13 resultados para Stock inspection
em Universidad Politécnica de Madrid
Resumo:
This paper presents the work carried out by Metro de Madrid and the Railway Technology Research Centre (Polytechnic University of Madrid), aimed at setting up rolling stock simulation models with a high level of detail. To do this, the features of the SIMPACK simulation tool used to create models have been briefly outlined, explaining the main features of models in two of the series modelled: 7000 and 8000. Finally, the results obtained from comparing comfort in the 7000 and 8000 series are presented.
Resumo:
This paper focuses on the railway rolling stock circulation problem in rapid transit networks, in which frequencies are high and distances are relatively short. Although the distances are not very large, service times are high due to the large number of intermediate stops required to allow proper passenger flow. The main complicating issue is the fact that the available capacity at depot stations is very low, and both capacity and rolling stock are shared between different train lines. This forces the introduction of empty train movements and rotation maneuvers, to ensure sufficient station capacity and rolling stock availability. However, these shunting operations may sometimes be difficult to perform and can easily malfunction, causing localized incidents that could propagate throughout the entire network due to cascading effects. This type of operation will be penalized with the goal of selectively avoiding them and ameliorating their high malfunction probabilities. Critic trains, defined as train services that come through stations that have a large number of passengers arriving at the platform during rush hours, are also introduced. We illustrate our model using computational experiments drawn from RENFE (the main Spanish operator of suburban passenger trains) in Madrid, Spain. The results of the model, achieved in approximately 1 min, have been received positively by RENFE planners
Resumo:
The aim of this paper is to propose an integrated planning model to adequate the offered capacity and system frequencies to attend the increased passenger demand and traffic congestion around urban and suburban areas. The railway capacity is studied in line planning, however, these planned frequencies were obtained without accounting for rolling stock flows through the rapid transit network. In order to provide the problem more freedom to decide rolling stock flows and therefore better adjusting these flows to passenger demand, a new integrated model is proposed, where frequencies are readjusted. Then, the railway timetable and rolling stock assignment are also calculated, where shunting operations are taken into account. These operations may sometimes malfunction, causing localized incidents that could propagate throughout the entire network due to cascading effects. This type of operations will be penalized with the goal of selectively avoiding them and ameliorating their high malfunction probabilities. Swapping operations will also be ensured using homogeneous rolling stock material and ensuring parkings in strategic stations. We illustrate our model using computational experiments drawn from RENFE (the main Spanish operator of suburban passenger trains) in Madrid, Spain. The results show that through this integrated approach a greater robustness degree can be obtained
Resumo:
Today, the building sector alone accounts for 40% of the total energy consumption in the European Union (EU). In most EU member states, about 70–90% of the buildings were constructed at least 20 years ago. Due to this, these buildings have a worse energy efficiency behavior than the new ones that comply with current regulations. As a consequence, acting on the existing building stock is needed, developing special methods on assessment and advice in order to reduce the total energy consumption. This article addresses a procedure allowing the classification and characterization of existing buildings facades. It can help researchers to achieve in-depth knowledge of the facades construction and therefore knowing their thermal behavior. Once knowing that, the most appropriate upgrading strategies can be established with the purpose of reducing the energy demand. Furthermore, the classified facade typologies have been verified, complying with current and future Spanish regulations and according to the results obtained, a series of upgrading strategies based on the opaque part and those in the translucent part, have been proposed. As a conclusion, this procedure helps us to select the most appropriate improvement measures for each type of facade in order to comply with current and future Spanish regulations. This proposed method has been tested in a specific neighborhood of Madrid, in a selected period of time, between 1950 and 1980, but it could be applicable to any other city.
Resumo:
This paper focuses on the railway rolling stock circulation problem in rapid transit networks where the known demand and train schedule must be met by a given fleet. In rapid transit networks the frequencies are high and distances are relatively short. Although the distances are not very large, service times are high due to the large number of intermediate stops required to allow proper passenger flow. The previous circumstances and the reduced capacity of the depot stations and that the rolling stock is shared between the different lines, force the introduction of empty trains and a careful control on shunting operation. In practice the future demand is generally unknown and the decisions must be based on uncertain forecast. We have developed a stochastic rolling stock formulation of the problem. The computational experiments were developed using a commercial line of the Madrid suburban rail network operated by RENFE (The main Spanish operator of suburban trains of passengers). Comparing the results obtained by deterministic scenarios and stochastic approach some useful conclusions may be obtained.
