17 resultados para Environmental impact study


Relevância:

90.00% 90.00%

Publicador:

Resumo:

The mobile water hyacinth, which was produced in growth zones, especially Murchison Bay, was mainly exported to three sheltered storage bays (Thruston, Hannington and Waiya). Between 1996 and May 1998, the mobile form of water hyacinth occupied about 800 ha in Thruston Bay, 750 ha in Hannington Bay and 140 ha in Waiya Bay). Biological control weevils and other factors, including localised nutrient depletion, weakened the weed that was confined to the bays and it sunk around October 1998. The settling to the bottom of such huge quantities of organic matter its subsequent decomposition and the debris from this mass was likely to have environmental impacts on biotic communities (e.g. fish and invertebrate), physico-chemical conditions (water quality), and on socio-economic activities (e.g. at fish landings, water abstraction, and hydro-power generation points). Sunken water. hyacinth debris could also affect nutrient levels in the water column and lead to reduction in the content of dissolved oxygen. The changes in nutrient dynamics and oxygen levels could affect algal productivity, invertebrate composition and fish communities. Socio-economic impacts of dead sunken weed were expected from debris deposited along the shoreline especially at fish landings, water abstraction and hydropower generation points. Therefore, environmental impact assessment studies were carried out between 1998 and 2002 in selected representative zones of Lake Victoria to identify the effects of the sunken water hyacinth biomass

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The purpose of this present study therefore is to provide and update the AES Nile Power EIA baseline information on the ecology of the river ecosystem prior to the construction of the dam. The study is intended to provide a basis for evaluating the impact of the project on the river environment, the biological resources associated with it and fisheries socia-economics and the vector/sanitation status. This report presents the findings of the first sampling regime which was conducted between the dates of 6th-13th April 2006 and compared with the AESNP Environmental Impact Assessment findings of the second quarter carried out during 5th-14th April 2000.