95 resultados para 1950-2000
Resumo:
This work reflects the activities of line and trap fishing in Southern Mozambique in 2000. The catch in line fishing has been estimated at 441 mt, according to the DNAP records. The same sources indicated that 1767 days were spent at sea and the estimated catch rate was 250 Kg per boaticlay. Most of the line fishing effort shifted away from Maputo and moved to Inhambane region. The monthly analysis of fishing vessels, stricter controls over catch and effort data submission, development of long-term research programme and the continuation of the on board sampling to improve the data collection are the recommendation for line fishing. The catch of trap vessels increases from 30mt in 1997 to 172 mt in 2000, during which the total number of traps increased from 25 to 300. During this time the number of fishing days has remained relatively constant, as well the soak time. These data sets are thus not compatible with each other, reflecting an increase in daily catch from 243 Kg to 791 kg. The species composition is mainly dominated by P. coeruleopunctatus, C. puniceus, C. nufar and E. andersoni.
Resumo:
This work refers to the same biological aspects of Chrysoblephus puniceus (marreco), Polysteganus coeruleopunctatus (cachucho) and Cheimerus nufar (robalo). It shows the progress in the biological study of the three species, pointing out at the same time the few discrepancies, which still need to be resolved.
Resumo:
The dependence of Mozambique on its marine resources is highly significant. There is a need for a plan of action for sustainable use of these important resources, for the benefit of the nation. In this document, some aspects are included, that can be important to take into consideration for a sound action plan for the lin fishery of Mozambique.
Resumo:
In February 1996 A Strategy for the Management of Salmon in England and Wales was launched by the National Rivers Authority. The strategy concentrates on four main objectives for the management of salmon fisheries in England and Wales: (i) Optimise the number of salmon returning to home water fisheries, (ii) Maintain and improve the fitness and diversity of salmon stocks, (iii) Optimise the total economic value of surplus stocks, (iv) Ensure necessary costs are met by beneficiaries. These four objectives will be addressed through local Salmon Action Plans (SAPs) which will be produced for each of the principle salmon rivers in England and Wales by the year 2001. A consultation report was produced for the River Ribble and released publicly in October 1999. This document determined an egg deposition figure of 8.5 million eggs for the Ribble, that would allow maximum gain from the net and rod fisheries; raised a number of issues which are thought to currently limit salmon production; identified actions which may be undertaken by the Environment Agency and other bodies to improve stocks. This action plan re-addresses the issues raised in the consultation document, taking into account the comments received, and also identifies areas of possible improvement in data gathering that would allow more accurate estimation of the spawning target and compliance in future years. The progress of this plan will be monitored and reported annually.
Resumo:
In February 1996 A Strategy for the Management of Salmon in England and Wales was launched by the National Rivers Authority. The strategy concentrates on four main objectives for the management of salmon fisheries in England and Wales: (i) Optimise the number of salmon returning to home water fisheries, (ii) Maintain and improve the fitness and diversity of salmon stocks, (iii) Optimise the total economic value of surplus stocks, (iv) Ensure necessary costs are met by beneficiaries. These four objectives will be addressed through local Salmon Action Plans (SAPs) which will be produced for each of the principle salmon rivers in England and Wales by the year 2001. This Salmon Action Plan for the River Ribble reviews the status of the stock and the fisheries, seeks to identify the main factors limiting performance, to draw up and cost a list of options to address these, and to consult with local interest groups.
Resumo:
This document is a collection of legislative documents relating to fisheries, especially Statutory Instruments, with special regards to the county Cumbria in the north of England. This includes Orders on salmon and trout spanning the years 1950-1993.
Resumo:
This fisheries report summarises developments of the year 2000 in the North West Region of the Environment Agency. The North West region covers around 14,000 square km, from Cheshire in the south to its northern border with Scotland. The report provides statistics on fisheries finance, including salmon and sea trout catches, including rod and line and net catches, and special projects, including fish stock assessments, radiotracking, and various surveys. The appendix includes a summary of fish statistics for 2000.
