55 resultados para Water-supply engineering.


Relevância:

80.00% 80.00%

Publicador:

Resumo:

This is the report from the Regional Fisheries Advisory Committee meeting, which was held on the 4th March, 1985. The report contains sections on Public Water Supplies in West Cumbria, proposals for water supply for British Nuclear Fuels Limited (BNFL), and the proposals for a fish pass at Ennerdale Weir. The section on BNFL looks at the proposal of British Nuclear Fuels Limited to take more water from Wastwater. This section includes information about Wastwater, Calder Valley Boreholes, Mine Water and the River Ehen, and other groundwater investigations. The Fisheries Advisory Committee was part of the Regional Water Authorities, in this case the North West Water Authority. This preceded the Environment Agency which came into existence in 1996.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This is the Wetland resource evaluation and the NRA's role in its conservation: Classification of British wetlands report produced by the National Rivers Authority in 1995. This R&D document provides a clear classification for wetlands in England and Wales. The classification incorporates many of the existing ideas on the subject but avoids some of the problems associated with other classifications. A two-layered 'hydrotopographical' classification is proposed. The first layer identifies situation-types, i.e. the position the wetland occupies in the landscape, with special emphasis upon the principal sources of water. The second layer identifies hydrotopographical elements, i.e. units with distinctive water supply and, sometimes, distinctive topography in response to this. This system is seen as an independent, basic, classification upon which it is possible to superimpose additional, independent classifications based on other features (e.g. base-status, fertility, vegetation, management etc.). Some proposals for such additional classifications are provided.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This is the River Fowey Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Fowey catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Fowey salmon stock. The actions presented within this final Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. The main objective of the Fowey SAP therefore, is to maintain, improve and develop the Fowey salmon stocks to a sustainable level that, on the basis of historic catch records, the catchment can clearly support. Although the Fowey is passing its conservation limit, the consultees felt very strongly that there were two major factors limiting the salmon stock of the River Fowey- the overgrazing of Bodmin Moor and the use of the catchment for water supply by South West Water.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This is the River Plym Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Plym Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Plym SAP follows the format of those completed for the rivers Tamar, Lynher, Tavy, Camel and Fowey. It is the sixth of seven action plans that will be produced for salmon rivers managed by Cornwall Area. The River Plym SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. Notably, there are historic workings for china clay and a significant potable water supply at Burrator Reservoir. The main River Plym has been designated as River Ecosystem class 1 for its water quality objectives. This is the highest water quality target set for rivers. This standard has been met in all reaches of the main River Plym and River Meavy.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

EXTRACT (SEE PDF FOR FULL ABSTRACT): The early-Holocene warm period, ca. 9000 years ago, is a realistic analog for the possible effects of greenhouse warming. At that time the vegetation of the western Sierra Nevada resembled that currently found east of the crest. ... Tourism, water supply, and the logging industry will be negatively effected if climate changes during the next century are in the direction and magnitude of those of the early Holocene. Increased precipitation in the eastern Sierra could offset some of the effects.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Snowpack is an important source of water supply in the western United States. This study examines the seasonal variability of an extensive history of snow observations over the western United States and Canada. It links variations in snowpack to variations in atmospheric circulation, surface temperature, and precipitation.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

For the 6-year period 1987 through 1992, most of California suffered the worst or near-worst drought in a recorded history of about 140 years. Based on tree ring reconstructions, it may have been the worst in more than 400 years. The purpose of this paper is to review briefly the recent drought, then talk about the water supply situation this year, with some discussion of why the California drought is over hydrologically for most people; but for some, water supply problems continue.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Nine different categories of stakeholders in shrimp farming industry ·were assessed to show the socioeconomic impact of shrimp farming in south-west Bangladesh. Among all the stakeholders the shrimp farmer's average own land was 4 ha whereas the seed collectors and faria's had lowest amount of average land, 0.1 and 0.5 ha respectively. The shrimp farming positively impacted to the livelihood of stakeholders. Income of the coastal people, sanitation, working facilities of women, employment, health condition and the literacy rate increased due to shrimp farming. On the other hand shrimp farming had negative impact on the rice production, livestock, drinking water supply, and social conflict and violence had increased due to shrimp farming. There were internal conflicts between different stakeholders; the farias conflict with the depot owners and shrimp farmers, marginal farmers' conflict with the rich shrimp farmers about leasing lands and saline water control, the rice farmers conflicts with the shrimp farmers about agricultural crop production.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Live clams collected from their natural beds were depurated by starving them in water. Water from their natural environment, potable water from municipal water supply and sodium chloride solution made up to the strength of natural brackish water as well as all these chlorinated at 5 p.p.m. level were used. The acid insoluble ash could be brought down to insignificant level by depuration in natural water for a period of 16-18 h. Bacterial quality of the meat also could be improved by this method. Chlorination of the system at the end of depuration further improves the bacterial quality of the meat.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Human use of water resow-ces in Uganda has grown and intensified along with population growth and increasing demand to meet the diverse human needs. In the case of Uganda's rivers, the main uses include fisheries, hydropower generation, abstraction for potable water supply, discharge of sewage and navigation. All these uses can disrupt the integrity of the aquatic ecosystem and may affect the survival of the diversity of organisms. In consideration of the need to increase electricity to meet demand, the Bujagali Hydro-power Project (BHPP) and the National Environment Management Authority (NEMA) recognised the importance of safeguards to mitigate impacts of the project. The National Fisheries Resources Research Institute (NaFIRRI) was assigned the role of providing baseline information on the aquatic ecosystem of the Upper Victoria Nile and to follow up the findings with a monitoring framework during construction and post-commissioning phases.