3 resultados para credit rating agencies, sovereign ratings, sovereign risk, public debt

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Actualmente se está empezando a consolidar una nueva forma de gestionar la conservación y mantenimiento de la red viaria de las Administraciones Públicas, basándose en contratos de colaboración público-privadas (PPP). Las motivaciones que están provocando este movimiento son de diversa índole. Por un lado, en el seno de la Unión Europea, existen serias restricciones presupuestarias debido al alto endeudamiento del sector público, lo que está llevando a buscar la forma óptima de disminuir el endeudamiento público, sin dejar de prestar servicios a la sociedad como la conservación y mantenimiento de las redes viarias. Por esta vertiente, se trata de convertir contratos convencionales de conservación viaria a esquemas de colaboración público-privada, donde se transferiría al sector privado el riesgo de disponibilidad de la vía mediante el uso de indicadores de calidad y servicio. Con esta transferencia de riesgo, junto con la transferencia del riesgo de demanda/construcción, no consolidaría la deuda de la sociedad de propósito específico constituida para la gestión del contrato de colaboración público-privada dentro de las cuentas públicas, con lo que se conseguiría no aumentar el déficit público, permitiendo continuar ofreciendo el servicio demandado por la sociedad. Por otro lado, la segunda motivación del desarrollo de este tipo de contratos, no tan economicista como la anterior y más enfocada a la gestión, se trata de utilizar los contratos de gestión basados en el uso de indicadores de calidad de servicio para mejorar las prestaciones de la red viaria competencia de una Administración. Con el uso de estos indicadores, el gestor tiene una herramienta muy útil para controlar la actividad del sector privado y asegurar que se ofrece un buen servicio. En la presente tesis, la investigación se ha centrado más en la vertiente de los indicadores de calidad relacionados con la gestión eficiente de las vías objeto de conservación y mantenimiento mediante el empleo de contratos de gestión privada que utilicen este tipo de herramientas de control, monitorización y gestión. En una primera parte, la presente tesis estudia el estado de la red de carreteras, referido principalmente a España, comparando su estado con el resto de redes de carreteras de Europa, detectando las principales carencias de la misma, sobre todo en cuanto a la gestión y conservación de firmes. En un segundo bloque, la tesis analiza el estado del arte de los nuevos procedimientos de gestión de la conservación y mantenimiento basados en indicadores de calidad del servicio en el mundo, destacándose que se trata de un tema relativamente reciente, con gran interés para el sector de la gestión y financiación de infraestructuras viarias. Al ser tan novedoso, por la falta de experiencias previas, las distintas Administración, tanto propias como foráneas, han pecado de un exceso de celo a la hora de establecer los umbrales sobre los que giran los distintos indicadores de calidad de servicio que permiten controlar la gestión de la conservación y mantenimiento de la vía. Partiendo de la labor de análisis descrita, la tesis realiza una investigación más detallada de los indicadores de calidad de servicio correspondientes a firmes bituminosos, debido a que estos indicadores son los más delicados y decisivos a la hora de realizar una correcta gestión de la vía a largo plazo. Dentro de los indicadores de firmes bituminosos, se ha realizado un modelo específico de evolución de comportamiento a lo largo del tiempo de la regularidad superficial, parámetro básico para numerosas Administraciones y organismos investigadores para poder conocer la evolución de un firme a lo largo del tiempo. A esta metodología se le ha dado el nombre de Modelo JRB para evaluar la racionalidad económica de indicadores de calidad asociados a parámetros de firmes. El modelo propuesto básicamente evalúa el valor óptimo desde la perspectiva económica que ha de tener el parámetro técnico que defina alguna propiedad del firme, aplicado a la definición de los indicadores de calidad de servicio. Esta visión del valor umbral del indicador deja a un lado consideraciones de equidad o de cualquier otra índole, basándose más en una visión económica. La metodología del Modelo JRB se puede aplicar a cualquier indicador de calidad relacionado con firmes, ya que lo que se obtiene es el valor óptimo económico que debería tener el umbral del indicador de calidad. El Modelo JRB consta de varias fases. En las primeras etapas el Modelo realiza el cálculo de los costes totales de transporte utilizando como herramienta el software HDM-IV desarrollado por el Banco Mundial. En etapas posteriores, el Modelo realiza análisis de sensibilidad para distintas propuestas de sección de firme, intensidades de tráfico y restricciones al parámetro técnico que define el indicador de calidad de servicio. Como ejercicio práctico de cara a contrastar la metodología del Modelo JRB se ha realizado un Caso de Estudio. Se ha tomado un tramo teórico, con características similares a la red de carreteras española, y con una flota vehicular similar a la española, donde se ha elegido como indicador de calidad la regularidad superficial (IRI). Con las sensibilidades realizadas con el Modelo JRB, se ha determinado el rango de valores que debería tener un indicador de calidad basado en el IRI para que dichos valores fueran óptimos desde la perspectiva económica Nowadays is becoming a new way to manage O&M (operation and maintenance) in public road networks, based on PPP contracts (public-private partnership). There are several issues which are driving this trend. On the one hand, EU (European Union) has serious budgetary constraints due to the high public sector borrowing. EU