18 resultados para cost utility analysis

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the last few years, technical debt has been used as a useful means for making the intrinsic cost of the internal software quality weaknesses visible. This visibility is made possible by quantifying this cost. Specifically, technical debt is expressed in terms of two main concepts: principal and interest. The principal is the cost of eliminating or reducing the impact of a, so called, technical debt item in a software system; whereas the interest is the recurring cost, over a time period, of not eliminating a technical debt item. Previous works about technical debt are mainly focused on estimating principal and interest, and on performing a cost-benefit analysis. This cost-benefit analysis allows one to determine if to remove technical debt is profitable and to prioritize which items incurring in technical debt should be fixed first. Nevertheless, for these previous works technical debt is flat along the time. However the introduction of new factors to estimate technical debt may produce non flat models that allow us to produce more accurate predictions. These factors should be used to estimate principal and interest, and to perform cost-benefit analysis related to technical debt. In this paper, we take a step forward introducing the uncertainty about the interest, and the time frame factors so that it becomes possible to depict a number of possible future scenarios. Estimations obtained without considering the possible evolution of the interest over time may be less accurate as they consider simplistic scenarios without changes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The analysis addresses the issue of transport equity and explores three different approaches to equity in transport: utilitarianism, sufficientarianism and prioritarianism. Each approach calls for a different treatment of the benefits reaped by different population groups in the assessment of transport investments or policies. In utilitarianism, which underlies much of the current practice of transport project appraisal, all benefits receive the same weight, irrespective of the recipient of the benefits. In both sufficientarianism and prioritarianism, benefits are weighed in distinct ways, depending on the characteristics of the recipients. The three approaches are illustrated using a fictive case study, in which three different transport investment are assessed and compared to each other. Finally, the assessment of transport investments will be explored using the cost-effectiveness analysis (CEA). The CEA assesses the distributional effects of transport investments for utilitarism, sufficientarism and prioritarism approaches and addresses distinct needs associated with different population groups in respect to their transport

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Effective static analyses have been proposed which allow inferring functions which bound the number of resolutions or reductions. These have the advantage of being independent from the platform on which the programs are executed and such bounds have been shown useful in a number of applications, such as granularity control in parallel execution. On the other hand, in certain distributed computation scenarios where different platforms come into play, with each platform having different capabilities, it is more interesting to express costs in metrics that include the characteristics of the platform. In particular, it is specially interesting to be able to infer upper and lower bounds on actual execution time. With this objective in mind, we propose a method which allows inferring upper and lower bounds on the execution times of procedures of a program in a given execution platform. The approach combines compile-time cost bounds analysis with a one-time profiling of the platform in order to determine the values of certain constants for that platform. These constants calibrate a cost model which from then on is able to compute statically time bound functions for procedures and to predict with a significant degree of accuracy the execution times of such procedures in the given platform. The approach has been implemented and integrated in the CiaoPP system.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This article presents an alternative approach to the decision-making process in transport strategy design. The study explores the possibility of integrating forecasting, assessment and optimization procedures in support of a decision-making process designed to reach the best achievable scenario through mobility policies. Long-term evaluation, as required by a dynamic system such as a city, is provided by a strategic Land-Use and Transport Interaction (LUTI) model. The social welfare achieved by implementing mobility LUTI model policies is measured through a cost-benefit analysis and maximized through an optimization process throughout the evaluation period. The method is tested by optimizing a pricing policy scheme in Madrid on a cordon toll in a context requiring system efficiency, social equity and environmental quality. The optimized scheme yields an appreciable increase in social surplus through a relatively low rate compared to other similar pricing toll schemes. The results highlight the different considerations regarding mobility impacts on the case study area, as well as the major contributors to social welfare surplus. This leads the authors to reconsider the cost-analysis approach, as defined in the study, as the best option for formulating sustainability measures.