included: community infrastructure; coastal and marine activities; and governance of marine and coastal areas

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This monitoring survey No. 11 undertaken between 4th and 9th September 2012 is the second one to be conducted after completion of construction of Bujagali Hydropower Dam. Two pre-construction baseline surveys in April 2000 and April 2006 were conducted and during construction phase, eight monitoring surveys (September 2007, April 2008, April 2009, October 2009, April 2010, September 2010, April 2011, September 2011) were conducted.