5 resultados para public justifications analysis

em Universidad Politécnica de Madrid


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Transportation infrastructure is known to affect the value of real estate property by virtue of changes in accessibility. The impact of transportation facilities is highly localized as well, and it is possible that spillover effects result from the capitalization of accessibility. The objective of this study was to review the theoretical background related to spatial hedonic models and the opportunities that they provided to evaluate the effect of new transportation infrastructure. An empirical case study is presented: the Madrid Metro Line 12, known as Metrosur, in the region of Madrid, Spain. The effect of proximity to metro stations on housing prices was evaluated. The analysis took into account a host of variables, including structure, location, and neighborhood and made use of three modeling approaches: linear regression estimation with ordinary least squares, spatial error, and spatial lag. The results indicated that better accessibility to Metrosur stations had a positive impact on real estate values and that the effect was marked in cases in which a house was for sale. The results also showed the presence of submarkets, which were well defined by geographic boundaries, and transport fares, which implied that the economic benefits differed across municipalities.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Public Private Partnerships (PPPs) are mostly implemented to circumvent budgetary constraints, and to encourage efficiency and quality in the provision of public infrastructure in order to reach social welfare. One of the ways of reaching the latter objective is by the introduction of performance based standards tied to bonuses and penalties to reward or punish the performance of the contractor. This paper focuses on the implementation of safety based incentives in PPPs in such a way that the better the safety outcome the greater larger will be the economic reward to the contractor. The main aim of this paper is to identify whether the incentives to improve road safety in PPPs are ultimately effective in improving safety ratios in Spain. To that end, Poisson and negative binomial regression models have been applied using information of motorways of the Spanish network of 2006. The findings indicate that even though road safety is highly influenced by variables that are not much controllable by the contractor such as the Average Annual Daily Traffic and the percentage of heavy vehicles, the implementation of safety incentives in PPPs has a positive influence in the reduction of fatalities, injuries and accidents.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

OUTLINE: • Introduction • Experimental Setup • Experimental Procedure • Experimental Results - Surface Roughness - Residual Stresses - Friction - Wear - EDX • Conclusions

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper describes a theoretical model based primarily on transaction costs, for comparing the various tendering mechanisms used for transportation Public-Private Partnership (PPP) projects. In particular, the model contrasts negotiated procedures with the open procedure, as defined by the current European Union legislation on public tendering. The model includes both ex ante transaction costs (borne during the tendering stage) and ex post transaction costs (such as enforcement costs, re-negotiation costs, and costs arising from litigation between partners), explaining the trade-off between them. Generally speaking, it is assumed that the open procedure implies lower transaction costs ex ante, while the negotiated procedure reduces the probability of the appearance of new contingencies not foreseen in the contract, hence diminishing the expected value of transaction costs ex post. Therefore, the balance between ex ante and ex post transaction costs is the main criterion for deciding whether the open or negotiated procedure would be optimal. Notwithstanding, empirical evidence currently exists only on ex ante transaction costs in transportation infrastructure projects. This evidence has shown a relevant difference between the two procedures as far as ex ante costs are concerned, favouring the open procedure. The model developed in this paper also demonstrates that a larger degree of complexity in a contract does not unequivocally favour the use of a negotiated procedure. Only in those cases dealing with very innovative projects, where important dimensions of the quality of the asset or service are not verifiable, may we observe an advantage in favour of the negotiated procedure. The bottom line is that we find it difficult to justify the employment of negotiated procedures in most transportation PPP contracts, especially in the field of roads. Nevertheless, the field remains open for future empirical work and research on the levels of transaction costs borne ex post in PPP contracts, as well as on the probabilities of such costs appearing under any of the procurement procedures.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper discusses a model based on the agency theory to analyze the optimal transfer of construction risk in public works contracts. The base assumption is that of a contract between a principal (public authority) and an agent (firm), where the payment mechanism is linear and contains an incentive mechanism to enhance the effort of the agent to reduce construction costs. A theoretical model is proposed starting from a cost function with a random component and assuming that both the public authority and the firm are risk averse. The main outcome of the paper is that the optimal transfer of construction risk will be lower when the variance of errors in cost forecast, the risk aversion of the firm and the marginal cost of public funds are larger, while the optimal transfer of construction risk will grow when the variance of errors in cost monitoring and the risk aversion of the public authority are larger