36 resultados para Gripe A(H1N1) 2009
Resumo:
The survey covered by this report was undertaken between 6 th and 9th October 2009 as a follow-up on the during construction surveys of the Bujagali Hydropwer Project (BHPP). In addition to two pre-construction baseline surveys in April 2000 and April 2006, four monitoring surveys have so far been undertaken i.e. in September 2007, April 2008, April 2009 and the present one, in October 2009. The 2009 biannual monitoring surveys were conducted at an upstream and a downstream transect of the BHPP with emphasis on the following aspects: 1. water quality determinants 2. biology and ecology of fishes and food webs 3. fish stock and fish catch including economic aspects of catch and 4. sanitation/vector studies (bilharzias and river blindness)
Resumo:
The survey covered by this report was undertaken between 3rd and 7th April 2009 as a follow-up on the during construction surveys. Two pre-construction baseline surveys were undertaken in April 2000 and April 2006. During the construction phase which started in 2007, three surveys including the current one have been undertaken i.e. in September 2007, April 2008 and the present one, in April 2009. Unlike in all previous surveys in which monitoring was conducted at one transect upstream and three downstream transects, in the current survey, two transects, one upstream and the other,downstream of the BHPP were sampled with emphasis on the following aspects: 1. water quality determinants 2. biology and ecology of fishes and food webs 3. fish stock and fish catch including economic aspects of catch and 4. sanitation/vector studies (bilharzias and river blindness)