4 resultados para accounting system

em Universidad Politécnica de Madrid


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Choosing an appropriate accounting system for manufacturing has always been a challenge for managers. In this article we try to compare three accounting systems designed since 1980 to address problems of traditional accounting system. In the first place we are going to present a short overview on background and definition of three accounting systems: Activity Based costing, Time-Driven Activity Based Costing and Lean Accounting. Comparisons are made based on the three basic roles of information generated by accounting systems: financial reporting, decision making, and operational control and improvement. The analysis in this paper reveals how decisions are made over the value stream in the companies using Lean Accounting while decisions under the ABC Accounting system are taken at individual product level, and finally we will show how TD-ABC covers both product and process levels for decision making. In addition, this paper shows the importance of nonfinancial measures for operational control and improvement under the Lean Accounting and TD-ABC methods whereas ABC relies mostly on financial measures in this context.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The principal risks in the railway industry are mainly associated with collisions, derailments and level crossing accidents. An understanding of the nature of previous accidents on the railway network is required to identify potential causes and develop safety systems and deploy safety procedures. Risk assessment is a process for determining the risk magnitude to assist with decision-making. We propose a three-step methodology to predict the mean number of fatalities in railway accidents. The first is to predict the mean number of accidents by analyzing generalized linear models and selecting the one that best fits to the available historical data on the basis of goodness-offit statistics. The second is to compute the mean number of fatalities per accident and the third is to estimate the mean number of fatalities. The methodology is illustrated on the Spanish railway system. Statistical models accounting for annual and grouped data for the 1992-2009 time period have been analyzed. After identifying the models for broad and narrow gauges, we predicted mean number of accidents and the number of fatalities for the 2010-18 time period.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Bus rapid transit (BRT) systems are massive transport systems with medium/high capacity, high quality service and low infrastructure and operating costs. TransMilenio is Bogotá's most important mass transportation system and one of the biggest BRT systems in the world, although it only has completed its third construction phase out of a total of eight. In this paper we review the proposals in the literature to optimize BRT system operation, with a special emphasis on TransMilenio, and propose a mathematical model that adapts elements of the above proposals and incorporates novel elements accounting for the features of TransMilenio system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A multivariate analysis on flood variables is needed to design some hydraulic structures like dams, as the complexity of the routing process in a reservoir requires a representation of the full hydrograph. In this work, a bivariate copula model was used to obtain the bivariate joint distribution of flood peak and volume, in order to know the probability of occurrence of a given inflow hydrograph. However, the risk of dam overtopping is given by the maximum water elevation reached during the routing process, which depends on the hydrograph variables, the reservoir volume and the spillway crest length. Consequently, an additional bivariate return period, the so-called routed return period, was defined in terms of risk of dam overtopping based on this maximum water elevation obtained after routing the inflow hydrographs. The theoretical return periods, which give the probability of occurrence of a hydrograph prior to accounting for the reservoir routing, were compared with the routed return period, as in both cases hydrographs with the same probability will draw a curve in the peak-volume space. The procedure was applied to the case study of the Santillana reservoir in Spain. Different reservoir volumes and spillway lengths were considered to investigate the influence of the dam and reservoir characteristics on the results. The methodology improves the estimation of the Design Flood Hydrograph and can be applied to assess the risk of dam overtopping