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Assessing users’ benefit in a transport policy implementation has been studied by many researchers using theoretical or empirical measures. However, few of them measure users’ benefit in a different way from the consumer surplus. Therefore, this paper aims to assess a new measure of user benefits by weighting consumer surplus in order to include equity assessment for different transport policies simulated in a dynamic middle-term LUTI model adapted to the case study of Madrid. Three different transport policies, including road pricing, parking charge and public transport improvement have been simulated through the Metropolitan Activity Relocation Simulator, MARS, the LUTI calibrated model for Madrid). A social welfare function (WF) is defined using a cost benefit analysis function that includes mainly costs and benefits of users and operators of the transport system. Particularly, the part of welfare function concerning the users, (i.e. consumer surplus), is modified by a compensating weight (CW) which represents the inverse of household income level. Based on the modified social welfare function, the effects on the measure of users benefits are estimated and compared with the old WF ́s results as well. The result of the analysis shows that road pricing leads a negative effect on the users benefits specially on the low income users. Actually, the road pricing and parking charge implementation results like a regressive policy especially at long term. Public transport improvement scenario brings more positive effects on low income user benefits. The integrated (road pricing and increasing public services) policy scenario is the one which receive the most user benefits. The results of this research could be a key issue to understanding the relationship between transport systems policies and user benefits distribution in a metropolitan context.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

El proceso de soldadura por láser desarrollado en los últimos años ha puesto de manifiesto las posibilidades de aplicación de esta tecnología en diferentes sectores productivos, principalmente en la industria automovilística, en la cual se han demostrado sus ventajas en términos de productividad, eficiencia y calidad. El uso de la tecnología láser, ya sea híbrida o pura, reduce el input térmico al limitar la zona afectada por el calor, sin crear deformaciones y, por tanto, disminuye los re-trabajos post-soldadura necesarios para eliminarlas. Asimismo, se aumenta la velocidad de soldadura, incrementando la productividad y calidad de las uniones. En la última década, el uso de láseres híbridos, (láser + arco) de gran potencia de Neodimio YAG, (Nd: YAG) ha sido cada vez más importante. La instalación de este tipo de fuentes de láser sólido de gran potencia ha sido posible en construcción naval debido a sus ventajas con respecto a las instalaciones de láser de C02 existentes en los astilleros que actualmente utilizan esta tecnología. Los láseres de C02 están caracterizados por su gran potencia y la transmisión del haz a través de espejos. En el caso de las fuentes de Nd:YAG, debido a la longitud de onda a la cual se genera el haz láser, su transmisión pueden ser realizada a través de fibra óptica , haciendo posible la utilización del cabezal láser a gran distancia de la fuente, aparte de la alternativa de integrar el cabezal en unidades robotizadas. El proceso láser distribuye el calor aportado de manera uniforme. Las características mecánicas de dichas uniones ponen de manifiesto la adecuación de la soldadura por láser para su uso en construcción naval, cumpliendo los requerimientos exigidos por las Sociedades de Clasificación. La eficiencia energética de los láseres de C02, con porcentajes superiores al 20%, aparte de las ya estudiadas técnicas de su instalación constituyen las razones por las cuales este tipo de láser es el más usado en el ámbito industrial. El láser de gran potencia de Nd: YAG está presente en el mercado desde hace poco tiempo, y por tanto, su precio es relativamente mayor que el de C02, siendo sus costes de mantenimiento, tanto de lámparas como de diodos necesarios para el bombeo del sólido, igualmente mayores que en el caso del C02. En cambio, el efecto de absorción de parte de la energía en el plasma generado durante el proceso no se produce en el caso del láser de Nd: YAG, utilizando parte de esa energía en estabilizar el arco, siendo necesaria menos potencia de la fuente, reduciendo el coste de la inversión. En función de la aplicación industrial, se deberá realizar el análisis de viabilidad económica correspondiente. Dependiendo de la potencia de la fuente y del tipo de láser utilizado, y por tanto de la longitud de onda a la que se propaga la radiación electromagnética, pueden existen riesgos para la salud. El láser de neodimio se propaga en una longitud de onda, relativamente cercana al rango visible, en la cual se pueden producir daños en los ojos de los operadores. Se deberán establecer las medidas preventivas para evitar los riesgos a los que están expuestos dichos operadores en la utilización de este tipo de energía. La utilización del láser de neodimio: YAG ofrece posibilidades de utilización en construcción naval económicamente rentables, debido su productividad y las buenas características mecánicas de las uniones. Abstract The laser welding process development of the last years shows broad application possibilities in many sectors of industry, mostly in automobile production. The advantages of the laser beam process produce higher productivity, increasing the quality and thermal efficiency. Laser