5 resultados para Storage tanks.

em Universidad Politécnica de Madrid


Relevância:

70.00% 70.00%

Publicador:

Resumo:

The water storage tanks of hotel trains suffered pitting corrosion. To identify the cause, the tanks were subjected to a detailed metallographic study and the chemical composition of the austenitic stainless steels used in their construction was determined. Both the tank water and the corrosion products were further examined by physicochemical and microbiological testing. Corrosion was shown to be related to an incompatibility between the chloride content of the water and the base and filler metals of the tanks. These findings formed the basis of recommendations aimed at the prevention and control of corrosion in such tanks. Se han detectado problemas de corrosión por picaduras en los depósitos de agua de trenes hotel. Para identificar las causas se llevó a cabo un detallado estudio metalográfico así como de la composición química de los aceros inoxidables austeníticos utilizados en su construcción. También se realizaron estudios fisicoquímicos y microbiológicos de los productos de corrosión. Se ha encontrado que los problemas de corrosión están relacionados con la incompatibilidad entre el contenido en cloruros del agua y los metales base y de aporte de la soldadura de los tanques. En base a estos hallazgos se proponen una serie de recomendaciones encaminadas a la prevención y control de la corrosión de dichos depósitos.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Many efforts have been made in order to adequate the production of a solar thermal collector field to the consumption of domestic hot water of the inhabitants of a building. In that sense, much has been achieved in different domains: research agencies, government policies and manufacturers. However, most of the design rules of the solar plants are based on steady state models, whereas solar irradiance, consumption and thermal accumulation are inherently transient processes. As a result of this lack of physical accuracy, thermal storage tanks are sometimes left to be as large as the designer decides without any aforementioned precise recommendation. This can be a problem if solar thermal systems are meant to be implemented in nowadays buildings, where there is a shortage of space. In addition to that, an excessive storage volume could not result more efficient in many residential applications, but costly, extreme in space consumption and in some cases too heavy. A proprietary transient simulation program has been developed and validated with a detailed measurement campaign in an experimental facility. In situ environmental data have been obtained through a whole year of operation. They have been gathered at intervals of 10 min for a solar plant of 50 m2 with a storage tank of 3 m3, including the equipment for domestic hot water production of a typical apartment building. This program has been used to obtain the design and dimensioning criteria of DHW solar plants under daily transient conditions throughout a year and more specifically the size of the storage tank for a multi storey apartment building. Comparison of the simulation results with the current Spanish regulation applicable, “Código Técnico de la Edificación” (CTE 2006), offers fruitful details and establishes solar facilities dimensioning criteria.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

