Resumo:
An accurate characterization of the near-region propagation of radio waves inside tunnels is of practical importance for the design and planning of advanced communication systems. However, there has been no consensus yet on the propagation mechanism in this region. Some authors claim that the propagation mechanism follows the free space model, others intend to interpret it by the multi-mode waveguide model. This paper clarifies the situation in the near-region of arched tunnels by analytical modeling of the division point between the two propagation mechanisms. The procedure is based on the combination of the propagation theory and the three-dimensional solid geometry. Three groups of measurements are employed to verify the model in different tunnels at different frequencies. Furthermore, simplified models for the division point in five specific application situations are derived to facilitate the use of the model. The results in this paper could help to deepen the insight into the propagation mechanism within tunnel environments.
Resumo:
Communications Based Train Control Systems require high quality radio data communications for train signaling and control. Actually most of these systems use 2.4GHz band with proprietary radio transceivers and leaky feeder as distribution system. All them demand a high QoS radio network to improve the efficiency of railway networks. We present narrow band, broad band and data correlated measurements taken in Madrid underground with a transmission system at 2.4 GHz in a test network of 2 km length in subway tunnels. The architecture proposed has a strong overlap in between cells to improve reliability and QoS. The radio planning of the network is carefully described and modeled with narrow band and broadband measurements and statistics. The result is a network with 99.7% of packets transmitted correctly and average propagation delay of 20ms. These results fulfill the specifications QoS of CBTC systems.
Resumo:
There is no unanimous consensus yet on the propagation mechanism before the break point inside tunnels. Some deem that the propagation mechanism follows the free space model, others argue that it should be described by the multimode waveguide model. Firstly, this paper analyzes the propagation loss in two mechanisms. Then, by conjunctively using the propagation theory and the three-dimensional solid geometry, a generic analytical model for the boundary between the free space mechanism and the multi-mode waveguide mechanism inside tunnels has been presented. Three measurement campaigns validate the model in different tunnels at different frequencies. Furthermore, the condition of the validity of the free space model used in tunnel environment has been discussed in some specific situations. Finally, through mathematical derivation, the seemingly conflicting viewpoints on the free space mechanism and the multi-mode waveguide mechanism have been unified in some specific situations by the presented generic model. The results in this paper can be helpful to gain deeper insight and better understanding of the propagation mechanism inside tunnels
Resumo:
The delay caused by the reflected ray in broadband communication has a great influence on the communications in subway tunnel. This paper presents measurements taken in subway tunnels at 2.4 GHz, with 5 MHz bandwidth. According to propagation characteristics of tunnel, the measurements were carried out with a frequency domain channel sounding technique, in three typical scenarios: line of sight (LOS), Non-line-of-sight (NLOS) and far line of sight (FLOS), which lead to different delay distributions. Firstly IFFT was chosen to get channel impulse response (CIR) h(t) from measured three-dimensional transfer functions. Power delay profile (PDP) was investigated to give an overview of broadband channel model. Thereafter, a long delay caused by the obturation of tunnel is observed and investigated in all the scenarios. The measurements show that the reflection can be greatly remained by the tunnel, which leads to long delay cluster where the reflection, but direct ray, makes the main contribution for radio wave propagation. Four important parameters: distribution of whole PDP power, first peak arriving time, reflection cluster duration and PDP power distribution of reflection cluster were studied to give a detailed description of long delay characteristic in tunnel. This can be used to ensure high capacity communication in tunnels
Resumo:
Artículo sobre comunicaciones ferroviarias. Abstract: Along with the increase in operating frequencies in advanced radio communication systems utilised inside tunnels, the location of the break point is further and further away from the transmitter. This means that the near region lengthens considerably and even occupies the whole propagation cell or the entire length of some short tunnels. To begin with, this study analyses the propagation loss resulting from the free-space mechanism and the multi-mode waveguide mechanism in the near region of circular tunnels, respectively. Then, by conjunctive employing the propagation theory and the three-dimensional solid geometry, a general analytical model of the dividing point between two propagation mechanisms is presented for the first time. Moreover, the model is validated by a wide range of measurement campaigns in different tunnels at different frequencies. Finally, discussions on the simplified formulae of the dividing point in some application situations are made. The results in this study can be helpful to grasp the essence of the propagation mechanism inside tunnels.
