14 resultados para Three Gorges Project

em Universidad Politécnica de Madrid


Relevância:

80.00% 80.00%

Publicador:

Resumo:

As a fundamental contribution to limiting the increase of debris in the Space environment, a three-year project started on 1 November 2010 financed by the European Commission under the FP-7 Space Programme. It aims at developing a universal system to be carried on board future satellites launched into low Earth orbit (LEO), to allow de-orbiting at end of life. The operational system involves a conductive tape-tether left bare of insulation to establish anodic contact with the ambient plasma as a giant Langmuir probe. The project will size the three disparate dimensions of a tape for a selected de-orbit mission and determine scaling laws to allow system design for a general mission. It will implement control laws to restrain tether dynamics in/off the orbital plane; and will carry out plasma chamber measurements and numerical simulations of tether-plasma interaction. The project also involves the design and manufacturing of subsystems: electron-ejecting plasma contactors, an electric control and power module, interface elements, tether and deployment mechanisms, tether tape/end-mass as well as current collection plus free-fall, and hypervelocity impact tests.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

BETs is a three-year project financed by the Space Program of the European Commission, aimed at developing an efficient deorbit system that could be carried on board any future satellite launched into Low Earth Orbit (LEO). The operational system involves a conductive tape-tether left bare to establish anodic contact with the ambient plasma as a giant Langmuir probe. As a part of this project, we are carrying out both numerical and experimental approaches to estimate the collected current by the positive part of the tether. This paper deals with experimental measurements performed in the IONospheric Atmosphere Simulator (JONAS) plasma chamber of the Onera-Space Environment Department. The JONAS facility is a 9- m3 vacuum chamber equipped with a plasma source providing drifting plasma simulating LEO conditions in terms of density and temperature. A thin metallic cylinder, simulating the tether, is set inside the chamber and polarized up to 1000 V. The Earth's magnetic field is neutralized inside the chamber. In a first time, tether collected current versus tether polarization is measured for different plasma source energies and densities. In complement, several types of Langmuir probes are used at the same location to allow the extraction of both ion densities and electron parameters by computer modeling (classical Langmuir probe characteristics are not accurate enough in the present situation). These two measurements permit estimation of the discrepancies between the theoretical collection laws, orbital motion limited law in particular, and the experimental data in LEO-like conditions without magnetic fields. In a second time, the spatial variations and the time evolutions of the plasma properties around the tether are investigated. Spherical and emissive Langmuir probes are also used for a more extensive characterization of the plasma in space and time dependent analysis. Results show the ion depletion because of the wake effect and the accumulation of- ions upstream of the tether. In some regimes (at large positive potential), oscillations are observed on the tether collected current and on Langmuir probe collected current in specific sites.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

