49 resultados para India. Army. Madras Army. Corps of Engineers.
Resumo:
(PDF contains 24 pages)
Resumo:
The bay anchovy occurs along the Atlantic and Gulf of Mexico coasts, from Cape Cod, Massachusetts, to Yucatan, Mexico (Hildebrand 1963), except for the Florida Keys where it is apparently absent (Daly 1970). (PDF contains 22 pages)
Resumo:
(PDF contains 24 pages)
Resumo:
The impacts of widening and deepening the existing navigation channel in Grays Harbor on Dungeness crab, crangon shrimp and fish was investigated. The spatial and temporal distribution of these organisms was studied using an otter trawl and ring nets, and the uptake of organisms by dredges was estimated from samples collected on working hopper and pipeline dredges. ... Impacts of the dredging project on crabs, shrimp and fish could be associated with entrainment, food loss and toxicants released from sediments. Scenarios are presented that predict impacts. Suggestions for reducing impacts are given.
Resumo:
How is climate change affecting our coastal environment? How can coastal communities adapt to sea level rise and increased storm risk? These questions have garnered tremendous interest from scientists and policy makers alike, as the dynamic coastal environment is particularly vulnerable to the impacts of climate change. Over half the world population lives and works in a coastal zone less than 120 miles wide, thereby being continuously affected by the changes in the coastal environment [6]. Housing markets are directly influenced by the physical processes that govern coastal systems. Beach towns like Oak Island in North Carolina (NC) face severe erosion, and the tax assesed value of one coastal property fell by 93% in 2007 [9]. With almost ninety percent of the sandy beaches in the US facing moderate to severe erosion [8], coastal communities often intervene to stabilize the shoreline and hold back the sea in order to protect coastal property and infrastructure. Beach nourishment, which is the process of rebuilding a beach by periodically replacing an eroding section of the beach with sand dredged from another location, is a policy for erosion control in many parts of the US Atlantic and Pacific coasts [3]. Beach nourishment projects in the United States are primarily federally funded and implemented by the Army Corps of Engineers (ACE) after a benefit-cost analysis. Benefits from beach nourishment include reduction in storm damage and recreational benefits from a wider beach. Costs would include the expected cost of construction, present value of periodic maintenance, and any external cost such as the environmental cost associated with a nourishment project (NOAA). Federal appropriations for nourishment totaled $787 million from 1995 to 2002 [10]. Human interventions to stabilize shorelines and physical coastal dynamics are strongly coupled. The value of the beach, in the form of storm protection and recreation amenities, is at least partly capitalized into property values. These beach values ultimately influence the benefit-cost analysis in support of shoreline stabilization policy, which, in turn, affects the shoreline dynamics. This paper explores the policy implications of this circularity. With a better understanding of the physical-economic feedbacks, policy makers can more effectively design climate change adaptation strategies. (PDF contains 4 pages)
Resumo:
Boat wakes in the Atlantic Intracoastal Waterway (AIWW) of North Carolina occur in environments not normally subjected to (wind) wave events, making sections of AIWW potentially vulnerable to extreme wave events generated by boat wakes. The Snow’s Cut area that links the Cape Fear River to the AIWW is an area identified by the Wilmington District of the U.S. Army Corps of Engineers as having significant erosion issues; it was hypothesized that this erosion could be being exacerbated by boat wakes. We compared the boat wakes for six combinations of boat length and speed with the top 5% wind events. We also computed the benthic shear stress associated with boat wakes and whether sediment would move (erode) under those conditions. Finally, we compared the transit time across Snow’s Cut for each speed. We focused on two size classes of V-hulled boats (7 and 16m) representative of AIWW traffic and on three boat speeds (3, 10 and 20 knots). We found that at 10 knots when the boat was plowing and not yet on plane, boat wake height and potential erosion was greatest. Wakes and forecast erosion were slightly mitigated at higher, planing speeds. Vessel speeds greater than 7 knots were forecast to generate wakes and sediment movement zones greatly exceeding that arising from natural wind events. We posit that vessels larger than 7m in length transiting Snow’s Cut (and likely many other fetch-restricted areas of the AIWW) frequently generate wakes of heights that result in sediment movement over large extents of the AIWW nearshore area, substantially in exceedance of natural wind wave events. If the speed, particularly of large V-hulled vessels (here represented by the 16m length class), were reduced to pre-plowing levels (~ 7 knots down from 20), transit times for Snow’s Cut would be increased approximately 10 minutes but based on our simulations would likely substantially reduce the creation of erosion-generating boat wakes. It is likely that boat wakes significantly exceed wind wave background for much of the AIWW and similar analyses may be useful in identifying management options.
Resumo:
HIGHLIGHTS FOR FY 2009 1. Completed the second of a two-year Gulf sturgeon population study on the Choctawhatchee River, Florida. The juvenile, sub adult and adult Gulf sturgeon population was estimated at 3,400 fish. 2. Three young of year Gulf sturgeon were collected by Corps of Engineers biologists in the upper Brothers Rivers. 3. Two YCC enrollees spent eight weeks assisting PCFO biologists and Tyndall AFB with various projects. 4. The Gulf Sturgeon 5-Year Summary and Evaluation was completed. 5. Karen Herrington co-authored a peer-reviewed journal article for a striped bass symposium at the annual American Fisheries Society meeting, which will be published in the symposium proceedings. The article reviews the past 25 years of striped bass restoration in the ACF and is titled “Restoration of Gulf Striped Bass: Lessons and Management Implications”. 6. We documented recent purple bankclimber recruitment in the Ochlockonee River for the first time in several years. 7. We provided over 200 genetic samples to Warm Springs Fish Technology Center to compare mussel populations and genetic diversity, rank populations by status, and facilitate recovery actions. 8. We established permanent mussel monitoring locations in Sawhatchee Creek and the Flint River to examine trends in population size, survival, and recruitment. 9. We provided a prioritized list to the Federal Emergency Management Agency of 197 stream crossings that occur near freshwater mussel populations in order to facilitate habitat restoration following major flooding in Alabama, Florida, and Georgia in the spring of 2009.
