65 resultados para Plan de negocio


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In February 1996 A Strategy for the Management of Salmon in England and Wales was launched by the National Rivers Authority. The strategy concentrates on four main objectives for the management of salmon fisheries in England and Wales: (i) Optimise the number of salmon returning to home water fisheries, (ii) Maintain and improve the fitness and diversity of salmon stocks, (iii) Optimise the total economic value of surplus stocks, (iv) Ensure necessary costs are met by beneficiaries. These four objectives will be addressed through local Salmon Action Plans (SAPs) which will be produced for each of the principle salmon rivers in England and Wales by the year 2001. A consultation report was produced for the River Ribble and released publicly in October 1999. This document determined an egg deposition figure of 8.5 million eggs for the Ribble, that would allow maximum gain from the net and rod fisheries; raised a number of issues which are thought to currently limit salmon production; identified actions which may be undertaken by the Environment Agency and other bodies to improve stocks. This action plan re-addresses the issues raised in the consultation document, taking into account the comments received, and also identifies areas of possible improvement in data gathering that would allow more accurate estimation of the spawning target and compliance in future years. The progress of this plan will be monitored and reported annually.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In February 1996 A Strategy for the Management of Salmon in England and Wales was launched by the National Rivers Authority. The strategy concentrates on four main objectives for the management of salmon fisheries in England and Wales: (i) Optimise the number of salmon returning to home water fisheries, (ii) Maintain and improve the fitness and diversity of salmon stocks, (iii) Optimise the total economic value of surplus stocks, (iv) Ensure necessary costs are met by beneficiaries. These four objectives will be addressed through local Salmon Action Plans (SAPs) which will be produced for each of the principle salmon rivers in England and Wales by the year 2001. This Salmon Action Plan for the River Ribble reviews the status of the stock and the fisheries, seeks to identify the main factors limiting performance, to draw up and cost a list of options to address these, and to consult with local interest groups.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The report presents the Environment Agency's 5 year Salmon Action Plan for the River Kent for the period from January 2001, providing the background to the plan, responses to the public consultation given, and proposed actions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 1996 a Strategy for the Management of Salmon in England and Wales was launched by the National Rivers Authority setting out objectives for the management of Salmon fisheries. These objectives are to be met through local Salmon Action Plans which are to be produced for each of the 68 principal salmon rivers in England and Wales by December 2003. A consultation document was produced for the river Wyre and released publicly during October 2003. This document: • Determined an egg deposition figure of 1.27 million eggs which would allow maximum gain from the fisheries • Raised a number of issues which are though to limit existing salmon production. • Identified actions which may be undertaken by the Environment Agency and other bodies to improved stocks. The document looks at the issues in the consultation document and also highlights some important changes to historic egg deposition rates following further analysis of the data. Some of the major issues addressed in the plan are: • Severe low flows on specific tributaries • Reduced juvenile production caused by insufficient habitat. • Changes in flow regime resulting in the wash out of gravels and redds. • The impact of man made structures preventing access to suitable spawning areas, and preventing the downstream distribution of spawning gravels.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In February 1996, the National Salmon Management Strategy was launched by the Environment Agency's predecessor the National Rivers Authority (NRA, 1996). The strategy concentrates on four main objectives for the management of salmon fisheries in England and Wales. These are primarily aimed at securing the well being of the stock, but in doing so will improve catches and the associated economic returns to the fisheries. The four main objectives are : (i) Optimise the number of salmon returning to home water fisheries, (ii) Maintain and improve fitness and diversity of salmon stocks. (Hi) Optimise the total economic value of surplus stocks, (iv) Ensure necessary costs are met by beneficiaries

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the River Ehen and Calder sub catchment management plan: Consultation Report September 1993 produced by the National Rivers Authority (NRA) North West Region in 1993. The report focuses on the management plan of both River Catchments Ehen and Calder, in North West England, UK. The Catchment Management Plan (C.M.P.) enabled the NRA to summarise the status of the catchment, identify the main issues and present its vision of the future. It provides a strategic policy framework for its Management and influences decision making leading to improvements in the water environment. The report contains sections on Description of Catchment, Catchment uses by NRA function, Target and objectives of the plan, Summary of Issues and Catchment Issues. The section on description of Catchment includes a general description, Transport, Geology, major services, summary of key details, area, topography, administrative details, main towns and population, water quality Sewage Treatment Works Trade effluent discharges, Water Resources, flood defence and land drainage and Fisheries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Historic map of the River Lune Fishery District.