2 resultados para rebirth of an old drug

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Partido Stream is a small torrential course that flows into the marsh of the Doñana National Park, an area that was declared a World Heritage Site in 1994. Before 1981, floods occurred, and the stream overflowed onto a floodplain. As an old alluvial fan, the floodplain has its singular orography and functionality. Fromthe floodplain, several drainage channels, locally called caño, discharged into themarsh. The Partido Streamhad themorphology of a caño and covered approximately 8 km from the old fan to the marsh. The stream was straightened and channelised in 1981 to cultivate the old fan. This resulted in floods that were concentrated between the banks in the following years, which caused the depth of water and the shear stress to increase, thus, scouring the river bed and river banks. In this case, the eroded materials were carried towards the marsh where a new alluvial fan evolved. Control measures on the old fan were implemented in 2006 to stop the development of the new alluvial fan downstream over the marsh. Thus, the stream would partially recover its original behaviour that it had before channelisation, moving forwards in a new, balanced state. The present study describes the geomorphological evolution that channelisation has caused since 1981 and the later slow process of recovery of the original hydraulic-sedimentation regime since 2006. Additionally, it deepens the understanding of the original hydraulic behaviour of the stream, combining field data and 2D simulations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Automated Teller Machines (ATMs) are sensitive self-service systems that require important investments in security and testing. ATM certifications are testing processes for machines that integrate software components from different vendors and are performed before their deployment for public use. This project was originated from the need of optimization of the certification process in an ATM manufacturing company. The process identifies compatibility problems between software components through testing. It is composed by a huge number of manual user tasks that makes the process very expensive and error-prone. Moreover, it is not possible to fully automate the process as it requires human intervention for manipulating ATM peripherals. This project presented important challenges for the development team. First, this is a critical process, as all the ATM operations rely on the software under test. Second, the context of use of ATMs applications is vastly different from ordinary software. Third, ATMs’ useful lifetime is beyond 15 years and both new and old models need to be supported. Fourth, the know-how for efficient testing depends on each specialist and it is not explicitly documented. Fifth, the huge number of tests and their importance implies the need for user efficiency and accuracy. All these factors led us conclude that besides the technical challenges, the usability of the intended software solution was critical for the project success. This business context is the motivation of this Master Thesis project. Our proposal focused in the development process applied. By combining user-centered design (UCD) with agile development we ensured both the high priority of usability and the early mitigation of software development risks caused by all the technology constraints. We performed 23 development iterations and finally we were able to provide a working solution on time according to users’ expectations. The evaluation of the project was carried out through usability tests, where 4 real users participated in different tests in the real context of use. The results were positive, according to different metrics: error rate, efficiency, effectiveness, and user satisfaction. We discuss the problems found, the benefits and the lessons learned in the process. Finally, we measured the expected project benefits by comparing the effort required by the current and the new process (once the new software tool is adopted). The savings corresponded to 40% less effort (man-hours) per certification. Future work includes additional evaluation of product usability in a real scenario (with customers) and the measuring of benefits in terms of quality improvement.