El legado de una época, una situación social y unos criterios arquitectónicos, aparecen recogidos en el conjunto de edificios y en la trama urbana, de los pueblos de colonización de La Bazana y Valuengo (Jerez de los Caballeros, Badajoz, 1954), proyectados por Alejandro de la Sota durante la etapa en la que trabajó de forma externa para el Instituto Nacional de Colonización (INC). Al inicio de esta investigación no se habían realizado análisis en profundidad ni valoraciones críticas de su arquitectura, ni eran objeto de estudio en los ambientes universitarios, siendo prácticamente desconocidos para el conjunto de la profesión, que solía tomar como referencia de esta etapa de la arquitectura de Alejandro de la Sota para el INC, el poblado de Esquivel, en Sevilla, profusamente publicitado. Aunque en los últimos tiempos se han elaborado tesis en las Escuelas de Arquitectura abordando el tema de la colonización agraria en España en la década de los 50, los poblados de colonización en Extremadura o la arquitectura de Alejandro de la Sota para el INC, la presente tesis se aleja de la visión global unificadora o biográfica, para centrarse en el estudio monográfico de un objeto arquitectónico singular. El trabajo pretende documentar, estudiar, analizar y poner en valor, estas obras enclavadas en la arquitectura española de la década de los 50, denominados por su propio autor como “pueblos todo de plazas”, donde la arquitectura surge como respuesta a una realidad territorial, social y cultural, y a unas estrictas imposiciones prefijadas, que se resuelven teniendo como punto de partida las condiciones materiales y culturales del lugar en el que se ubican, para concluir planteando interpretaciones y lecturas que incorporan la tradición, pero que trascienden a ella. La metodología empleada consiste en un trabajo de documentación y análisis del objeto arquitectónico en tres fases: proyecto, obra construida y estado actual. En cada una de las fases se realiza un trabajo de campo consistente en la recopilación de la documentación original y en la elaboración de una nueva documentación gráfica, en base a los estudios y análisis realizados. El cotejo entre los datos obtenidos de los proyectos, las obras inicialmente construidas y el estado actual, darán como resultado un material de análisis inédito, que junto con la bibliografía incluida en el trabajo y los anexos que contienen la documentación original recabada sobre las obras en los organismos e instituciones que la custodian, ofrecen una interpretación más precisa de la realidad arquitectónica de estos pueblos, dejando el estudio abierto a nuevas vías de investigación que profundicen en la hipótesis del espacio vacío como organizador y colonizador del paisaje. ABSTRACT The legacy of an age, a social situation and a group of architectural criteria, appears reflected in the group of buildings and the urban design of colonization villages La Bazana and Valuengo (Jerez de los Caballeros, Badajoz, 1954), designed by Alejandro de la Sota during the time that he was working externally to the National Institute of Colonization(INC). At the beginning of this investigation they had not been analyzed or critically evaluated in depth and not even were being studied in university circles and for this reason were practically unknown to the profession, who used as a reference of this architecture period of Alejandro de la Sota for the INC, the colonization village of Esquivel in Seville, widely publicized. Although recently some doctoral thesis have been elaborated in the Architecture Schools about the topic of rural colonization in Spain in the 50s, the colonization villages in Extremadura or the architecture by Alejandro de la Sota for the INC, this thesis wants to get away from unifying or biographical overview, in order to centre the study about a singular architectural object. The work expects to document, study, analyze and push the value of this architectural pieces nestled in the Spanish architecture of 50s,and that were named by their author as “squares-villages”, where the architecture appears like answer to a territorial, social and culture reality, and a strict program impositions by the INC, which are solved by the architect taking as a starting point the material and cultural conditions from the place where are situated, to conclude with a interpretations and readings which incorporate the tradition and transcend it. The methodology used consists in documenting and analyzing work about the architectonic object in three stages: project, building and present state. In every stage, we make a field work in order to compile the original documents and at the same time a new graphical documentation is developed with the studies and analysis that were made before. The information about the projects, the architecture built at the beginning of the process, and the current state were compared and achieved an unpublished material which together with the bibliography and original documents, collected in the organizations and institutions that guard them, offer a more accurate interpretation about the architectural reality of these villages, leaving the study open for a new research which could go into detail about the hypothesis of urban empty space as element for colonize and organize the landscape.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper reports a learning experience related to the acquisition of project management competences. Students from three different universities and backgrounds, cooperate in a common project that drives the learning-teaching process. Previous related works on this initiative have already evaluated the goodness of this multidisciplinary, project-based learning approach in the context of a new educative paradigm. Yet the innovative experience has allowed the authors to define a rubric in order to measure specific competences in project management. The study shows the rubric’s main aspects as well as competence acquisition evaluation alternatives, based in the metrics defined. Key indicators and specific reports obtained from data base fields in the web tool will support this work. As a result, new competences can be assessed, such ones like teamwork, problem solving, communication and leadership. Final goal is to provide an overall competence map to the students at the same time they improve their skills.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This work presents an educational formal initiative aimed to monitor the acquisition and strengthening of competences by students that are being taught in project management subject. Groups of students belonging to three universities, embracing different knowledge areas such as engineering, biology, etc., were selected to run the experience. All of them had nevertheless a common and basic starting point: inexperience in project management field. In this scenario, we propose a new theoretical and practical approach oriented to reinforce problem-solving and related competences in a project management subject context. For this purpose, a Project-Based Learning (PjBL) initiative has been specifically designed and developed. The main idea is to bring a real world engineering project management case into the classroom, where students must face up to a completely new learning approach –groups in different locations, collaborative mode and unspecific solution, supported by a powerful internet platform:.project.net (http://www.Project.net). Other relevant aspects such as project climate, knowledge increasing, have also been monitored during the course. Results show and overall improvement in key competences. The obtained information will be used in two ways: to feed the students back about personal opportunities for improvement in specific competences, and to fine-tune the experience for further initiatives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Nowadays, PBL is considered a suitable methodology for engineering education. But making the most of this methodology requires some features, such as multidisciplinary, illstructured teamwork and autonomous research that sometimes are not easy to achieve. In fact, traditional university systems, including curricula, teaching methodologies, assessment and regulation, do not help the implementation of these features. Firstly, we look through the main differences found between a traditional system and the Aalborg model, considered a reference point in PBL. Then, this work is aimed at detecting the main obstacles that a standing traditional system presents to PBL implementation. A multifaceted PBL experience, covering three different disciplines, brings us to analyse these difficulties, order them according to its importance and decide which should be the first changes. Finally, we propose a straightforward introduction of generic competences in the curricula aimed at supporting the use of Problem-Based Project-Organized Learning