Resumo:
Delamination reduces the strenght of the composites, mainly in compression. Several methods exist to overcome this problem, but they are either not feasible for large scale production or too expensive. 3D composites are a promising solution.
Resumo:
Wind-flow pattern over embankments involves an overexposure of the rolling stock travelling on them to wind loads. Windbreaks are a common solution for changing the flow characteristic in order to decrease unwanted effects induced by the presence of crosswind. The shelter effectiveness of a set of windbreaks placed over a railway twin-track embankment is experimentally analysed. A set of two-dimensional wind tunnel tests are undertaken and results corresponding to pressure tap measurements over a section of a typical high-speed train are herein presented.The results indicate that even small-height windbreaks provide sheltering effects to the vehicles. Also, eaves located at the windbreak tips seem to improve their sheltering effect.
Resumo:
La vegetación es uno de los factores que condicionan los stocks de C en los suelos ya que determina la cantidad y calidad de la materia orgánica que incorpora al suelo, la estructura y condiciones microclimáticas edáficas, la respiración radicular, micorrizas y bacterias asociadas. En las últimas décadas se ha observado un ascenso del límite del árbol, así como la matorralización de la vegetación en los ecosistemas de montaña consecuencia del cambio climático y de los cambios en el uso del suelo. Sin embargo, las consecuencias de los cambios de la vegetación sobre los stocks de C del suelo no se conocen todavía de manera satisfactoria y los observados hasta ahora no son unívocos. El objetivo de este trabajo es identificar los parámetros relacionados con la vegetación que mejor predicen los stocks de C y N en el suelo.
Resumo:
Is it profitable for an investor, from a risk-return perspective, to acquire a stake in a quoted company when a capital increase is announced? This paper analyses the return obtained from the investment in equity issues with cash contribution and pre-emptive rights, aimed at funding corporate activities: acquisitions, investments in new facilities and/or strengthening the balance sheet of the companies undertaking the equity issue. During the 16 years covered by the study, the results show a negative average excess risk-adjusted return of almost 5%, from the moment that the equity offer is announced until the completion of the preferential subscription period. To obtain this excess return, the difference between the nominal Internal Rate of Return (IRR) and the expected return, using the CAPM, is computed for each equity issue. The intention behind this method is to eliminate the effects of time and any other possible effect on the stock price during the period of the analysis.The results from this article are consistent with the Pecking Order theory for the Spanish Stock Market also six months after the preferential subscription period. However, there is a positive return after three months.
Resumo:
The building sector is well known to be one of the key energy consumers worldwide. The renovation of existing buildings provides excellent opportunities for an effective reduction of energy consumption and greenhouse gas emissions but it is essential to identify the optimal strategies. In this paper a multi-criteria methodology is proposed for the comparative analysis of retrofitting solutions. Life Cycle Assessment (LCA) and Life Cycle Cost (LCC) are combined by expressing environmental impacts in monetary values. A Pareto optimization is used to select the preferred strategies. The methodology is exemplified by a case study: the renovation of a representative housing block from the 1960s located in Madrid. Eight scenarios have been proposed, from the Business as Usual scenario (BAU), through Spanish Building Regulation requirements (for new buildings) up to the Passive House standard. Results show how current renovation strategies that are being applied in Madrid are far from being optimal solutions. The required additional investment, which is needed to obtain an overall performance improvement of the envelope compared with the common practice to date, is relatively low (8%) considering the obtained life cycle environmental and financial savings (43% and 45%, respectively).
