60 resultados para 8-69A
Resumo:
The result reported were from a monitoring survey no.8 undertaken between 6th and 10th April 2011 during construction period of the Bujagali Hydropwer Project (BHPP). Two pre-construction, baseline surveys in April 2000 and April 2006 were conducted and so far,durin construction phase of the project, seven monitoring surveys have been undertaken i.e. in September 2007, April 2008, April 2009,October 2009, April 2010, September 2010 and the present one, in April 2011. Since 2009 biannual monitoring surveys have been conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: Water quality determinants Biology and ecology of fishes and food webs Fish stock and fish catch including economic aspects of catch and Sanitation/vector studies (bilharzias and river blindness)
Resumo:
The workshop's objective was to provide information to improve a regional Ecopath with Ecoism (EwE) model.The workshop described the basis and principles underlying the software, encompassing the basics of Ecopath to Ecospace, economics and management strategy evaluation.