Resumo:
Along with the increase of the use of working frequencies in advanced radio communication systems, the near-region inside tunnels lengthens considerably and even occupies the whole propagation cell or the entire length of some short tunnels. This paper analytically models the propagation mechanisms and their dividing point in the near-region of arbitrary cross-sectional tunnels for the first time. To begin with, the propagation losses owing to the free space mechanism and the multimode waveguide mechanism are modeled, respectively. Then, by conjunctively employing the propagation theory and the three-dimensional solid geometry, the paper presents a general model for the dividing point between two propagation mechanisms. It is worthy to mention that this model can be applied in arbitrary cross-sectional tunnels. Furthermore, the general dividing point model is specified in rectangular, circular, and arched tunnels, respectively. Five groups of measurements are used to justify the model in different tunnels at different frequencies. Finally, in order to facilitate the use of the model, simplified analytical solutions for the dividing point in five specific application situations are derived. The results in this paper could help deepen the insight into the propagation mechanisms in tunnels.
Resumo:
Ya en el informe acerca del estado de la tecnología en la excavación profunda y en la construcción de túneles en terreno duro presentado en la 7ª Conferencia en Mecánica de Suelos e Ingeniería de la Cimentación, Peck (1969) introdujo los tres temas a ser tenidos en cuenta para el diseño de túneles en terrenos blandos: o Estabilidad de la cavidad durante la construcción, con particular atención a la estabilidad del frente del túnel; o Evaluación de los movimientos del terreno inducidos por la construcción del túnel y de la incidencia de los trabajos subterráneos a poca profundidad sobre los asentamientos en superficie; o Diseño del sistema de sostenimiento del túnel a instalar para asegurar la estabilidad de la estructura a corto y largo plazo. Esta Tesis se centra en los problemas señalados en el segundo de los puntos, analizando distintas soluciones habitualmente proyectadas para reducir los movimientos inducidos por la excavación de los túneles. El objeto de la Tesis es el análisis de la influencia de distintos diseños de paraguas de micropilotes, pantalla de micropilotes, paraguas de jet grouting y pantallas de jet grouting en los asientos en superficie durante la ejecución de túneles ejecutados a poca profundidad, con objeto de buscar el diseño que optimice los medios empleados para una determinada reducción de asientos. Para ello se establecen unas premisas para los proyectistas con objeto de conocer a priori cuales son los tratamientos más eficientes (de los propuestos en la Tesis) para la reducción de asientos en superficie cuando se ha de proyectar un túnel, de tal manera que pueda tener datos cualitativos y algunos cuantitativos sobre los diseños más óptimos, utilizando para ello un programa de elementos finitos de última generación que permite realizara la simulación tensodeformación del terreno mediante el modelo de suelo con endurecimiento (Hardening Soil Small model), que es una variante elastoplástica del modelo hiperbólico, similar al Hardening Soil Model. Además, este modelo incorpora una relación entre deformación y el modulo de rigidez, simulando el diferente comportamiento del suelo para pequeñas deformaciones (por ejemplo vibraciones con deformaciones por debajo de 10-5 y grandes deformaciones (deformaciones > 10-3). Para la realización de la Tesis se han elegido cinco secciones de túnel, dos correspondiente a secciones tipo de túnel ejecutado con tuneladora y tres secciones ejecutados mediante convencionales (dos correspondientes a secciones que han utilizado el método Belga y una que ha utilizado el NATM). Para conseguir los objetivos marcados, primeramente se ha analizado mediante una correlación entre modelos tridimensionales y bidimensionales el valor de relajación usado en estos últimos, y ver su variación al cambio de parámetros como la sección del túnel, la cobertera, el procedimiento constructivo, longitud de pase (métodos convencionales) o presión del frente (tuneladora) y las características geotécnicas de los materiales donde se ejecuta el túnel. Posteriormente se ha analizado que diseño de pantalla de protección tiene mejor eficacia respecto a la reducción de asientos, variando distintos parámetros de las características de la misma, como son el empotramiento, el tipo de micropilotes o pilote, la influencia del arriostramiento de las pantallas de protección en cabeza, la inclinación de la pantalla, la separación de la pantalla al eje del túnel y la disposición en doble fila de la pantalla de pantalla proyectada. Para finalizar el estudio de la efectividad de pantalla de protección para la reducción de asiento, se estudiará la influencia de la sobrecarga cercanas (simulación de edificios) tiene en la efectividad de la pantalla proyectada (desde el punto de vista de reducción de movimientos en superficie). Con objeto de poder comparar la efectividad de la pantalla de micropilotes respecto a la ejecución de un paraguas de micropilotes se ha analizado distintos diseños de paraguas, comparando el movimiento obtenido con el obtenido para el caso de pantalla de micropilotes, comparando ambos resultados con los medidos en obras ya ejecutadas. En otro apartado se ha realizado una comparación entre tratamientos similar, comparándolos en este caso con un paraguas de jet grouting y pantallas de jet grouting. Los resultados obtenidos se han con valores de asientos medidos en distintas obras ya ejecutadas y cuyas secciones se corresponden a los empleados en los modelos numéricos. Since the report on the state of technology in deep excavation and tunnelling in hard