Resumo:
El presente trabajo se centra en la elaboración de un estudio y análisis de una red de suministros, con el objetivo de reducir el stock de producto terminado y hacer una propuesta de rediseño de la red de abastecimiento y distribución. Los principales agentes implicados en el proyecto son la empresa Aguabuena1, matriz española de la multinacional Goodwater¹, SERTEC¹, la empresa de servicio técnico oficial de Aguabuena y principal agente implicado en el proyecto, y las 24 empresas de servicio técnico, EST’s, que trabajan con contratos de exclusividad para SERTEC en todo el territorio nacional, así como los proveedores de los equipos de filtrado de agua y los clientes. La actual red de suministros presenta evidentes deficiencias. Los problemas de abastecimiento que existen no permiten, por un lado, respetar los contratos de nivel de servicio establecidos entre SERTEC y los clientes y por otro, multiplican el número de traslados de material entre almacenes para satisfacer la demanda (estos almacenes están controlados y gestionados por las diferentes empresas de servicio técnico). Los traslados conllevan una gran dispersión del stock, en hasta 40 localizaciones en todo el territorio, y suponen unos costes de transporte elevados entre los puntos de origen, los almacenes de producto terminado donde se localiza el equipo de filtrado, y los puntos de destino donde se instalará el producto. Además el gran volumen de stock conlleva una inversión en equipos muy elevada y supone asumir un coste financiero excesivo para la organización. Con la elaboración del presente proyecto se pretende reducir el número de localizaciones con stock dentro del territorio nacional, a través del rediseño de la red de suministro, con una propuesta que se adapte a las necesidades de los clientes y agentes implicados. Antes de describir las nuevas propuestas de red de abastecimiento fue necesario conocer el coste y características de la red de distribución actual, con el fin de obtener un modelo con el que comparar las nuevas propuestas posibles a implementar. Por ello se realizó un análisis profundo de la operativa, características y costes del modelo logístico o red que se tiene implementada en la actualidad en el sistema. Este análisis permitió además dar a conocer el coste logístico que supone la actual red de abastecimiento que era, en líneas generales, desconocido para SERTEC, Aguabuena y las 24 EST’s. En esta etapa de análisis de la situación y del sistema logístico actual fue necesaria la recopilación de información al respecto: datos de demanda, datos de stock, datos de cobertura, maestro de materiales, almacenes, costes de transporte², almacenaje², expedición², preparación2… con el objetivo de evaluar el sistema logístico actual y tener unos baremos con los que estimar los costes de las propuestas futuras de red de abastecimiento. Una vez analizado el sistema actual, se identificaron oportunidades de mejora del mismo y se inició una nueva fase de diseño de propuestas de red para la distribución. La metodología seguida para la propuesta de escenarios de red fue la siguiente: En una primera etapa se realizó una sesión de trabajo con diferentes participantes que, a través de la técnica de brainstorming, realizaron una serie de propuestas de red. Estas propuestas de red fueron recogidas y evaluadas inicialmente aceptándose algunas de ellas para su valoración cualitativa específica. La segunda etapa consistió en la valoración cualitativa, que se realizó conforme a unos criterios establecidos y consensuados entre los participantes en la sesión de propuestas anterior. Se ponderó cada uno de los criterios y se resumió la valoración de cada escenario de red a través de medias ponderadas. Los escenarios o propuestas con mejor valoración pasaron a la tercera etapa del proceso; la etapa de análisis cuantitativo. En esta etapa se definieron y evaluaron de forma explícita los costes logísticos y financieros que conllevaba cada una de las propuestas de escenario de red. Para ello se establecieron algunas hipótesis de simplificación y cálculo en cada una de las propuestas, y se construyeron las cadenas de costes completas del proceso de distribución, desde la salida del producto desde el proveedor, hasta su instalación final en el punto de destino. Estas cadenas reflejan los costes imputables en el proceso de distribución, su valor y responsable y permiten tener una visión general y resumida de la propuesta de red logística. Entre las hipótesis de simplificación en las propuestas de escenario destaca la elaboración de un modelo de programación lineal que minimiza el coste de transporte desde n localizaciones con stock, especificadas de antemano, a todas las provincias del territorio nacional para diferentes tipologías de envío entre origen y destino. Una vez evaluadas las diferentes propuestas de escenario de red de forma cualitativa