politicians are looking for the best way to reduce public debt, keeping services to society such as O&M of road networks. For this aspect, conventional O&M contracts are switching to PPP scenarios, where availability risk would be transfer to private sector using PI (performance indicators), along with demand risk transfer With this risk transference, along with the transfer of demand/construction risk, SPV (specific purpose vehicle) debt doesn’t consolidate in public accounts, so deficit wouldn’t increase, allowing the continuation of services demanded by society. On the other hand, the second motivation for developing this kind of contracts, not so economist as above and more focused to management, it is about using O&M contracts based on the use of PI to improve road network maintenance. Using these indicators, manager has a very useful tool to monitor private sector activity and ensure that it is provided a good service. In this thesis, the research has been focused on PI quality aspect, related with efficient management of PPP contracts for roads, which use these tools for control, monitoring and management. In the first part, this thesis examines the state of road network, based mainly in Spain, comparing with other road networks in Europe, identifying the main gaps in it, especially with regard to the management and maintenance of pavements. In a second block, the thesis analyzes the state of art of new O&M contracts based on PI in the world, emphasizing that they are relatively recent. These kinds of contracts have a great interest in road management and financing sector. Administrations all around the world have launch tenders with very exigent PI thresholds due to several factors: this knowledge is a new area, the lack of previous experiences and the variety of Administrations which have bid these contracts. Building on the described analysis, thesis develops a more detailed research about PI for bituminous pavements, because these PI are the most delicate and decisive in making a proper long term road management. Among bituminous pavements PI, IRI (International Roughness Index) has been analyzed with more detail and has been developed a specific model of behaviour evolution over time for evenness (IRI), basic parameter for many administrations and research departments in order to know the evolution of a pavement over time. This methodology has been given the name of JRB Model to evaluate the economic rationality of performance indicators associated with pavements parameters. The proposed model basically evaluates the optimal value from an economic perspective it must have the technical parameter which defines some pavement characteristic applied to the definition of performance indicators. This point of view of indicator value threshold sets aside justice considerations or otherwise, based more on an economic perspective. JRB Model methodology can be applied to any performance indicator associated to pavements, because what you get is the economic optimum threshold should have the performance indicator. JRB Model consists of several phases. In the early stages, the Model calculates transport total cost using HDM-IV software, developed by the World Bank, as a tool. In later stages, the Model performs sensitivity analyzes for different pavement section, AADT and restrictions to the technical parameter which defines the performance indicator. As a practical exercise to test JRB Model methodology, it has done a Case Study. It has taken a theoretical section, with similar characteristics to Spanish road network, and a vehicles fleet similar to Spanish. Evenness (IRI) was chosen as a performance indicator. JRB Model calculated some sensitivities, which were useful to determined thresholds range for pavement performance indicators based on IRI to be optimal from an economic perspective.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

(Matsukawa and Habeck, 2007) analyse the main instruments for risk mitigation in infrastructure financing with Multilateral Financial Institutions (MFIs). Their review coincided with the global financial crisis of 2007-08, and is highly relevant in current times considering the sovereign debt crisis, the lack of available capital and the increases in bank regulation in Western economies. The current macroeconomic environment has seen a slowdown in the level of finance for infrastructure projects, as they pose a higher credit risk given their requirements for long term investments. The rationale for this work is to look for innovative solutions that are focused on the credit risk mitigation of infrastructure and energy projects whilst optimizing the economic capital allocation for commercial banks. This objective is achieved through risk-sharing with MFIs and looking for capital relief in project finance transactions. This research finds out the answer to the main question: "What is the impact of risk-sharing with MFIs on project finance transactions to increase their efficiency and viability?", and is developed from the perspective of a commercial bank assessing the economic capital used and analysing the relevant variables for it: Probability of Default, Loss Given Default and Recovery Rates, (Altman, 2010). An overview of project finance for the infrastructure and energy sectors in terms of the volume of transactions worldwide is outlined, along with a summary of risk-sharing financing with MFIs. A review of the current regulatory framework beneath risk-sharing in structured finance with MFIs is also analysed. From here, the impact of risk-sharing and the diversification effect in infrastructure and energy projects is assessed, from the perspective of economic capital allocation for a commercial bank. CreditMetrics (J. P. Morgan, 1997) is applied over an existing well diversified portfolio of project finance infrastructure and energy