technology, arc-hybrid or pure laser welding, reduces thermal input and thus a smaller heat-affected zone at the work piece. This means less weldment distortion which reduces the amount of subsequent post-weld straightening work that needs to be done. A higher welding speed is achieved by use of the arc and the laser beam, increasing productivity and quality of the joining process. In the last decade use of hybrid technology (laser-GMA hybrid method) with high power sources Nd:YAG lasers, gained in importance. The installation of this type of higher power solid state laser is possible in shipbuilding industrial applications due to its advantages compare with the C02 laser sources installed in the shipyards which use this technology. C02 lasers are characterised by high power output and its beam guidance is via inelastic system of mirrors. In the case of Nd:YAG laser, due to its wavelength, the laser beam can be led by means of a flexible optical fibre even across large distances, which allows three dimensional welding jobs by using of robots. Laser beam welding is a process during which the heat is transferred to the welded material uniformly and the features of the process fulfilled the requirements by Classification Societies. So that, its application to the shipbuilding industry should be possible. The high quantum efficiency of C02 laser, which enabled efficiency factors up to 20%, and relative simple technical possibilities of implementation are the reasons for the fact that it is the most important laser in industrial material machining. High power Nd: YAG laser is established on the market since short time, so that its price is relatively high compared with the C02 laser source and its maintenance cost, lamp or diode pumped solid state laser, is also higher than in the case of C02 lasers. Nevertheless effect of plasma shielding does not exist with Nd:YAG lasers, so that for the gas-shielding welding process the optimal gases can be used regarding arc stability, thus power source are saved and the costs can be optimised. Each industrial application carried out needs its cost efficiency analysis. Depending on the power output and laser type, the dangerousness of reflected irradiation, which even in some meters distance, affects for the healthy operators. For the YAG laser process safety arrangements must be set up in order to avoid the laser radiation being absorbed by the human eye. Due to its wavelength of radiation, being relatively close to the visible range, severe damage to the retina of the eye is possible if sufficient precautions are not taken. Safety aspects are of vital importance to be able to shield the operator as well as other personal. The use of Nd:YAG lasers offers interesting and economically attractive applications in shipbuilding industry. Higher joining rates are possible, and very good mechanical/technological parameters can be achieved.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This article presents an alternative approach to the decision-making process in transport strategy design. The study explores the possibility of integrating forecasting, assessment and optimization procedures in support of a decision-making process designed to reach the best achievable scenario through mobility policies. Long-term evaluation, as required by a dynamic system such as a city, is provided by a strategic Land-Use and Transport Interaction (LUTI) model. The social welfare achieved by implementing mobility LUTI model policies is measured through a cost-benefit analysis and maximized through an optimization process throughout the evaluation period. The method is tested by optimizing a pricing policy scheme in Madrid on a cordon toll in a context requiring system efficiency, social equity and environmental quality. The optimized scheme yields an appreciable increase in social surplus through a relatively low rate compared to other similar pricing toll schemes. The results highlight the different considerations regarding mobility impacts on the case study area, as well as the major contributors to social welfare surplus. This leads the authors to reconsider the cost-analysis approach, as defined in the study, as the best option for formulating sustainability measures.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

La heterogeneidad del medio geológico introduce en el proyecto de obra subterránea un alto grado de incertidumbre que debe ser debidamente gestionado a fin de reducir los riesgos asociados, que son fundamentalmente de tipo geotécnico. Entre los principales problemas a los que se enfrenta la Mecánica de Rocas moderna en el ámbito de la construcción subterránea, se encuentran la fluencia de roca en túneles (squeezing) y la rotura de pilares de carbón. Es ampliamente conocido que su aparición causa importantes perjuicios en el coste y la seguridad de los proyectos por lo que su estudio, ha estado tradicionalmente vinculado a la predicción de su ocurrencia. Entre las soluciones existentes para la determinación de estos problemas se encuentran las que se basan en métodos analíticos y numéricos. Estas metodologías son capaces de proporcionar un alto nivel de representatividad respecto del comportamiento geotécnico real, sin embargo, su utilización solo es posible cuando se dispone de una suficiente caracterización geotécnica y por tanto de una detallada definición de los parámetros que alimentan los complejos modelos constitutivos y criterios de rotura que los fenómenos estudiados requieren. Como es lógico, este nivel de definición solo es posible cuando se alcanzan etapas avanzadas de proyecto, incluso durante la propia