ground presented at the 7th Conference on Soil Mechanics and Foundation Engineering, Peck (1969) introduced the three issues to be taken into account for the design of tunnels in soft ground: o Cavity Stability during construction, with particular attention to the stability of the tunnel face; o Evaluation of ground movements induced by tunnelling and the effect of shallow underground workings on surface settlement; o Design of the tunnel support system to be installed to ensure short and long term stability of the structure. This thesis focuses on the issues identified in the second point, usually analysing different solutions designed to reduce the movements induced by tunnelling. The aim of the thesis is to analyse the influence of different micropile forepole umbrellas, micropile walls, jet grouting umbrellas and jet grouting wall designs on surface settlements during near surface tunnelling in order to use the most optimal technique to achieve a determined reduction in settlement. This will establish some criteria for designers to know a priori which methods are most effective (of those proposed in the thesis) to reduce surface settlements in tunnel design, so that it is possible to have qualitative and some quantitative data on the optimal designs, using the latest finite element modelling software that allows simulation of the ground’s infinitesimal strain behaviour using the Hardening Soil Small Model, which is a variation on the elasto-plastic hyperbolic model, similar to Hardening Soil model. In addition, this model incorporates a relationship between strain and the rigidity modulus, simulating different soil behaviour for small deformations (eg deformation vibrations below 10-5 and large deformations (deformations > 10-3). For the purpose of this thesis five tunnel sections have been chosen, two sections corresponding to TBM tunnels and three sections undertaken by conventional means (two sections corresponding to the Belgian method and one corresponding to the NATM). To achieve the objectives outlined, a correlation analysis of the relaxation values used in the 2D and 3D models was undertaken to verify them against parameters such as the tunnel cross-section, the depth of the tunnel, the construction method, the length of step (conventional method) or face pressure (TBM) and the geotechnical characteristics of the ground where the tunnel is constructed. Following this, the diaphragm wall design with the greatest efficiency regarding settlement reduction was analysed, varying parameters such as the toe depth, type of micropiles or piles, the influence of bracing of the head protection diaphragm walls, the inclination of the diaphragm wall, the separation between the diaphragm wall and the tunnel axis and the double diaphragm wall design arrangement. In order to complete the study into the effectiveness of protective diaphragm walls ofn the reduction of settlements, the influence of nearby imposed loads (simulating buildings) on the effectiveness of the designed diaphragm walls (from the point of view of reducing surface movements) will be studied. In order to compare the effectiveness of micropile diaphragm walls regarding the installation of micropile forepole umbrellas, different designs of these forepole umbrellas have been analysed comparing the movement obtained with that obtained for micropiled diaphragm walls, comparing both results with those measured from similar completed projects. In another section, a comparison between similar treatments has been completed, comparing the treatments with a forepole umbrella by jet grouting and jet grouting walls. The results obtained compared with settlement values measured in various projects already completed and whose sections correspond to those used in the numerical models.
Resumo:
This paper describes an interactive set of tools used to determine the safety of tunnels and to provide data for the decision making of its mainteinance. Although, no doubt, there are still several drawbacks in the difficult procedures in use it is clear that the way is promising and future improvements both in experimental and analytical methods will increase our understanding of this matter.
Resumo:
A pressure wave is generated when a high speed train enters a tunnel. This wave travels along the tunnel back and forth, and is reflected at the irregularities of the tunnel duct (section changes, chimneys and tunnel ends). The pressure changes are associated to these waves can have an effect on passengers if the trains are not suitably sealed or pressurized. The intensity of the waves depends mainly on the train speed, and on the blockage ratio (train-section-to- tunnel-section area ratio). As the intensity of the waves is limited by regulations, and also by the effects on passengers and infrastructures, the sizing of the tunnel section area is largely influenced by the maximum train speed allowed in the tunnel. The aim of this study is to analyse the increase in cost in a tunnel due to the existence of this difference in ground level, and evaluate the increase of construction costs that this elevation might involve.
Resumo:
The main objective of ventilation systems in case of fire is the reduction of the possible consequences by achieving the best possible conditions for the evacuation of the users and the intervention of the emergency services. The required immediate transition, from normal to emergency functioning of the ventilation equipments, is being strengthened by the use of automatic and semi-automatic control systems, what reduces the response times through the help to the operators, and the use of pre-defined strategies. A further step consists on the use of closed-loop algorithms, which takes into account not only the initial conditions but their development (air velocity, traffic situation, etc.), optimizing smoke control capacity.
