39 resultados para Khatibi, Abdelkebir, 1938-2009


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Contiene los trabajos presentados, el programa científico y el perfil de instituciones marinas cubanas. Contains abstracts of the papers presented, the scientific program and the profile of Cuban marine institutions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The survey covered by this report was undertaken between 6 th and 9th October 2009 as a follow-up on the during construction surveys of the Bujagali Hydropwer Project (BHPP). In addition to two pre-construction baseline surveys in April 2000 and April 2006, four monitoring surveys have so far been undertaken i.e. in September 2007, April 2008, April 2009 and the present one, in October 2009. The 2009 biannual monitoring surveys were conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: 1. water quality determinants 2. biology and ecology of fishes and food webs 3. fish stock and fish catch including economic aspects of catch and 4. sanitation/vector studies (bilharzias and river blindness)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The primary objective in doing this work was to become acquainted with as many forms as possible of the marine fauna of the intertidal zone and if possible to determine some of the environmental relationships which exist in as many different types of habitats as possible. Due to limited amount of time spent in this study no very intensive work could be done and only a general survey was made of the more conspicuous forms of life which were encountered. Most of the work consisted of collecting and observing animals in the tide pools during periods of low tides. The animals collected were then taken to the laboratory and observed and determined as to species. Notes were taken as to place, time, and situation under which the animals were found. As many different types of habitats as possible were visited which included rocky intertidal areas of Mussel Point, Point Pinos, Lighthouse Point, Pescadero Point and Carmel Point just east of Carmel Beach. Sandy beaches were visited at Monterey Beach, Carmel Beach and Asilomar Beach. A marine estuary habitat was visited at Elkhorn Slough. More than two hundred species were identified and observed during this six-week period. A rather hasty population study was made of the eelgrass, Phyllospadix, of the intertidal zone at Mussel Point and of an algae, Gigartina caniculata, which grows at the level just above the eelgrass.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The survey covered by this report was undertaken between 3rd and 7th April 2009 as a follow-up on the during construction surveys. Two pre-construction baseline surveys were undertaken in April 2000 and April 2006. During the construction phase which started in 2007, three surveys including the current one have been undertaken i.e. in September 2007, April 2008 and the present one, in April 2009. Unlike in all previous surveys in which monitoring was conducted at one transect upstream and three downstream transects, in the current survey, two transects, one upstream and the other,downstream of the BHPP were sampled with emphasis on the following aspects: 1. water quality determinants 2. biology and ecology of fishes and food webs 3. fish stock and fish catch including economic aspects of catch and 4. sanitation/vector studies (bilharzias and river blindness)