390 resultados para Rivers.


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the Brown trout habitat assessment on the River Bela catchment produced by the Environment Agency North West in 1997. The Environment Agency (EA) and its predecessor the National Rivers Authority undertook strategic fish stock assessments in 1992 and 1995 on the River Bela catchment. These surveys found low numbers of brown trout {Salmo trutta) at some sites. Following this, habitat evaluation assessments were undertaken on the eleven poorest sites Factors probably responsible for declining trout populations on the three main tributaries of the Bela catchment include: Overgrazing by farm stock; Lack of suitable cover for parr; the absence of suitable spawning areas; existing potential of certain areas within the catchment not being utilised, due to poor dispersal. Habitat Improvement Schemes (H.I.S) are discussed and prioritised.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the Kent estuary survey 8th July 1980 produced by the North West Water Authority in 1980. This survey was carried out on the Kent Estuary on the 8th July, 1980 during the period 3h hours before to 1.5 hours after low water. The chemical water quality in the vicinity of Arnside was found, in general, to be good. The E. coli counts were found to be at or below the E E C mandatory value for bathing waters. Downstream of the Arnside outfall the E coli counts were generally above the E E C mandatory value, the counts getting higher at and after low water. B O D values also increased at low water though ammonia and phosphate (except for 1 sample) concentrations were low. The total coliform counts both at Arnside and below the outfall were always above the E E C mandatory level (except for 2 samples).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the Kent estuary 1992 surveys: Summary of results produced by the National Rivers Authority in 1993. The report summarises routine and baseline water quality surveys carried out on the Kent estuary during 1992. Baseline surveys are designed to respond to regional, national, and European requirements. During 1992 baseline surveys were carried out in June and December. Unfortunately, in June, samples could only be taken from stations 3, 7 and 8. For ease of interpretation the results have been presented in graph form, including the maximum and minimum parameter concentration and the appropriate Environmental Quality Standards (EQS). The parameters measured in this survey were physical parameters (temperature, BOD, dissolved oxygen, Ph, salinity, conductivity); nutrients (ammonia, phosphate, and nitrate); metals (Mercury, Nickel, Arsenic, Cadmium, Chromium, Cooper, Boron, and Zinc) and organic compounds.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the Report on fisheries invertebrate survey of the Groove Beck, Thornsgill Beck and Troutbeck system produced by the Environment Agency North West in 1997. In 1996 the National Rivers Authority (NRA) report on the 1992 strategic stock assessment for the Upper Derwent catchment Jane Atkins recommended that should subsequent electrofishing show continued low densities, a survey of the invertebrate fauna should be undertaken to assess the food availability for salmonids, in order that lack of food could be ruled out as a contributory factor in their poor breeding success. Additionally the survey looked at the substrate to try to determine whether the bed type might actually be unsuitable for spawning, especially in view of the previously mentioned silt inputs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the River Camel Salmon Action Plan produced by the Environment Agency in 2002. The report focuses on the River Camel Salmon Action Plan (SAP). The River Camel SAP follows the format of those completed for the Rivers Tamar, Lynher and Tavy. It is the 4th of 7 action plans that will be produced for salmon rivers managed by the Cornwall Area Fisheries, Recreation and Biodiversity Team. This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. In addition, for the first time, Salmon Action Plans have attempted to evaluate in economic terms, all of the contributory components of the salmon fishery. The River Camel Salmon Action Plan contains a description of the river catchment and highlights particular features that are relevant to the salmon population and associated fishery.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the River Fowey Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Fowey Salmon Action Plan (SAP). The River Fowey SAP follows the format of those completed for the Rivers Tamar, Lynher, Tavy and Camel. It is the 5th of 7 action plans that will be produced for salmon rivers managed by the Cornwall Area Fisheries, Recreation and Biodiversity Team. This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Fowey SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. Notably, there are historic workings for copper and china clay and two significant potable supply reservoirs (Siblyback and Colliford) which have been constructed within the catchment during the past 35 years. The whole of the Fowey catchment is set at the highest water quality grading of RE1 and this standard is met in all reaches of the River Fowey and its tributaries.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the River Lynher Salmon Action Plan Consultation document produced by the Environment Agency in 1998. The report pays attention on the external consultation of the River Lynher Salmon Action Plan (SAP). The River Lynher SAP follows that for the River Tamar and is the second of seven action plans that will be produced for salmon rivers managed by the Cornwall area fisheries department. This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Lynher SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The analysis of recent and historical catches of salmon on the River Lynher from both the rod and net fisheries indicated the fishery's reliance upon post 1 June salmon. Historically, annual salmon catches (both rod and net) on the River Lynher have been found to consist of a much higher proportion of pre 1 June (spring) salmon. Evidence is provided that illustrates the extent of the decline within this stock component since the early 1980s.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the River Plym Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Plym Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Plym SAP follows the format of those completed for the rivers Tamar, Lynher, Tavy, Camel and Fowey. It is the sixth of seven action plans that will be produced for salmon rivers managed by Cornwall Area. The River Plym SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. Notably, there are historic workings for china clay and a significant potable water supply at Burrator Reservoir. The main River Plym has been designated as River Ecosystem class 1 for its water quality objectives. This is the highest water quality target set for rivers. This standard has been met in all reaches of the main River Plym and River Meavy.