investments, working with the main risk capital measures: economic capital, RAROC, and EVA. The conclusions of this research show that economic capital allocation on a portfolio of project finance along with risk-sharing with MFIs have a huge impact on capital relief whilst increasing performance profitability for commercial banks. There is an outstanding diversification effect due to the portfolio, which is combined with risk mitigation and an improvement in recovery rates through Partial Credit Guarantees issued by MFIs. A stress test scenario analysis is applied to the current assumptions and credit risk model, considering a downgrade in the rating for the commercial bank (lender) and an increase of default in emerging countries, presenting a direct impact on economic capital, through an increase in expected loss and a decrease in performance profitability. Getting capital relief through risk-sharing makes it more viable for commercial banks to finance infrastructure and energy projects, with the beneficial effect of a direct impact of these investments on GDP growth and employment. The main contribution of this work is to promote a strategic economic capital allocation in infrastructure and energy financing through innovative risk-sharing with MFIs and economic pricing to create economic value added for banks, and to allow the financing of more infrastructure and energy projects. This work suggests several topics for further research in relation to issues analysed. (Matsukawa and Habeck, 2007) analizan los principales instrumentos de mitigación de riesgos en las Instituciones Financieras Multilaterales (IFMs) para la financiación de infraestructuras. Su presentación coincidió con el inicio de la crisis financiera en Agosto de 2007, y sus consecuencias persisten en la actualidad, destacando la deuda soberana en economías desarrolladas y los problemas capitalización de los bancos. Este entorno macroeconómico ha ralentizado la financiación de proyectos de infraestructuras. El actual trabajo de investigación tiene su motivación en la búsqueda de soluciones para la financiación de proyectos de infraestructuras y de energía, mitigando los riesgos inherentes, con el objeto de reducir el consumo de capital económico en los bancos financiadores. Este objetivo se alcanza compartiendo el riesgo de la financiación con IFMs, a través de estructuras de risk-sharing. La investigación responde la pregunta: "Cuál es el impacto de risk-sharing con IFMs, en la financiación de proyectos para aumentar su eficiencia y viabilidad?". El trabajo se desarrolla desde el enfoque de un banco comercial, estimando el consumo de capital económico en la financiación de proyectos y analizando las principales variables del riesgo de crédito, Probability of Default, Loss Given Default and Recovery Rates, (Altman, 2010). La investigación presenta las cifras globales de Project Finance en los sectores de infraestructuras y de energía, y analiza el marco regulatorio internacional en relación al consumo de capital económico en la financiación de proyectos en los que participan IFMs. A continuación, el trabajo modeliza una cartera real, bien diversificada, de Project Finance de infraestructuras y de energía, aplicando la metodología CreditMet- rics (J. P. Morgan, 1997). Su objeto es estimar el consumo de capital económico y la rentabilidad de la cartera de proyectos a través del RAROC y EVA. La modelización permite estimar el efecto diversificación y la liberación de capital económico consecuencia del risk-sharing. Los resultados muestran el enorme impacto del efecto diversificación de la cartera, así como de las garantías parciales de las IFMs que mitigan riesgos, mejoran el recovery rate de los proyectos y reducen el consumo de capital económico para el banco comercial, mientras aumentan la rentabilidad, RAROC, y crean valor económico, EVA. En escenarios económicos de inestabilidad, empeoramiento del rating de los bancos, aumentos de default en los proyectos y de correlación en las carteras, hay un impacto directo en el capital económico y en la pérdida de rentabilidad. La liberación de capital económico, como se plantea en la presente investigación, permitirá financiar más proyectos de infraestructuras y de energía, lo que repercutirá en un mayor crecimiento económico y creación de empleo. La principal contribución de este trabajo es promover la gestión activa del capital económico en la financiación de infraestructuras y de proyectos energéticos, a través de estructuras innovadoras de risk-sharing con IFMs y de creación de valor económico en los bancos comerciales, lo que mejoraría su eficiencia y capitalización. La aportación metodológica del trabajo se convierte por su originalidad en una contribución, que sugiere y facilita nuevas líneas de investigación académica en las principales variables del riesgo de crédito que afectan al capital económico en la financiación de proyectos.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper discusses a model based on the agency theory to analyze the optimal transfer of construction risk in public works contracts. The base assumption is that of a contract between a principal (public authority) and an agent (firm), where the payment mechanism is linear and contains an incentive mechanism to enhance the effort of the agent to reduce construction costs. A theoretical model is proposed starting from a cost function with a random component and assuming that both the public authority and the firm are risk averse. The main outcome of the paper is that the optimal transfer of construction risk will be lower when the variance of errors in cost forecast, the risk aversion of the firm and the marginal cost of public funds are larger, while the optimal transfer of construction risk will grow when the variance of errors in cost monitoring and the risk aversion of the public authority are larger