Resumo:
This is the Gunnislake Fish Counter, Annual Report 2000 produced by the Environment Agency South West Region on March 2001. The report presents the daily upstream counts of migratory salmonids recorded on the River Tamar at Gunnislake Weir fish counting station (SX 435 713) situated in 2000. Data contained within this report covers the period of the commercial migratory salmonid net buy-back scheme and the National Spring Salmon Byelaws. The fish counter at Gunnislake is a resistivity based system (Logie 2100A – Aquantic limited) and is installed in the fish pass on the Cornish bank of the River Tamar at the head of the tide. The minimum salmon count for 2000 was 2654. The 2000 upstream count for sea trout was 6417. The run pattern observed for salmon and sea trout in 2000 was generally consistent with that of previous years.
Resumo:
This is the Stillwaters monitoring programme summary results 2000 from the Environment Agency. In May 1997, a Stillwaters meeting was held to discuss the way forward in stillwaters monitoring. It decided upon the establishment of a three year rolling programme, in which three stillwaters would be monitored three times a year, every third year. During 2000, stillwaters monitored for the fourth year of the Stillwaters Monitoring Programme were Hatch Mere, Marbury Big Mere, Comber Mere, Tabley Mere, Tatton Mere and Melchett Mere. Algal, zooplankton and water chemical samples were taken on all meres. Surveys of Tabley Mere and Comber Mere continued on from last year when water quality concerns were highlighted. Continuous monitoring in Oak Mere, including water level data continued in 2000. Fish surveys were carried out in Tatton Mere and Comber Mere. Tabley Mere survey was abandoned due to the awkward bathymetry of the mere. No invertebrate samples were taken in 2000 due to lack of resources.
Resumo:
This is the Oak Mere continuous monitoring summary report, 1997 to 2000 from the Environment Agency North West. This report focuses on the continuous monitoring programme made by a multi -parameter probe in Oak Mere since summer 1997. From 1999 nutrient and chlorophyll samples were taken when the water quality instrument was serviced. Water level measurements were made since 1998. Moreover, the report shows a summary Oak mere water quality of each year (1997-2000). The physico-chemical parameters and nutrient levels included are: temperature, specific conditions, dissolved oxygen, pH, Depth, secchi disc measurements, chlorophyll a, total Phosphorus, orto-Phosphate, Nitrate, Ammonia, and Silicate.
Resumo:
This is the River Gowy and Thornton Brook improvements: Environmental Action Plan report produced by the Environment Agency in 2000. This Environmental Action Plan relates to the proposals by the Environment Agency to improve the flood defences of land adjacent to the River Gowy, about 3 km east of Ellesmere Port, Cheshire. The purpose of the Environmental Action Plan (EAP) is to provide details of how the issues addressed in the Environmental Statement (ES) will be carried through to the completion of the project. The EAP represents a commitment to the environmental recommendations formulated during the environmental assessment process and should be closely adhered to during the design, construction and post project monitoring o f the works. For any matters that cannot be finalised until during construction the constraints will be detailed in the plan so they are implemented in the contracts.
Resumo:
Two fishermen and a boy transfering pike with a cylindrical keep net to Lancaster Canal, North West England, UK. This photo is part of a Photo Album that includes pictures from 1935 to 1954.
Resumo:
A fisherman with a hen pike caught on the 7.3.1950 at Baines Pool, North West of England, UK. This photo is part of a photo album that includes pictures from 1935 to 1954.
Resumo:
Two fishermen transfering pike using metal containers to the Lancaster Canal, North West of England, UK. This photo is part of a Photo Album that includes pictures from 1935 to 1954.
Resumo:
Photo of a hatching cage in Tower Mill, an unidentified location in the North West of England, UK. The image was taken in 1950. This photo is part of a Photo Album that includes pictures from 1935 to 1954.