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this paper, we describe the successful results of an international research project focused on the use of Web technology in the educational context. The article explains how this international project, funded by public organizations and developed over the last two academic years, focuses on the area of open educational resources (OER) and particularly the educational content of the OpenCourseWare (OCW) model. This initiative has been developed by a research group composed of researchers from three countries. The project was enabled by the Universidad Politécnica de Madrid OCW Office�s leadership of the Consortium of Latin American Universities and the distance education know-how of the Universidad Técnica Particular de Loja (UTPL, Ecuador). We give a full account of the project, methodology, main outcomes and validation. The project results have further consolidated the group, and increased the maturity of group members and networking with other groups in the area. The group is now participating in other research projects that continue the lines developed here

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This document presents an innovative, formal educational initiative that is aimed at enhancing the development of engineering students’ specific competences when studying Project Management (PM) subject. The framework of the experience combines (1) theoretical concepts, (2) the development of a real-case project carried out by multidisciplinary groups of three different universities, (3) the use of software web 2.0 tools and (4) group and individual assignments of students that play different roles (project managers and team members). Under this scenario, the study focuses on monitoring the communication competence in the ever growing PM virtual environment. Factors such as corporal language, technical means, stage, and PM specific vocabulary among others have been considered in order to assess the students’ performance on this issue. As a main contribution, the paper introduces an ad-hoc rubric that, based on previous investigations, has been adapted and tested for the first time to this new and specific context. Additionally, the research conducted has provided some interesting findings that suggest further actions to improve and better define future rubrics, oriented to communication or even other competences. As specific PM subject concerns, it has been detected that students playing the role of Project Managers strengthen their competences more than those ones that play the role of Team Members. It has also been detected that students have more difficulty assimilating concepts related to risk and quality management. However those concepts related with scope, time or cost areas of knowledge have been better assimilated by the students.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Within the subproject 3 of the NURISP project three neutron kinetic codes have been implemented into the NURESIM platform. For all three codes (CRONOS2, COBAYA3 and DYN3D) the coupling with the thermal hydraulic code FLICA4 was accomplished using the features of the NURESIM platform. This paper contains the results obtained with COBAYA3/FLICA4 coupled codes for the PWR boron dilution benchmark defined within the sub project 3 of the NURISP project. Results are provided for all the scenarios.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Is this a Mies?s project? Disappearances, or the art of being a Mies project Angel Borrego Several years ago I had to solve the structure of Mies House of the Werkbund exhibition of 1931 as an exercise for a course named Structures Projects in the School of Architecture of Madrid. We were offered this house as an exercise because there had been some complaints about having to calculate and deal with ?bad, real, anonymous? architecture widely recognized as such, in so far as it has been widely published, that furthermore had some ideal quality to it, a quality reinforced by the fact that it was not there anymore, one could not go and see it, old and deteriorated, all images we have of it are of a shiny new object: in fact its ideal quality was even present in that it had not even been designed to be a completely real house, as nobody ever lived there and wasn?t supposed to. It was a three dimensional representation of a house, what gave it a further flair of ideality. And it was as well the representation of an idea, and we all liked that. Last but not least, it had Mies to back it up, which promised us the remote possibility of analyzing one of his works in depth, with proper tools (this was a structures course, and we had already read, or heard, something about the importance of structures in Mies?s work.) We were lured by the possibility of reconstructing, if not the pavilion, some of the ideas leading to it. Ideas that were themselves structural, like the ?perfectly regular all columnar structure?, an ideal structure. We had a sensation that we could somehow reproduce the process and thoughts of Mies leading to the solution of a particular work, investigate him in a cuasi archaeological manner, reconstruct the project, as if being able to reconstruct one work we could reconstruct the entire Mies, and placing ourselves in his position replace him, which was to know for once where we were (1). All these thoughts, passed through our minds more or less abstractly, believe it or not, before we realized that we were supposed to imagine that the roof was also supported by the walls and that the plan was lacking two columns, which was short. We could not believe that only to make the exercise more difficult, as it was admitted, the professors would mutilate a Mies work in such a way. The exercise had lost all interest to us and there were some timid protests. The surprise came when, though admitting that the supporting walls had been their idea, the professors said they had not manipulated the plan of the house at all. Some confusion followed, since that seemed quite incredible to us, even more to professors I guess. Two of us went to the library and checkout two books, one being the ?History of Modern Architecture? (the Benevolo as it was known), from where they said to have copied the plan of the house for the exercise, and another book on Mies that included the same project. The Benevolo was actually lacking the two columns, but the other book included them, making clear our point. We were able to reorient the exercise and calculate the house just as Mies had designed it. We, the students I mean, were really happy, since we had a voice in the discipline of architecture: our own discipline since we were the ones being disciplined, and we had been allowed to freely talk our way through it. I had the nice sensation that what happened was curiously and rewardingly similar to, or a kind of metaphor for, the flowing space of the free plan, that was allowed to move through the perfectly regular structure, a most disciplined structure. As Mark Wigley has noted, discipline is intimately related to prothesis. The concept of prothesis (pro-thesis) would be already architectural as ?the act of placing before?, referring to a structure that has to be placed before anything else; it is already a structure, rather than being something added that could be removed..

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Abstract The development of cognitive robots needs a strong “sensorial” support which should allow it to perceive the real world for interacting with it properly. Therefore the development of efficient visual-processing software to be equipped in effective artificial agents is a must. In this project we study and develop a visual-processing software that will work as the “eyes” of a cognitive robot. This software performs a three-dimensional mapping of the robot’s environment, providing it with the essential information required to make proper decisions during its navigation. Due to the complexity of this objective we have adopted the Scrum methodology in order to achieve an agile development process, which has allowed us to correct and improve in a fast way the successive versions of the product. The present project is structured in Sprints, which cover the different stages of the software development based on the requirements imposed by the robot and its real necessities. We have initially explored different commercial devices oriented to the acquisition of the required visual information, adopting the Kinect Sensor camera (Microsoft) as the most suitable option. Later on, we have studied the available software to manage the obtained visual information as well as its integration with the robot’s software, choosing the high-level platform Matlab as the common nexus to join the management of the camera, the management of the robot and the implementation of the behavioral algorithms. During the last stages the software has been developed to include the fundamental functionalities required to process the real environment, such as depth representation, segmentation, and clustering. Finally the software has been optimized to exhibit real-time processing and a suitable performance to fulfill the robot’s requirements during its operation in real situations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