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the River Tamar Salmon Action Plan Consultation document produced by the Environment Agency in 1998. The report pays attention on the external consultation of the River Tamar Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Tamar was one of the premier salmon rivers in the West Country, supporting fifteen licensed estuary nets, and the second highest rod catch behind the River Exe. The River Tamar SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the River Tavy Salmon Action Plan Consultation document produced by the Environment Agency in 1999. The report pays attention on the external consultation of the River Tavy Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. In addition, salmon action plans have for the first time, attempted to evaluate in economic terms, all of the contributory components of the salmon fishery. The River Tavy Salmon Action Plan follows that for the River Tamar and River Lynher and is the third of seven action plans that will be produced for salmon rivers managed by the Cornwall Area FER department. The River Tavy SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the River Yealm Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Yealm Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Yealm Salmon Action Plan follows the format of those completed for the rivers Tamar, Lynher, Tavy, Camel, Fowey and Plym. It is the final one of seven action plans that will be produced for salmon rivers managed by Cornwall Area. The River Yealm SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. Notably there are potable water abstractions in the headwaters, workings for china clay on the main tributary, two inert waste landfill sites and an aggregate quarry adjacent to the main river and inputs from several Sewage Treatment Works (STW) and two industrial estates. The main River Yealm has been designated as River Ecosystem Class 1 for its water quality objectives. This is the highest water quality target set for rivers.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the River Axe Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Axe Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. This document is part of a national initiative to produce action plans for the management of all the main salmon rivers of England and Wales by 2003. The aim of this plan is (i) to assess the status of the salmon stocks and fisheries of the River Axe - including the use of Conservation Limits as part of this process, (ii) to identify factors which may be limiting stock and fishery performance and (iii) to propose remedial measures address these factors. The salmon stock of the River Axe was apparently in a healthy state in the 1950s, supporting net and rod fisheries with average annual catches of around 100 and 50 fish respectively. Catches declined through the 1970s and 1980s to the extent where no salmon were recorded in the late 1980s and early 1990s. This decline was probably due largely to the effects of agricultural pollution, which virtually extinguished the salmon stock of the River Axe. Water quality has subsequently improved, but has deteriorated again in recent years.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the River Exe Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Exe Salmon Action Plan (SAP). This strategy represents an entirely new approach to salmon management within the UK and introduces the concept of river-specific salmon spawning targets as a salmon management tool. The River Exe SAP follows the format of those completed for the Rivers Teign, Torridge, Taw and Dart. It is the fifth of eight action plans that will be produced for salmon rivers within Devon Area. The River Exe SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The Exe salmon stock is judged to be meeting its Conservation Limit. However, this assessment is uncertain as it is based on an estimate of rod exploitation rate, which in itself is also uncertain. At present there is no means of accurately assessing the River Exe salmon run. In common with many other rivers, estimation of stock using catch statistics and rod exploitation rate is the model used, when direct assessment is not possible. The installation of a fish counter on the lower river, or the use of other direct counting methods, would help to provide a direct assessment of the annual run of salmon into the river. This would improve our ability to estimate the spawning escapement and hence assess compliance with the Conservation Limit.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the River Lyn Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Lyn Salmon Action Plan (SAP). This approach to salmon management within the England and Wales introduces the concept of river-specific Conservation Limits as a method of assessing the status of the salmon stock. The River Lyn Salmon Action Plan follows the format of those completed for the Rivers Exe, Axe, Avon & Erme, Teign, Torridge, Taw and Dart. It is the last of eight action plans that have been produced for salmon rivers within Devon Area. The River Lyn Salmon Action Plan contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The Lyn salmon stock is judged to be meeting its Conservation Limit. However, this assessment is uncertain as it is based on an estimate of rod exploitation rate, which in itself is also uncertain.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is the River Teign Salmon Action Plan Consultation document produced by the Environment Agency in 2003. The report pays attention on the external consultation of the River Teign Salmon Action Plan (SAP). This approach to salmon management within the England and Wales introduces the concept of river-specific Conservation Limits as a method of assessing the status of the salmon stock. The River Teign Salmon Action Plan follows the format of those completed for the Rivers Torridge, Taw and Dart. It is the fourth of eight action plans that will be produced for salmon rivers within the Devon Area Fisheries, Recreation and Biodiversity Team. The River Teign SAP contains a description of the river catchment and highlights particular features that are relevant to the salmon population and the associated fishery. The Teign salmon stock is currently failing to meet its conservation limit. This failure is largely attributed to the reduction in the survival rate during the marine phase of the salmon life cycle. This is likely to constrain stocks to lower levels than have existed historically. Still further catch controls may contribute to a reduction in exploitation rates and allow stocks to recover to meet their conservation limit. Other important actions include the continuation of habitat improvement works which aim to maximise spawning habitat utilisation, spawning success, and juvenile survival and production.