construcción, a fin de calibrar adecuadamente los parámetros introducidos en los modelos, lo que supone una limitación de uso en etapas iniciales, cuando su predicción tiene verdadero sentido. Por su parte, los métodos empíricos permiten proporcionar soluciones a estos complejos problemas de un modo sencillo, con una baja parametrización y, dado su eminente enfoque observacional, de gran fiabilidad cuando se implementan sobre condiciones de contorno similares a las originales. La sencillez y escasez de los parámetros utilizados permiten a estas metodologías ser utilizadas desde las fases preliminares del proyecto, ya que estos constituyen en general, información habitual de fácil y económica adquisición. Este aspecto permite por tanto incorporar la predicción desde el principio del proceso de diseño, anticipando el riesgo en origen. En esta tesis doctoral, se presenta una nueva metodología empírica que sirve para proporcionar predicciones para la ocurrencia de squeezing y el fallo de pilares de carbón basada en una extensa recopilación de información de casos reales de túneles y minas en las que ambos fenómenos fueron evaluados. Esta información, recogida de referencias bibliográficas de prestigio, ha permitido recopilar una de las más extensas bases de datos existentes hasta la fecha relativa a estos fenómenos, lo que supone en sí mismo una importante contribución sobre el estado del arte. Con toda esta información, y con la ayuda de la teoría de clasificadores estadísticos, se ha implementado sobre las bases de datos un clasificador lineal de tipo regresión logística que permite hacer predicciones sobre la ocurrencia de ambos fenómenos en términos de probabilidad, y por tanto ponderar la incertidumbre asociada a la heterogeneidad incorporada por el medio geológico. Este aspecto del desarrollo es el verdadero valor añadido proporcionado por la tesis y la principal ventaja de la solución propuesta respecto de otras metodologías empíricas. Esta capacidad de ponderación probabilística permite al clasificador constituir una solución muy interesante como metodología para la evaluación de riesgo geotécnico y la toma de decisiones. De hecho, y como ejercicio de validación práctica, se ha implementado la solución desarrollada en un modelo coste-beneficio asociado a la optimización del diseño de pilares involucrados en una de mina “virtual” explotada por tajos largos. La capacidad del clasificador para cuantificar la probabilidad de fallo del diseño, junto con una adecuada cuantificación de las consecuencias de ese fallo, ha permitido definir una ley de riesgo que se ha incorporado al balance de costes y beneficios, que es capaz, a partir del redimensionamiento iterativo del sistema de pilares y de la propia configuración de la mina, maximizar el resultado económico del proyecto minero bajo unas condiciones de seguridad aceptables, fijadas de antemano. Geological media variability introduces to the subterranean project a high grade of uncertainty that should be properly managed with the aim to reduce the associated risks, which are mainly geotechnical. Among the major problems facing the modern Rock Mechanics in the field of underground construction are both, the rock squeezing while tunneling and the failure of coal pillars. Given their harmfulness to the cost and safety of the projects, their study has been traditionally linked to the determination of its occurrence. Among the existing solutions for the determination of these problems are those that are based on analytical and numerical methods. Those methodologies allow providing a high level of reliability of the geotechnical behavior, and therefore a detailed definition of the parameters that feed the complex constitutive models and failure criteria that require the studied phenomena. Obviously, this level of definition is only possible when advanced stages of the project are achieved and even during construction in order to properly calibrate the parameters entered in the models, which suppose a limited use in early stages, when the prediction has true sense. Meanwhile, empirical methods provide solutions to these complex problems in a simple way, with low parameterization and, given his observational scope, with highly reliability when implemented on similar conditions to the original context. The simplicity and scarcity of the parameters used allow these methodologies be applied in the early stages of the project, since that information should be commonly easy and cheaply to get. This aspect can therefore incorporate the prediction from the beginning of the design process, anticipating the risk beforehand. This thesis, based on the extensive data collection of case histories of tunnels and underground mines, presents a novel empirical approach used to provide predictions for the occurrence of both, squeezing and coal pillars failures. The information has been collected from prestigious references, providing one of the largest databases to date concerning phenomena, a fact which provides an important contribution to the state of the art. With all this information, and with the aid of the theory of statistical classifiers, it has been implemented on both databases, a type linear logistic regression classifier that allows predictions about the occurrence of these phenomena in terms of probability, and therefore weighting the uncertainty associated with geological variability. This aspect of the development is the real added value provided by the thesis and the main advantage of the proposed solution over other empirical methodologies. This probabilistic weighting capacity, allows being the classifier a very interesting methodology for the evaluation of geotechnical risk and decision making. In fact, in order to provide a practical validation, we have implemented the developed solution within a cost-benefit analysis associated with the optimization of the design of coal pillar systems involved in a "virtual" longwall mine. The ability of the classifier to quantify the probability of failure of the design along with proper quantification of the consequences of that failure, has allowed defining a risk law which is introduced into the cost-benefits model, which is able, from iterative resizing of the pillar system and the configuration of the mine, maximize the economic performance of the mining project under acceptable safety conditions established beforehand.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