En el campo de la fusión nuclear y desarrollándose en paralelo a ITER (International Thermonuclear Experimental Reactor), el proyecto IFMIF (International Fusion Material Irradiation Facility) se enmarca dentro de las actividades complementarias encaminadas a solucionar las barreras tecnológicas que aún plantea la fusión. En concreto IFMIF es una instalación de irradiación cuya misión es caracterizar materiales resistentes a condiciones extremas como las esperadas en los futuros reactores de fusión como DEMO (DEMOnstration power plant). Consiste de dos aceleradores de deuterones que proporcionan un haz de 125 mA y 40 MeV cada uno, que al colisionar con un blanco de litio producen un flujo neutrónico intenso (1017 neutrones/s) con un espectro similar al de los neutrones de fusión [1], [2]. Dicho flujo neutrónico es empleado para irradiar los diferentes materiales candidatos a ser empleados en reactores de fusión, y las muestras son posteriormente examinadas en la llamada instalación de post-irradiación. Como primer paso en tan ambicioso proyecto, una fase de validación y diseño llamada IFMIFEVEDA (Engineering Validation and Engineering Design Activities) se encuentra actualmente en desarrollo. Una de las actividades contempladas en esta fase es la construcción y operación de una acelarador prototipo llamado LIPAc (Linear IFMIF Prototype Accelerator). Se trata de un acelerador de deuterones de alta intensidad idéntico a la parte de baja energía de los aceleradores de IFMIF. Los componentes del LIPAc, que será instalado en Japón, son suministrados por diferentes países europeos. El acelerador proporcionará un haz continuo de deuterones de 9 MeV con una potencia de 1.125 MW que tras ser caracterizado con diversos instrumentos deberá pararse de forma segura. Para ello se requiere un sistema denominado bloque de parada (Beam Dump en inglés) que absorba la energía del haz y la transfiera a un sumidero de calor. España tiene el compromiso de suministrar este componente y CIEMAT (Centro de Investigaciones Energéticas Medioambientales y Tecnológicas) es responsable de dicha tarea. La pieza central del bloque de parada, donde se para el haz de iones, es un cono de cobre con un ángulo de 3.5o, 2.5 m de longitud y 5 mm de espesor. Dicha pieza está refrigerada por agua que fluye en su superficie externa por el canal que se forma entre el cono de cobre y otra pieza concéntrica con éste. Este es el marco en que se desarrolla la presente tesis, cuyo objeto es el diseño del sistema de refrigeración del bloque de parada del LIPAc. El diseño se ha realizado utilizando un modelo simplificado unidimensional. Se han obtenido los parámetros del agua (presión, caudal, pérdida de carga) y la geometría requerida en el canal de refrigeración (anchura, rugosidad) para garantizar la correcta refrigeración del bloque de parada. Se ha comprobado que el diseño permite variaciones del haz respecto a la situación nominal siendo el flujo crítico calorífico al menos 2 veces superior al nominal. Se han realizado asimismo simulaciones fluidodinámicas 3D con ANSYS-CFX en aquellas zonas del canal de refrigeración que lo requieren. El bloque de parada se activará como consecuencia de la interacción del haz de partículas lo que impide cualquier cambio o reparación una vez comenzada la operación del acelerador. Por ello el diseño ha de ser muy robusto y todas las hipótesis utilizadas en la realización de éste deben ser cuidadosamente comprobadas. Gran parte del esfuerzo de la tesis se centra en la estimación del coeficiente de transferencia de calor que es determinante en los resultados obtenidos, y que se emplea además como condición de contorno en los cálculos mecánicos. Para ello por un lado se han buscado correlaciones cuyo rango de aplicabilidad sea adecuado para las condiciones del bloque de parada (canal anular, diferencias de temperatura agua-pared de decenas de grados). En un segundo paso se han comparado los coeficientes de película obtenidos a partir de la correlación seleccionada (Petukhov-Gnielinski) con los que se deducen de simulaciones fluidodinámicas, obteniendo resultados satisfactorios. Por