Resumo:
HIGHLIGHTS FOR FY 2003 1. Continued a 3-year threatened Gulf sturgeon population estimate in the Escambia River, Florida and conducted presence-absence surveys in 4 other Florida river systems and 1 bay. 2. Five juvenile Gulf sturgeon collected, near the mouth of the Choctawhatchee River, Florida, were equipped with sonic tags and monitored while over-wintering in Choctawhatchee Bay. 3. Continued to examine Gulf sturgeon marine habitat use. 4. Implemented Gulf Striped Bass Restoration Plan by coordinating the 20th Annual Morone Workshop, leading the technical committee, transporting broodfish, and coordinating the stocking on the Apalachicola-Chattahoochee-Flint (ACF) river system. 5. Over 73,000 Phase II Gulf striped bass were marked with sequential coded wire tags and stocked in the Apalachicola River. Post-stocking evaluations were conducted at 31 sites. 6. Three stream fisheries assessment s were completed to evaluate the fish community at sites slated for habitat restoration by the Partners for Fish and Wildlife Program (PFW). 7. PFW program identified restoration needs and opportunities for 10 areas. 8. Developed an Unpaved Road Evaluation Handbook. 9. Completed restoration of Chipola River Greenway, Seibenhener Streambank Restoration, Blackwater River State Forest, and Anderson Property. 10. Assessments for fluvial geomorphic conditions for design criteria were completed for 3 projects. 11. Geomorphology in Florida streams initiated development of Rosgen regional curves for Northwest Florida for use by the Florida Department of Transportation. 12. Developed a Memorandum of Understanding between partners for enhancing, protecting, and restoring stream, wetland, and upland habitat in northwest Florida 13. Completed aquatic fauna and fish surveys with new emphasis on integration of data from reach level into watershed and landscape scale and keeping database current. 14. Compliance based sampling of impaired waterbodies on Eglin Air Force Base in conjunction with Florida Department of Environmental Protection for Total Maximum Daily Load development support. 15. Surveyed 20 sites for the federally endangered Okaloosa darter, provided habitat descriptions, worked with partners to implement key recovery tasks and set priorities for restoration. 16. Worked with partners to develop a freshwater mussel survey protocol to provide standard operating procedures for establishing the presence/absence of federally listed mussel species within a Federal project area. 17. GIS database was created to identify all known freshwater mussel records from the northeast Gulf ecosystem. 18. Completed recovery plan for seven freshwater mussels and drafted candidate elevation package for seven additional mussels. Developed proposals to implement recovery plan. 19. Worked with Corps of Engineers and State partners to develop improved reservoir operating policies to benefit both riverine and reservoir fisheries for the ACF river system. 20. Multiple outreach projects were completed to detail aquatic resources conservation opportunities. 21. Multiple stream restoration and watershed management projects initiated or completed (see Appendix A).
Resumo:
Data quantifying various aspects of the Corps of Engineers wetland regulatory program in Louisiana from 1980 through 1990 are presented. The National Marine Fisheries Service (NMFS) habitat conservation efforts for this time period are described and averages involved delineated. From 1980 through 1990, NMFS reviewed 14,259 public notices to dredge, fill, or impound wetlands in Louisiana and provided recommendations to the Corps on 962 projects which proposed to impact over 600,000 acres of tidally influenced wetlands. NMFS recommended that impacts to about 279,000 acres be avoided and that more than 150,000 acres of compensatory mitigation be provided. During this period, marsh management projects proposed impounding over 197,000 acres of wetlands. On a permit by permit basis, 43% of NMFS recommendations were accepted, 34% were partially accepted, and 23% were rejected.
Resumo:
Dataq uantifying the area of habitat affected by Federal programs that regulate development in coastal zones of the southeastern United States are provided for 1988. The National Marine Fisheries Service (NMFS) made recommendations on 3,935 proposals requiring Federal permits or licenses to alter wetlands. A survey of 977 of these activities revealed that 359,876 acres of wetlands that support fishery resources under NMFS purview were proposed for some type of alteration or manipulation. Almost 95 percent of this acreage was for impounding andl/or manipulation of water levels in Louisiana marshes. The NMFS did not object to alteration of 173,284 acres and recommended the conservation of 186,592 acres. To offset habitat losses, 1,827 acres of mitigation were recommended by the NMFS or proposed by applicants and/or the Corps of Engineers (COE). From 1981 to 1988 the NMFS has provided in depth analyses on 8,385 projects proposing the alteration of at least 656,377 acres of wetlands. A follow-up survey on the disposition of 339 permits handled by the COE during 1988 revealed that the COE accepted NMFS recommendations on 68 percent. On a permit-by-permit basis, 13 percent of NMFS recommendations were partially accepted, 17 percent were completely rejected, and 2 percent were withdrawn. The permit requests tracked by the NMFS proposed the alteration of 2,674 acres of wetlands. The COE issued permits to alter 847 acres or 32 percent of the amount proposed.
Resumo:
This report is the final product of a two-year study conducted for the Office, Chief of Engineers, by the Moss Landing Marine Laboratories, Moss Landing, California, under Contract No. DACW39-74-C-OI51 with the Environmental Effects Laboratory (EEL), U. S. Army Engineer Waterways Experiment Station (WES), Yicksburg, Mississippi. (PDF contains 192 pages)