- Towards a methodology for prospective deployment of ICT infrastructures - (Technologies & Architectures) - Key deployment parameters (network requirements) - User requirements - A proposal for Cost‐Benefit Analysis

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper groups recent supply chain management research focused on organizational design and its software support. The classification encompasses criteria related to research methodology and content. Empirical studies from management science focus on network types and organizational fit. Novel planning algorithms and innovative coordination schemes are developed mostly in the field of operations research in order to propose new software features. Operations and production management realize cost-benefit analysis of IT software implementations. The success of software solutions for network coordination depends strongly on the fit of three dimensions: network configuration, coordination scheme and software functionality. This paper concludes with proposals for future research on unaddressed issues within and among the identified research streams.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

There exist different ways for defining a welfare function. Traditionally, welfare economic theory foundation is based on the Net Present Value (NPV) calculation where the time dependent preferences of considered agents are taken into account. However, the time preferences, remains a controversial subject. Currently, the traditional approach employs a unique discount rate for various agents. Nevertheless, this way of discounting appears inconsistent with sustainable development. New research work suggests that the discount rate may not be a homogeneous value. The discount rates may change following the individual’s preferences. A significant body of evidence suggests that people do not behave following a constant discount rate. In fact, UK Government has quickly recognized the power of the arguments for time-varying rates, as it has done in its official guidance to Ministries on the appraisal of investments and policies. Other authors deal with not just time preference but with uncertainty about future income (precautionary saving). In a situation in which economic growth rates are similar across time periods, the rationale for declining social optimal discount rates is driven by the preferences of the individuals in the economy, rather than expectations of growth. However, these approaches have been mainly focused on long-term policies where intergenerational risks may appear. The traditional cost-benefit analysis (CBA) uses a unique discount rate derived from market interest rates or investment rates of return for discounting the costs and benefits of all social agents included in the CBA. However, recent literature showed that a more adequate measure of social benefit is possible by using different discount rates including inter-temporal preferences rate of users, private investment discount rate and intertemporal preferences rate of government. Actually, the costs of opportunity may differ amongst individuals, firms, governments, or society in general, as do the returns on savings. In general, the firms or operators require an investment rate linked to the current return on savings, while the discount rate of consumers-users depends on their time preferences with respect of the current and the future consumption, as well as society can take into account the intergenerational well-being, adopting a lower discount rate for today’s generation. Time discount rate of social actors (users, operators, government and society) places a lower value in a future gain, but the uncertainty about future income strongly determines the individual preferences. These time and uncertainty depends on preferences and should be integrated into a transport policy formulation that may have significant social impacts. The discount rate of a user cannot be the same than the operator’s discount rate. The preferences of both are different. In addition, another school of thought suggests that people, such as a social group, may have different attitudes towards future costs and benefits. Particularly, the users have different discount rates related to their income. Some research work tried to modify user discount rates using a compensating weight which represents the inverse of household income level. The inter-temporal preferences are a proxy of the willingness to pay during the time. Its consideration is important in order to make acceptable or not a policy or investment