último se ha realizado una validación experimental utilizando un prototipo y un circuito hidráulico que proporciona un flujo de agua con los parámetros requeridos en el bloque de parada. Tras varios intentos y mejoras en el experimento se han obtenido los coeficientes de película para distintos caudales y potencias de calentamiento. Teniendo en cuenta la incertidumbre de las medidas, los valores experimentales concuerdan razonablemente bien (en el rango de 15%) con los deducidos de las correlaciones. Por motivos radiológicos es necesario controlar la calidad del agua de refrigeración y minimizar la corrosión del cobre. Tras un estudio bibliográfico se identificaron los parámetros del agua más adecuados (conductividad, pH y concentración de oxígeno disuelto). Como parte de la tesis se ha realizado asimismo un estudio de la corrosión del circuito de refrigeración del bloque de parada con el doble fin de determinar si puede poner en riesgo la integridad del componente, y de obtener una estimación de la velocidad de corrosión para dimensionar el sistema de purificación del agua. Se ha utilizado el código TRACT (TRansport and ACTivation code) adaptándalo al caso del bloque de parada, para lo cual se trabajó con el responsable (Panos Karditsas) del código en Culham (UKAEA). Los resultados confirman que la corrosión del cobre en las condiciones seleccionadas no supone un problema. La Tesis se encuentra estructurada de la siguiente manera: En el primer capítulo se realiza una introducción de los proyectos IFMIF y LIPAc dentro de los cuales se enmarca esta Tesis. Además se describe el bloque de parada, siendo el diseño del sistema de rerigeración de éste el principal objetivo de la Tesis. En el segundo y tercer capítulo se realiza un resumen de la base teórica así como de las diferentes herramientas empleadas en el diseño del sistema de refrigeración. El capítulo cuarto presenta los resultados del relativos al sistema de refrigeración. Tanto los obtenidos del estudio unidimensional, como los obtenidos de las simulaciones fluidodinámicas 3D mediante el empleo del código ANSYS-CFX. En el quinto capítulo se presentan los resultados referentes al análisis de corrosión del circuito de refrigeración del bloque de parada. El capítulo seis se centra en la descripción del montaje experimental para la obtención de los valores de pérdida de carga y coeficiente de transferencia del calor. Asimismo se presentan los resultados obtenidos en dichos experimentos. Finalmente encontramos un capítulo de apéndices en el que se describen una serie de experimentos llevados a cabo como pasos intermedios en la obtención del resultado experimental del coeficiente de película. También se presenta el código informático empleado para el análisis unidimensional del sistema de refrigeración del bloque de parada llamado CHICA (Cooling and Heating Interaction and Corrosion Analysis). ABSTRACT In the nuclear fusion field running in parallel to ITER (International Thermonuclear Experimental Reactor) as one of the complementary activities headed towards solving the technological barriers, IFMIF (International Fusion Material Irradiation Facility) project aims to provide an irradiation facility to qualify advanced materials resistant to extreme conditions like the ones expected in future fusion reactors like DEMO (DEMOnstration Power Plant). IFMIF consists of two constant wave deuteron accelerators delivering a 125 mA and 40 MeV beam each that will collide on a lithium target producing an intense neutron fluence (1017 neutrons/s) with a similar spectra to that of fusion neutrons [1], [2]. This neutron flux is employed to irradiate the different material candidates to be employed in the future fusion reactors, and the samples examined after irradiation at the so called post-irradiative facilities. As a first step in such an ambitious project, an engineering validation and engineering design activity phase called IFMIF-EVEDA (Engineering Validation and Engineering Design Activities) is presently going on. One of the activities consists on the construction and operation of an accelerator prototype named LIPAc (Linear IFMIF Prototype Accelerator). It is a high intensity deuteron accelerator identical to the low energy part of the IFMIF accelerators. The LIPAc components, which will be installed in Japan, are delivered by different european countries. The accelerator supplies a 9 MeV constant wave beam of deuterons with a power of 1.125 MW, which after being characterized by different instruments has to be stopped safely. For such task a beam dump to absorb the beam energy and take it to a heat sink is needed. Spain has the compromise of delivering such device and CIEMAT (Centro de Investigaciones Energéticas Medioambientales y Tecnológicas) is responsible for such task. The central piece of the beam dump, where the ion beam is stopped, is a copper cone with an angle of 3.5o, 2.5 m long and 5 mm width. This part is cooled by water flowing on its external surface through the channel formed between the copper cone and a concentric piece with the latter. The thesis is developed in this realm, and its objective is designing the LIPAc beam dump cooling system. The design has been performed employing a simplified one dimensional model. The water parameters (pressure, flow, pressure loss) and the required annular channel geometry (width, rugoisty) have been obtained guaranteeing the correct cooling of the beam dump. It has been checked that the cooling design allows variations of the the beam with respect to the nominal position, being the CHF (Critical Heat Flux) at least twice times higher than the nominal deposited heat flux. 3D fluid dynamic simulations employing ANSYS-CFX code in the beam dump cooling channel sections which require a more thorough study have also been performed. The beam dump will activateasaconsequenceofthe deuteron beam interaction, making impossible any change or maintenance task once the accelerator operation has started. Hence the design has to be very robust and all the hypotheses employed in the design mustbecarefully checked. Most of the work in the thesis is concentrated in estimating the heat transfer coefficient which is decisive in the obtained results, and is also employed as boundary condition in the mechanical analysis. For such task, correlations which applicability range is the adequate for the beam dump conditions (annular channel, water-surface temperature differences of tens of degrees) have been compiled. In a second step the heat transfer coefficients obtained from the selected correlation (Petukhov- Gnielinski) have been compared with the ones deduced from the 3D fluid dynamic simulations, obtaining satisfactory results. Finally an experimental validation has been performed employing a prototype and a hydraulic circuit that supplies a flow with the requested parameters in the beam dump. After several tries and improvements in the experiment, the heat transfer coefficients for different flows and heating powers have been obtained. Considering the uncertainty in the measurements the experimental values agree reasonably well (in the order of 15%) with the ones obtained from the correlations. Due to radiological reasons the quality of the cooling water must be controlled, hence minimizing the copper corrosion. After performing a bibligraphic study the most adequate water parameters were identified (conductivity, pH and dissolved oxygen concentration). As part of this thesis a corrosion study of the beam dump cooling circuit has been performed with the double aim of determining if corrosion can pose a risk for the copper beam dump , and obtaining an estimation of the corrosion velocitytodimension the water purification system. TRACT code(TRansport and ACTivation) has been employed for such study adapting the code for the beam dump case. For such study a collaboration with the code responsible (Panos Karditsas) at Culham (UKAEA) was established. The work developed in this thesis has supposed the publication of three articles in JCR journals (”Journal of Nuclear Materials” y ”Fusion Engineering and Design”), as well as presentations in more than four conferences and relevant meetings.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

