29 resultados para Steam Trains

em Universidad Politécnica de Madrid


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sewage sludge gasification assays were performed in an atmospheric fluidised bed reactor using air and air–steam mixtures as the gasifying agents. Dolomite, olivine and alumina are three well known tar removal catalysts used in biomass gasification processing. However, little information is available regarding their performance in sewage sludge gasification. The aim of the current study was to learn about the influence of these three catalysts in the product distribution and tar production during sewage sludge gasification. To this end, a set of assays was performed in which the temperature (750–850 °C), the in-bed catalyst content (0, 10 and 15 wt.%) and the steam–biomass ratio (SB) in the range of 0–1 were varied with a constant equivalence ratio (ER) of 0.3. The results were compared to the results from gasification without a catalyst. We show that dolomite has the highest activity in tar elimination, followed by alumina and olivine. In addition to improving tar removal, the presence of water vapour and the catalysts increased the content of H2 in the gases by nearly 60%.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Numerous references can be found in scientific literature regarding biomass gasification. However, there are few works related to sludge gasification. A study of sewage sludge gasification process in a bubbling fluidised bed gasifier on a laboratory scale is here reported. The aim was to find the optimum conditions for reducing the production of tars and gain more information on the influx of different operating variables in the products resulting from the gasification of this waste. The variables studied were the equivalence ratio (ER), the steam-biomass ratio (SB) and temperature. Specifically, the ER was varied from 0.2 to 0.4, the SB from 0 to 1 and the temperature from 750 °C (1023 K) to 850 °C (1123 K). Although it was observed that tar production could be considerably reduced (up to 72%) by optimising the gasification conditions, the effect of using alumina (aluminium oxide, of proven efficacy in destroying the tar produced in biomass gasification) as primary catalyst in air and air-steam mixture tests was also verified. The results show that by adding small quantities of alumina to the bed (10% by weight of fed sludge) considerable reductions in tar production can be obtained (up to 42%) improving, at the same time, the lower heating value (LHV) of the gas and carbon conversion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The water storage tanks of hotel trains suffered pitting corrosion. To identify the cause, the tanks were subjected to a detailed metallographic study and the chemical composition of the austenitic stainless steels used in their construction was determined. Both the tank water and the corrosion products were further examined by physicochemical and microbiological testing. Corrosion was shown to be related to an incompatibility between the chloride content of the water and the base and filler metals of the tanks. These findings formed the basis of recommendations aimed at the prevention and control of corrosion in such tanks. Se han detectado problemas de corrosión por picaduras en los depósitos de agua de trenes hotel. Para identificar las causas se llevó a cabo un detallado estudio metalográfico así como de la composición química de los aceros inoxidables austeníticos utilizados en su construcción. También se realizaron estudios fisicoquímicos y microbiológicos de los productos de corrosión. Se ha encontrado que los problemas de corrosión están relacionados con la incompatibilidad entre el contenido en cloruros del agua y los metales base y de aporte de la soldadura de los tanques. En base a estos hallazgos se proponen una serie de recomendaciones encaminadas a la prevención y control de la corrosión de dichos depósitos.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