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Los sistemas transaccionales tales como los programas informáticos para la planificación de recursos empresariales (ERP software) se han implementado ampliamente mientras que los sistemas analíticos para la gestión de la cadena de suministro (SCM software) no han tenido el éxito deseado por la industria de tecnología de información (TI). Aunque se documentan beneficios importantes derivados de las implantaciones de SCM software, las empresas industriales son reacias a invertir en este tipo de sistemas. Por una parte esto es debido a la falta de métodos que son capaces de detectar los beneficios por emplear esos sistemas, y por otra parte porque el coste asociado no está identificado, detallado y cuantificado suficientemente. Los esquemas de coordinación basados únicamente en sistemas ERP son alternativas válidas en la práctica industrial siempre que la relación coste-beneficio esta favorable. Por lo tanto, la evaluación de formas organizativas teniendo en cuenta explícitamente el coste debido a procesos administrativos, en particular por ciclos iterativos, es de gran interés para la toma de decisiones en el ámbito de inversiones en TI. Con el fin de cerrar la brecha, el propósito de esta investigación es proporcionar métodos de evaluación que permitan la comparación de diferentes formas de organización y niveles de soporte por sistemas informáticos. La tesis proporciona una amplia introducción, analizando los retos a los que se enfrenta la industria. Concluye con las necesidades de la industria de SCM software: unas herramientas que facilitan la evaluación integral de diferentes propuestas de organización. A continuación, la terminología clave se detalla centrándose en la teoría de la organización, las peculiaridades de inversión en TI y la tipología de software de gestión de la cadena de suministro. La revisión de la literatura clasifica las contribuciones recientes sobre la gestión de la cadena de suministro, tratando ambos conceptos, el diseño de la organización y su soporte por las TI. La clasificación incluye criterios relacionados con la metodología de la investigación y su contenido. Los estudios empíricos en el ámbito de la administración de empresas se centran en tipologías de redes industriales. Nuevos algoritmos de planificación y esquemas de coordinación innovadoras se desarrollan principalmente en el campo de la investigación de operaciones con el fin de proponer nuevas funciones de software. Artículos procedentes del área de la gestión de la producción se centran en el análisis de coste y beneficio de las implantaciones de sistemas. La revisión de la literatura revela que el éxito de las TI para la coordinación de redes industriales depende en gran medida de características de tres dimensiones: la configuración de la red industrial, los esquemas de coordinación y las funcionalidades del software. La literatura disponible está enfocada sobre todo en los beneficios de las implantaciones de SCM software. Sin embargo, la coordinación de la cadena de suministro, basándose en el sistema ERP, sigue siendo la práctica industrial generalizada, pero el coste de coordinación asociado no ha sido abordado por los investigadores. Los fundamentos de diseño organizativo eficiente se explican en detalle en la medida necesaria para la comprensión de la síntesis de las diferentes formas de organización. Se han generado varios esquemas de coordinación variando los siguientes parámetros de diseño: la estructura organizativa, los mecanismos de coordinación y el soporte por TI. Las diferentes propuestas de organización desarrolladas son evaluadas por un método heurístico y otro basado en la simulación por eventos discretos. Para ambos métodos, se tienen en cuenta los principios de la teoría de la organización. La falta de rendimiento empresarial se debe a las dependencias entre actividades que no se gestionan adecuadamente. Dentro del método heurístico, se clasifican las dependencias y se mide su intensidad basándose en factores contextuales. A continuación, se valora la idoneidad de cada elemento de diseño organizativo para cada dependencia específica. Por último, cada forma de organización se evalúa basándose en la contribución de los elementos de diseño tanto al beneficio como al coste. El beneficio de coordinación se refiere a la mejora en el rendimiento logístico - este concepto es el objeto central en la mayoría de modelos de evaluación de la gestión de la cadena de suministro. Por el contrario, el coste de coordinación que se debe incurrir para lograr beneficios no se suele considerar en detalle. Procesos iterativos son costosos si se ejecutan manualmente. Este es el caso cuando SCM software no está implementada y el sistema ERP es el único instrumento de coordinación disponible. El modelo heurístico proporciona un procedimiento simplificado para la clasificación sistemática de las dependencias, la cuantificación de los factores de influencia y la identificación de configuraciones que indican el uso de formas organizativas y de soporte de TI más o menos complejas. La simulación de eventos discretos se aplica en el segundo modelo de evaluación utilizando el paquete de software ‘Plant Simulation’. Con respecto al rendimiento logístico, por un lado se mide el coste de fabricación, de inventario y de transporte y las penalizaciones por pérdida de ventas. Por otro lado, se cuantifica explícitamente el coste de la coordinación teniendo en cuenta los ciclos de coordinación iterativos. El método se aplica a una configuración de cadena de suministro ejemplar considerando diversos parámetros. Los resultados de la simulación confirman que, en la mayoría de los casos, el beneficio aumenta cuando se intensifica la coordinación. Sin embargo, en ciertas situaciones en las que se aplican ciclos de planificación manuales e iterativos el