It is impossible to talk about planning as a scientific meta-discipline without mentioning one of the most influential worldwide figures in the second half of the twentieth century: John Friedmann. His contribution to the planning concept on his "Planning as Social Learning" theory is still very relevant. This paper shows the intellectual connection between Friedmann and Angel Ramos and Ignacio Trueba, two of the Spanish intellectual drivers in the engineering project knowledge area, who contributed to founding the Engineering Projects Spanish Association. The three of them share a broad vision of the project and abandon the "blue print" planning model. They also see the project as a transformational tool that requires a different planning style to the one which prevailed in the 70s - both in public and private domains. They were pioneers in structuring Knowledge / Action in a different way, both in academic institutions where disciples helped to bring about change- and with direct action via projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Institute of Tropical Medicine in Antwerp hereby presents the results of two pilot distance learning training programmes, developed under the umbrella of the AFRICA BUILD project (FP7). The two courses focused on evidence-based medicine (EBM): with the aim of enhancing research and education, via novel approaches and to identify research needs emanating from the field. These pilot experiences, which were run both in English-speaking (Ghana), and French-speaking (Mali and Cameroon) partner institutions, produced targeted courses for the strengthening of research methodology and policy. The courses and related study materials are in the public domain and available through the AFRICA BUILD Portal (http://www.africabuild.eu/taxonomy/term/37); the training modules were delivered live via Dudal webcasts. This paper assesses the success and difficulties of transferring EBM skills with these two specific training programmes, offered through three different approaches: fully online facultative courses, fully online tutor supported courses or through a blended approach with both online and face-to-face sessions. Key factors affecting the selection of participants, the accessibility of the courses, how the learning resources are offered, and how interactive online communities are formed, are evaluated and discussed.