To study the fluid motion-vehicle dynamics interaction, a model of four, liquid filled two-axle container freight wagons was set up. The railway vehicle has been modelled as a multi-body system (MBS). To include fluid sloshing, an equivalent mechanical model has been developed and incorporated. The influence of several factors has been studied in computer simulations, such as track defects, curve negotiation, train velocity, wheel wear, liquid and solid wagonload, and container baffles. SIMPACK has been used for MBS analysis, and ANSYS for liquid sloshing modelling and equivalent mechanical systems validation. Acceleration and braking manoeuvres of the freight train set the liquid cargo into motion. This longitudinal sloshing motion of the fluid cargo inside the tanks initiated a swinging motion of some components of the coupling gear. The coupling gear consists of UIC standard traction hooks and coupling screws that are located between buffers. One of the coupling screws is placed in the traction hook of the opposite wagon thus joining the two wagons, whereas the unused coupling screw rests on a hanger. Simulation results showed that, for certain combinations of type of liquid, filling level and container dimensions, the liquid cargo could provoke an undesirable, although not hazardous, release of the unused coupling screw from its hanger. The coupling screw's release was especially obtained when a period of acceleration was followed by an abrupt braking manoeuvre at 1 m/s2. It was shown that a resonance effect between the liquid's oscillation and the coupling screw's rotary motion could be the reason for the coupling screw's undesired release. Possible solutions to avoid the phenomenon are given.Acceleration and braking manoeuvres of the freight train set the liquid cargo into motion. This longitudinal sloshing motion of the fluid cargo inside the tanks initiated a swinging motion of some components of the coupling gear. The coupling gear consists of UIC standard traction hooks and coupling screws that are located between buffers. One of the coupling screws is placed in the traction hook of the opposite wagon thus joining the two wagons, whereas the unused coupling screw rests on a hanger. This paper reports on a study of the fluid motion-train vehicle dynamics interaction. In the study, a model of four, liquid-filled two-axle container freight wagons was developed. The railway vehicle has been modeled as a multi-body system (MBS). To include fluid sloshing, an equivalent mechanical model has been developed and incorporated. The influence of several factors has been studied in computer simulations, such as track defects, curve negotiation, train velocity, wheel wear, liquid and solid wagonload, and container baffles. A simulation program was used for MBS analysis, and a finite element analysis program was used for liquid sloshing modeling and equivalent mechanical systems validation. Acceleration and braking maneuvers of the freight train set the liquid cargo into motion. This longitudinal sloshing motion of the fluid cargo inside the tanks initiated a swinging motion of some components of the coupling gear. Simulation results showed that, for certain combinations of type of liquid, filling level and container dimensions, the liquid cargo could provoke an undesirable, although not hazardous, release of an unused coupling screw from its hanger. It was shown that a resonance effect between the liquid's oscillation and the coupling screw's rotary motion could be the reason for the coupling screw's undesired release. Solutions are suggested to avoid the resonance problem, and directions for future research are given.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Culverts are very common in recent railway lines. Wild life corridors and drainage conducts often fall in this category of partially buried structures. Their dynamic behavior has received far less attention than other structures such as bridges but its large number makes that study an interesting challenge from the point of view of safety and savings. In this paper a complete study of a culvert, including on-site measurements as well as numerical modelling, will be presented. The structure belongs to the high speed railway line linking Segovia and Valladolid, in Spain. The line was opened to traffic in 2004. Its dimensions (3x3m) are the most frequent along the line. Other factors such as reduced overburden (0.6m) and an almost right angle with the track axis make it an interesting example to extract generalized conclusions. On site measurements have been performed in the structure recording the dynamic response at selected points of the structure during the passage of high speed trains at speeds ranging between 200 and 300km/h. The measurements by themselves provide a good insight into the main features of the dynamic behaviour of the structure. A 3D finite element model of the structure, representing its key features was also studied as it allows further understanding of the dynamic response to the train loads . In the paper the discrepancies between predicted and measured vibration levels will be analyzed and some advices on numerical modelling will be proposed

