2 resultados para Vibration (Marine engineering)


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Offshore structures with numerous applications in different environments throughout the world and used at different depths. Due to the expansion of marine industries, including offshore oil industry in Iran , particularly in the Persian Gulf region, in order to more accurately model these structures and to prevent incidents such as the Overturning of the platform serious damage to the South Pars Phase ١٣ was platforms, the use New Technic is essential technologies. One of the methods that are used in the construction of offshore wind turbines, using a pre-pile. In this method, a template is constructed with the dimensions specified in the workshop. After making templates using special vessels for placement in the desired location on the sea bed is carried, then the template is placed on the sea bed, Then, using a hammer for Pile Driving Operation Started Vibration hammer and fit the template of 3 or 4 piles of crushed within this template on the seabed . The next step piling, templates have been removed from the site And Jacket placed on piles. The system was installed on the deck on piles and Consequently Deck Load pile inserted on .It should be noted that the design of these types of platforms, base diameter of the pile diameter independent of the choice as one of the major advantages of this system is. This thesis examines a Template Fixed Platform in the oil Soroush Using the Pre-Piling and the Common Piling systems in the Persian Gulf were studied and the effect of different design compared to the Pre-Piling Platforms Persian Gulf were evaluated. The results suggest that Pre-Piling system compared with conventional systems piling in the Persian Gulf, as a more appropriate model structure and behavior Top Model economic efficiency is selected. It should be noted that all calculations and analyzes were performed using Software Abaqus.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this study, consider to the mechanism of controlled depletion paint, has been made the Antifouling (A/F) paints that use these in a paint system which applied on the steel. As a first step, it is necessary to prove that the system subject to investigation does fit into the mechanisms proposed for the CDPs system. According to this, the machine was designed and built as for ASTM D5108-90, D4939-89. Specimens immersed in natural sea water and were rotating by 60 r/min rotor. Painted specimens were tested for 59 days. The main objective of this study was to investigate if new antifouling paint are less toxic than traditional paint and more efficient. For this reason, Zineb and Ziram which is an ingredient in antifouling paints, was also studied. Zineb and Ziram are known as booster biocides in A/P composition. We used the Zineb and Ziram and synthesis of these in a A/F paints. The concentration of booster biocides are 3% and 6% in paints. We use scanning electron microscopy (SEM) for evaluation of paint film. The settlement and the growth of living organism on immersed surfaces was observed during 59 days. According to reports, the growth of organism was observed for A/F paint contains, 3% Zineb after 20days,3%Ziram after 24days and 3% Zineb +Ziram after 30days. By measuring leached rate of the Zn in A/F paints, we figured out the effectiveness of booster biocides on the growth of organism, for example in the absence of booster biocides, the critical released rate for preventing biofilm for A/F paint with ZnO is 15 μg/cm2day. This despite the fact that this figure for A/F paint contain Zineb is 4 μg/cm2, Ziram is 3 μg/cm2 and Zineb +Ziram is 2 μg/cm2.