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the Water Level Management Plan for the Rostherne Mere by the Environment Agency. The purpose of the Plan is to provide a formal basis for managing the land drainage system and water supply system of the area in order to provide a sustainable balance between the conservation and agricultural interest in the area. No changes are proposed to present water level management or maintenance practices unless and until such changes are agreed by all parties. The report contains sections on description of Site, water level management, maintenance, nature conservation, agriculture, fisheries, archaeology, water quality and water resources, development adjacent to watercourses, contingencies and objectives of the Water Level Management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is a report on the Conservation Plan for Rostherne Mere. The project primarly involved collating existing information from a variety of sources, supplemented by a limited amount of survey work commissioned for the project, including identification of the surface water catchment, water flows, and land use within the catchment. The section 1 outlines the physical situation of the Site of Special Scientific Interest (SSSI), its geological setting and hydrological regime. A summary of the ecological characteristics, conservation interest and objectives is provided in Section 2, and the issues affecting the site are identified in Section 3. . Operations and mechanisms for addressing the issues are suggested in Section 4, compiled from field visits, information held on file by English Nature and the Environment Agency, and English Nature. The last Section 5 provides a brief summary of the site’s condition and a discussion of the issues and operations suggested. A summary table is provided of the recommended actions for each site. Supporting information on the hydrology and aquatic ecology (where relevant) is provided in appendices.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the River Gowy and Thornton Brook improvements: Environmental Action Plan report produced by the Environment Agency in 2000. This Environmental Action Plan relates to the proposals by the Environment Agency to improve the flood defences of land adjacent to the River Gowy, about 3 km east of Ellesmere Port, Cheshire. The purpose of the Environmental Action Plan (EAP) is to provide details of how the issues addressed in the Environmental Statement (ES) will be carried through to the completion of the project. The EAP represents a commitment to the environmental recommendations formulated during the environmental assessment process and should be closely adhered to during the design, construction and post project monitoring o f the works. For any matters that cannot be finalised until during construction the constraints will be detailed in the plan so they are implemented in the contracts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the River Camel Salmon Action Plan Final document produced by the Environment Agency in 2002. This final Salmon Action Plan (SAP) for the River Camel catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Camel salmon stock. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. This Action Plan aims to promote long term collaboration and co-operation between the Agency and other interested parties to effectively and efficiently manage the stock of salmon on the River Camel.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the River Fowey Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Fowey catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Fowey salmon stock. The actions presented within this final Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. The main objective of the Fowey SAP therefore, is to maintain, improve and develop the Fowey salmon stocks to a sustainable level that, on the basis of historic catch records, the catchment can clearly support. Although the Fowey is passing its conservation limit, the consultees felt very strongly that there were two major factors limiting the salmon stock of the River Fowey- the overgrazing of Bodmin Moor and the use of the catchment for water supply by South West Water.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the River Lynher Salmon Action Plan Final document produced by the Environment Agency in 1999. This final Salmon Action Plan (SAP) for the River Lynher catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Lynher salmon stock. The actions presented within this final Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. The River Lynher salmon stock has suffered two periods of spawning target failure within the past ten years. This assessment can only be estimated and in this case is likely to be dependent on river flow and the availability of salmon to the rods as only rod catch is used in the compliance assessment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the River Plym Salmon Action Plan Final document produced by the Environment Agency in 2003. This final Salmon Action Plan (SAP) for the River Plym catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Lynher salmon stock. These issues and actions follow on from the detailed analysis of the catchment, which is presented in the River Plym SAP Consultation document.The actions presented within this final Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. The main objective of the River Plym SAP therefore, is to maintain, improve and develop the River Plym salmon stocks to a sustainable level that, on the basis of historic catch records, the catchment can clearly support. The River Plym has failed to pass its conservation limit since 1996, and the consultees felt very strongly that there were three major factors limiting the salmon stock of the River Plym.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the River Tavy Salmon Action Plan Final document produced by the Environment Agency in 2000. This final Salmon Action Plan (SAP) for the River Tavy catchment has been produced after consideration of feedback from external consultation. It provides a list of the agreed issues and actions for the next five years to maintain and improve the River Tavy salmon stock. The actions presented within this Salmon Action Plan clarify the important issues and factors currently limiting the salmon stock on the river. The resolution of these issues should ensure that a sustainable salmon population will be maintained for future generations. An attempt has been made to cost these actions, identify possible sources of funding and to provide a timescale for action. This Action Plan aims to promote long term collaboration and co-operation between the Agency and other interested parties to effectively and efficiently manage the stock of salmon on the River Tavy.