coste de coordinación adicional no siempre conduce a mejor rendimiento logístico. Estos resultados inesperados no se pueden atribuir a ningún parámetro particular. La investigación confirma la gran importancia de nuevas dimensiones hasta ahora ignoradas en la evaluación de propuestas organizativas y herramientas de TI. A través del método heurístico se puede comparar de forma rápida, pero sólo aproximada, la eficiencia de diferentes formas de organización. Por el contrario, el método de simulación es más complejo pero da resultados más detallados, teniendo en cuenta parámetros específicos del contexto del caso concreto y del diseño organizativo. ABSTRACT Transactional systems such as Enterprise Resource Planning (ERP) systems have been implemented widely while analytical software like Supply Chain Management (SCM) add-ons are adopted less by manufacturing companies. Although significant benefits are reported stemming from SCM software implementations, companies are reluctant to invest in such systems. On the one hand this is due to the lack of methods that are able to detect benefits from the use of SCM software and on the other hand associated costs are not identified, detailed and quantified sufficiently. Coordination schemes based only on ERP systems are valid alternatives in industrial practice because significant investment in IT can be avoided. Therefore, the evaluation of these coordination procedures, in particular the cost due to iterations, is of high managerial interest and corresponding methods are comprehensive tools for strategic IT decision making. The purpose of this research is to provide evaluation methods that allow the comparison of different organizational forms and software support levels. The research begins with a comprehensive introduction dealing with the business environment that industrial networks are facing and concludes highlighting the challenges for the supply chain software industry. Afterwards, the central terminology is addressed, focusing on organization theory, IT investment peculiarities and supply chain management software typology. The literature review classifies recent supply chain management research referring to organizational design and its software support. The classification encompasses criteria related to research methodology and content. Empirical studies from management science focus on network types and organizational fit. Novel planning algorithms and innovative coordination schemes are developed mostly in the field of operations research in order to propose new software features. Operations and production management researchers realize cost-benefit analysis of IT software implementations. The literature review reveals that the success of software solutions for network coordination depends strongly on the fit of three dimensions: network configuration, coordination scheme and software functionality. Reviewed literature is mostly centered on the benefits of SCM software implementations. However, ERP system based supply chain coordination is still widespread industrial practice but the associated coordination cost has not been addressed by researchers. Fundamentals of efficient organizational design are explained in detail as far as required for the understanding of the synthesis of different organizational forms. Several coordination schemes have been shaped through the variation of the following design parameters: organizational structuring, coordination mechanisms and software support. The different organizational proposals are evaluated using a heuristic approach and a simulation-based method. For both cases, the principles of organization theory are respected. A lack of performance is due to dependencies between activities which are not managed properly. Therefore, within the heuristic method, dependencies are classified and their intensity is measured based on contextual factors. Afterwards the suitability of each organizational design element for the management of a specific dependency is determined. Finally, each organizational form is evaluated based on the contribution of the sum of design elements to coordination benefit and to coordination cost. Coordination benefit refers to improvement in logistic performance – this is the core concept of most supply chain evaluation models. Unfortunately, coordination cost which must be incurred to achieve benefits is usually not considered in detail. Iterative processes are costly when manually executed. This is the case when SCM software is not implemented and the ERP system is the only available coordination instrument. The heuristic model provides a simplified procedure for the classification of dependencies, quantification of influence factors and systematic search for adequate organizational forms and IT support. Discrete event simulation is applied in the second evaluation model using the software package ‘Plant Simulation’. On the one hand logistic performance is measured by manufacturing, inventory and transportation cost and penalties for lost sales. On the other hand coordination cost is explicitly considered taking into account iterative coordination cycles. The method is applied to an exemplary supply chain configuration considering various parameter settings. The simulation results confirm that, in most cases, benefit increases when coordination is intensified. However, in some situations when manual, iterative planning cycles are applied, additional coordination cost does not always lead to improved logistic performance. These unexpected results cannot be attributed to any particular parameter. The research confirms the great importance of up to now disregarded dimensions when evaluating SCM concepts and IT tools. The heuristic method provides a quick, but only approximate comparison of coordination efficiency for different organizational forms. In contrast, the more complex simulation method delivers detailed results taking into consideration specific parameter settings of network context and organizational design.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