Resumo:
In tunnel construction, as in every engineering work, it is usual the decision making, with incomplete data. Nevertheless, consciously or not, the builder weighs the risks (even if this is done subjectively) so that he can offer a cost. The objective of this paper is to recall the existence of a methodology to treat the uncertainties in the data so that it is possible to see their effect on the output of the computational model used and then to estimate the failure probability or the safety margin of a structure. In this scheme it is possible to include the subjective knowledge on the statistical properties of the random variables and, using a numerical model consistent with the degree of complexity appropiate to the problem at hand, to make rationally based decisions. As will be shown with the method it is possible to quantify the relative importance of the random variables and, in addition, it can be used, under certain conditions, to solve the inverse problem. It is then a method very well suited both to the project and to the control phases of tunnel construction.
Resumo:
RESUMEN: La realización de túneles de gran longitud para ferrocarriles ha adquirido un gran auge en los últimos años. En España se han abordado proyectos de estas características, no existiendo para su ejecución una metodología completa y contrastada de actuación. Las características geométricas, de observación y de trabajo en túneles hace que las metodologías que se aplican en otros proyectos de ingeniería no sean aplicables por las siguientes causas: separación de las redes exteriores e interiores de los túneles debido a la diferente naturaleza de los observables, geometría en el interior siempre desfavorable a los requerimientos de observación clásica, mala visibilidad dentro del túnel, aumento de errores conforme avanza la perforación, y movimientos propios del túnel durante su ejecución por la propia geodinámica activa. Los patrones de observación geodésica usados deben revisarse cuando se ejecutan túneles de gran longitud. Este trabajo establece una metodología para el diseño de redes exteriores. ABSTRACT: The realization of long railway tunnels has acquired a great interest in recent years. In Spain it is necessary to address projects of this nature, but ther is no corresponding methodological framework supporting them. The tunnel observational and working geometrical properties, make that former methodologies used may be unuseful in this case: the observation of the exterior and interior geodetical networks of the tunnel is different in nature. Conditions of visibility in the interior of the tunnels, regardless of the geometry, are not the most advantageous for observation due to the production system and the natural conditions of the tunnels. Errors increase as the drilling of the tunnel progresses, as it becomes problematical to perform continuous verifications along the itinerary itself. Moreover, inherent tunnel movements due to active geodynamics must also be considered. Therefore patterns for geodetic and topographic observations have to be reviewed when very long tunnels are constructed.
Resumo:
The work presented in this article is focused on the RF measurement campaign carried out in several subway tunnels in Metro Madrid (Spain). Most common segments such as straight lines, curves and passing through station as well as other unique scenarios in metropolitan lines were the selected locations during this campaign. Measurements were conducted in tunnels of diverse cross section shapes and taken at three frequency bands: 900 MHz, 2.4GHz and 5.7 GHz for both horizontal and vertical polarization.
Resumo:
A genetic algorithm (GA) is employed for the multi-objective shape optimization of the nose of a high-speed train. Aerodynamic problems observed at high speeds become still more relevant when traveling along a tunnel. The objective is to minimize both the aerodynamic drag and the amplitude of the pressure gradient of the compression wave when a train enters a tunnel. The main drawback of GA is the large number of evaluations need in the optimization process. Metamodels-based optimization is considered to overcome such problem. As a result, an explicit relationship between pressure gradient and geometrical parameters is obtained.
Resumo:
Between 2003 and 2007 an urban network or road tunnels with a total constructed tubes length of 45 km was built in the city of Madrid. This amazing engineering work, known as "Calle 30 Project" counted with different kinds of tunnel typologies and ventilation systems. Due to the length of the tunnels and the impact of the work itself, the tunnels were endowed with a great variety of installations to provide the maximum levels of safety both for users and the infrastructure includieng, in some parts of the tunnel, fixed fire fighting system based on water mist. Whithin this framework a large-scale programme of fire tests was planned to study different aspects related to fire safety in the tunnels including the phenomena of the interaction between ventilation and extinguishing system. In addition, these large scale fire tests allowed fire brigades of the city of Madrid an opportunity to define operational procedures for specific fire fighting in tunnels and evaluate the possibilities of fixed fire fighting systems. The tests were carried out in the Center of Experimentation "San pedro of Anes" which includes a 600 m tunnel with a removable false ceiling for reproducing different ceiling heights and ventilation conditions (transverse and longitudinal ones). Interesting conclusions on the interaction of ventilation and water mist systems were obtained but also on other aspects including performance of water mist system in terms of reduction of gas temperatures or visibility conditions. This paper presents a description of the test's programme carried out and some previous results obtained.