ENAGAS tiene la intención de ampliar el Terminal de Regasificación de GNL que tiene en el puerto de Barcelona. El presente Proyecto Básico define las instalaciones de uno de los Tanques de almacenamiento de GNL que se van a construir dentro del Alcance de dicha ampliación, con el suficiente detalle como para permitir a ENAGAS acometer las tareas previas a la ejecución del proyecto, a saber: 1. Planificar y presupuestar la fase de ejecución 2. Solicitar los Permisos y Autorizaciones necesarias de los Organismos competentes 3. Lanzar la Petición de Ofertas para el concurso llave en mano del EPC. Los trabajos de Ingeniería contenidos en el Proyecto Básico son los siguientes: Antecedentes y Datos básicos, Criterios de diseño, Descripción de instalaciones, Cálculos estructurales, Planos del Tanque de GNL, Definición de equipos y materiales a utilizar, Plan de ejecución del proyecto, Especificaciones técnicas para Ingeniería, Compras y Construcción, Paquete para Petición de Ofertas del EPC, Condiciones técnicas particulares, Programa de ejecución y Presupuesto de inversiones. ABSTRACT ENAGAS is expanding its LNG Regasification Terminal located in Barcelona Port (Spain). This Document reports the Front End Engineering and Design (FEED) works undertaken in relation to one of the LNG Storage Tanks to be built within the scope of that expansion. The Project FEED hereby presented comprehensively defines the LNG Storage Tank so as to allow ENAGAS to perform next stages of the Works, namely: 1. Plan and budget the Project Execution phase 2. Request Regulatory authorizations 3. Invite Contractors to bid for the LNG Tank EPC. Main components of the FEED Document contents are as follow:Background and Basic Data, Design Criteria, Description of LNG Tank elements, Engineering Calculations, LNG Tank Drawings, Equipment and Materials definition, Project Execution Plan (PEP), Technical Conditions, EPC Invitation to Tender (ITT) package, Execution Schedule and Cost Estimate.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The problems being addressed involve the dynamic interaction of solids (structure and foundation) with a liquid (water). Various numerical procedures are reviewed and employed to solve the problem of establishing the expected response of a structure subjected to seismic excitations while duly accounting for those interactions. The methodology is applied to the analysis of dams, lock gates, and large storage tanks, incorporating in some cases a comparison with the results produced by means of simplified analytical procedures.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Los procesos relacionados con el almacenamiento y manipulación de productos petrolíferos, conllevan siempre determinados riesgos de incendio que dependen básicamente de las propiedades físicas y químicas de los productos, y hacen indispensable la adopción de importantes medidas de seguridad contra incendios. Esto es debido a que las consecuencias previsibles en caso de la producción y expansión del incendio son tan graves que aconsejan la instalación de medios más potentes de lucha contra incendios, que los simples extintores manuales. En base a ello, el presente proyecto pretende definir y desarrollar una propuesta de diseño del sistema de protección contra incendios en la zona de almacenamiento de una planta de almacenamiento de líquidos petrolíferos. La planta almacena Gasóleo, Gasolina y Queroseno de Aviación en ocho tanques atmosféricos de techo fijo situados en un único cubeto de retención. Se desarrolla un extenso estudio de los requisitos normativos para este tipo de casos, y en consecuencia, se calcula y clasifica el nivel de riesgo intrínseco de incendio en la zona estudiada, a partir de su carga de fuego ponderada y corregida. Además, se muestra la distribución de los tanques en el cubeto, basada en el cálculo de las distancias de seguridad entre cada uno de ellos y con el exterior. A partir de ello, el proyecto se centra en el cálculo de los valores de descarga de agua de refrigeración, requeridos en las boquillas de agua pulverizada e hidrantes exteriores de alrededor de la zona de riesgo; de espuma física para hidrocarburos, en las cámaras de espuma de la parte superior de la envolvente de los tanques, y en los monitores auxiliares de descarga de espuma, de la zona del cubeto de retención. Los objetivos, métodos y bases de cálculo se recogen en la memoria del proyecto. Además se incluye, la planificación temporal con MS Project, de la implementación del proyecto; la elección de los equipos que componen los sistemas, el presupuesto asociado y los planos de distribución de la planta y del flujo de tuberías propuesto. ABSTRACT Fire protection units and equipment are necessary on processes and operations related to storage and handling of petroleum products, because of their flammable and combustible properties. In case a hazard of fire from petroleum products is materialized, huge consequences are to be expected. To reduce losses, facilities should be equipped with appropriate protection. Based on that, this project seeks to define and develop the fire protection system design for a petroleum liquids storage installation. The plant stores Gasoil, Gasoline, and aviation Kerosene in eight fixed roof atmospheric tanks. A complete study of the fire protection regulations is carried out and, as a result, the studied area’s risk level is determined from its fire load density. The calculation of the minimum shell-to-shell spacing of adjacent aboveground storage tanks and external equipment, is also determined for a correct distribution of tanks in the bunded area. Assuming that, the design includes calculations of required discharge of water for spray nozzles and hydrants, and required discharge of foam from foam chambers and foam monitors. Objectives, methodology and calculation basis are presented on the project technical report; which also includes project scheduling with MS. Project software, the selection of system components and equipment, related budget and lay out of installation and piping.