y cuantitativa se compararon las valoraciones de cada una de las propuestas y se procedió a señalar una o varias propuestas de posible implementación futura. Finalmente, para estas propuestas de implementación se realizó un estudio previo de riesgos y los impactos previstos para cada riesgo identificado, así como un análisis inicial del impacto ambiental que supondrían las propuestas de red a implementar. Los resultados obtenidos en el desarrollo del presente proyecto fueron los siguientes: Como conclusión de los análisis previos, se definieron 3 posibles escenarios de red a implementar en un futuro. Cada uno de los cuales cumple los requisitos y objetivos que se pretendían alcanzar al inicio del proyecto además de adecuarse a los requisitos iniciales establecidos y los acuerdos de nivel de servicio vigentes. Estos escenarios se denominaron C.1, C.2, y D.2 correspondientes con la nomenclatura que se fue dando a los diferentes escenarios en su etapa de proposición. - El escenario C.1 conlleva, según el estudio realizado, una reducción de localizaciones con stock de 40 a 1, con una reducción del volumen de stock del 84% y un aumento del coste logístico del 40% respecto a la situación actual. - El escenario C.2 conlleva, según el estudio realizado, una reducción de localizaciones con stock de 40 a 9, con una reducción del volumen de stock del 63% y un aumento del coste logístico del 5% respecto a la situación actual. - El escenario D.2 conlleva, según el estudio realizado, una reducción de localizaciones con stock de 40 a 16, con una reducción del volumen de stock del 42% y una reducción del coste logístico del 24% respecto a la situación actual. Los resultados obtenidos del proyecto estaban en consonancia con los objetivos propuestos y las metas a alcanzar en el inicio del mismo. Las conclusiones y recomendaciones derivadas de la realización de este proyecto se resumen en los siguientes puntos: - El rediseño de las redes de abastecimiento y distribución es un proceso complejo que engloba la integración y coordinación de numerosos agentes, procesos, y actividades. Es necesaria una atención especial y un enfoque claro en la visión de conjunto y coherencia que deben tener estos procesos de rediseño. - Las herramientas de análisis tales como la Programación Lineal o la simulación por ordenador de redes logísticas, así como los fundamentos estadísticos relativos a las distribuciones de probabilidad, simulación y valoración suponen una potente ayuda a la hora de caracterizar y rediseñar sistemas logísticos. - Las oportunidades de mejora operativa y económica en las organizaciones, derivadas del desarrollo de soluciones específicas adaptadas a las necesidades y características particulares de cada cadena de suministro, permiten obtener una ventaja competitiva y facilitan la mejora continua en aquellas organizaciones dispuestas al cambio y adaptación como pilares del crecimiento empresarial sostenible.
Resumo:
This work presents the evaluation of a new non-contact technique to assess the fatigue damage state of CFRP structures by measuring surface roughness parameters. Surface roughness and stiffness degradation have been measured in CFRP coupons cycled with constant amplitude loads, and a Pearson?s correlation of 0.79 was obtained between both variables. Results suggest that changes on the surface roughness measured in strategic zones of components made of the evaluated CFRP, could be indicative of the level of damage due to fatigue loads. This methodology could be useful for other FRP due to similarities in the fatigue damage process.
Resumo:
The aim of this study is to explain the changes in the real estate prices as well as in the real estate stock market prices, using some macro-economic explanatory variables, such as the gross domestic product (GDP), the real interest rate and the unemployment rate. Several regressions have been carried out in order to express some types of incremental and absolute deflated real estate lock market indexes in terms of the macro-economic variables. The analyses are applied to the Swedish economy. The period under study is 1984-1994. Time series on monthly data are used. i.e. the number of data-points is 132. If time leads/lags are introduced in the e regressions, significant improvements in the already high correlations are achieved. The signs of the coefficients for IR, UE and GDP are all what one would expect to see from an economic point of view: those for GDP are all positive, those for both IR and UE are negative. All the regressions have high R2 values. Both markets anticipate change in the unemployment rate by 6 to 9 months, which seems reasonable because such change can be forecast quite reliably. But, on the contrary, there is no reason why they should anticipate by 3-6 months changes in the interest rate that can hardly be reliably forecast so far in advance.