El sector energético, en España en particular, y de forma similar en los principales países de Europa, cuenta con una significativa sobrecapacidad de generación, debido al rápido y significativo crecimiento de las energías renovables en los últimos diez años y la reducción de la demanda energética, como consecuencia de la crisis económica. Esta situación ha hecho que las centrales térmicas de generación de electricidad, y en concreto los ciclos combinados de gas, operen con un factor de utilización extremadamente bajo, del orden del 10%. Además de la reducción de ingresos, esto supone para las plantas trabajar continuamente fuera del punto de diseño, provocando una significativa pérdida de rendimiento y mayores costes de explotación. En este escenario, cualquier contribución que ayude a mejorar la eficiencia y la condición de los equipos, es positivamente considerada. La gestión de activos está ganando relevancia como un proceso multidisciplinar e integrado, tal y como refleja la reciente publicación de las normas ISO 55000:2014. Como proceso global e integrado, la gestión de activos requiere el manejo de diversos procesos y grandes volúmenes de información, incluso en tiempo real. Para ello es necesario utilizar tecnologías de la información y aplicaciones de software. Esta tesis desarrolla un concepto integrado de gestión de activos (Integrated Plant Management – IPM) aplicado a centrales de ciclo combinado y una metodología para estimar el beneficio aportado por el mismo. Debido a las incertidumbres asociadas a la estimación del beneficio, se ha optado por un análisis probabilístico coste-beneficio. Así mismo, el análisis cuantitativo se ha completado con una validación cualitativa del beneficio aportado por las tecnologías incorporadas al concepto de gestión integrada de activos, mediante una entrevista realizada a expertos del sector de generación de energía. Los resultados del análisis coste-beneficio son positivos, incluso en el desfavorable escenario con un factor de utilización de sólo el 10% y muy prometedores para factores de utilización por encima del 30%. ABSTRACT The energy sector particularly in Spain, and in a similar way in Europe, has a significant overcapacity due to the big growth of the renewable energies in the last ten years, and it is seriously affected by the demand decrease due to the economic crisis. That situation has forced the thermal plants and in particular, the combined cycles to operate with extremely low annual average capacity factors, very close to 10%. Apart from the incomes reduction, working in out-of-design conditions, means getting a worse performance and higher costs than expected. In this scenario, anything that can be done to improve the efficiency and the equipment condition is positively received. Asset Management, as a multidisciplinary and integrated process, is gaining prominence, reflected in the recent publication of the ISO 55000 series in 2014. Dealing Asset Management as a global, integrated process needs to manage several processes and significant volumes of information, also in real time, that requires information technologies and software applications to support it. This thesis proposes an integrated asset management concept (Integrated Plant Management-IPM) applied to combined cycle power plants and develops a methodology to assess the benefit that it can provide. Due to the difficulties in getting deterministic benefit estimation, a statistical approach has been adopted for the cot-benefit analysis. As well, the quantitative analysis has been completed with a qualitative validation of the technologies included in the IPM and their contribution to key power plant challenges by power generation sector experts. The cost- benefit analysis provides positive results even in the negative scenario of annual average capacity factor close to 10% and is promising for capacity factors over 30%.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Technological and environmental problems related to ore processing are a serious limitation for sustainable development of mineral resources, particularly for countries / companies rich in ores, but with little access to sophisticated technology, e.g. in Latin America. Digital image analysis (DIA) can provide a simple, unexpensive and broadly applicable methodology to assess these problems, but this methodology has to be carefully defined, to produce reproducible and relevant information.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

El presente trabajo propone un método para la determinación de los valores de las tolerancias individuales de las piezas que forman un conjunto ensamblado a partir de valores de tolerancias especificados en el conjunto final, optimizando el coste total de fabricación de las piezas individuales a partir de funciones de coste-tolerancia basadas en el proceso de fabricación de cada una de ellas. Para ello se parte de los principales trabajos desarrollados en la línea de asignación de tolerancias y se realiza la propuesta del modelo de trabajo, basado en la optimización de costes a partir de la aplicación del método de los multiplicadores de Lagrange a diversas curvas de coste-tolerancia