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An aerodynamic optimization of the train aerodynamic characteristics in term of front wind action sensitivity is carried out in this paper. In particular, a genetic algorithm (GA) is used to perform a shape optimization study of a high-speed train nose. The nose is parametrically defined via Bézier Curves, including a wider range of geometries in the design space as possible optimal solutions. Using a GA, the main disadvantage to deal with is the large number of evaluations need before finding such optimal. Here it is proposed the use of metamodels to replace Navier-Stokes solver. Among all the posibilities, Rsponse Surface Models and Artificial Neural Networks (ANN) are considered. Best results of prediction and generalization are obtained with ANN and those are applied in GA code. The paper shows the feasibility of using GA in combination with ANN for this problem, and solutions achieved are included.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this work a methodology for analysing the lateral coupled behavior of large viaducts and high-speed trains is proposed. The finite element method is used for the structure, multibody techniques are applied for vehicles and the interaction between them is established introducing wheel-rail nonlinear contact forces. This methodology is applied for the analysis of the railway viaduct of the R´ıo Barbantino, which is a very long and tall bridge in the north-west spanish high-speed line.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Probabilistic Safety Assessment (PSA) is being developed for a steam-methane reforming hydrogen production plant linked to a High-Temperature Gas Cooled Nuclear Reactor (HTGR). This work is based on the Japan Atomic Energy Research Institute’s (JAERI) High Temperature Test Reactor (HTTR) prototype in Japan. This study has two major objectives: calculate the risk to onsite and offsite individuals, and calculate the frequency of different types of damage to the complex. A simplified HAZOP study was performed to identify initiating events, based on existing studies. The initiating events presented here are methane pipe break, helium pipe break, and PPWC heat exchanger pipe break. Generic data was used for the fault tree analysis and the initiating event frequency. Saphire was used for the PSA analysis. The results show that the average frequency of an accident at this complex is 2.5E-06, which is divided into the various end states. The dominant sequences result in graphite oxidation which does not pose a health risk to the population. The dominant sequences that could affect the population are those that result in a methane explosion and occur 6.6E-8/year, while the other sequences are much less frequent. The health risk presents itself if there are people in the vicinity who could be affected by the explosion. This analysis also demonstrates that an accident in one of the plants has little effect on the other. This is true given the design base distance between the plants, the fact that the reactor is underground, as well as other safety characteristics of the HTGR. Sensitivity studies are being performed in order to determine where additional and improved data is needed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the last few years, the European Union (EU) has become greatly concerned about the environmental costs of road transport in Europe as a result of the constant growth in the market share of trucks and the steady decline in the market share of railroads. In order to reverse this trend, the EU is promoting the implementation of additional charges for heavy goods vehicles (HGV) on the trunk roads of the EU countries. However, the EU policy is being criticised because it does not address the implementation of charges to internalise the external costs produced by automobiles and other transport modes such as railroad. In this paper, we first describe the evolution of the HGV charging policy in the EU, and then assess its practical implementation across different European countries. Second, and of greater significance, by using the case study of Spain, we evaluate to what extent the current fees on trucks and trains reflect their social marginal costs, and consequently lead to an allocative-efficient outcome. We found that for the average case in Spain the truck industry meets more of the marginal social cost produced by it than does the freight railroad industry. The reason for this lies in the large sums of money paid by truck companies in fuel taxes, and the subsidies that continue to be granted by the government to the railroads.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A technique to implement an electrically tunable delay line with high bandwidth for trains of ultrashort optical pulses is presented. The system is based on the temporal self-imaging effect in fiber gratings and electrooptic modulation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

One of the phenomena that limit the velocity of trains in high speed lines is the so- called “ballast pick-up”. It is a ballast train-induced-wind erosion (or BATIWE) that can produce damage to the train under body and the infrastructure surrounding the tracks. The analysis of the measurements taken during several passes of the train allows for a criterion of ballast flight initiation to be obtained. The first rotation of a ballast stone occurs when the impulse given to the stone (arising from the aerodynamic loading produced by the wind gust genera ted by the passing train) overpasses a critical impulse. This impulse depends on the physical properties of the stone (mass, shape, moment of inertia, etc. ...) and its posture on the track bed. The aim of this paper is to report on the experimental results obtained in the ADIF’S Brihuega (Guadalajara) test station, in the Madrid to Barcelona high speed line, and the way they can be used to support the feasibility of the definition of a criterion to evaluate the BA TIWE capability of trains. The results obtained show the feasibility of the proposed method, and contribute to a method of BATIWE characterization, which can be relevant for the development of train interoperability standardization.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Integrated Safety Assessment (ISA) methodology, developed by the Spanish Nuclear Safety Council (CSN), has been applied to a thermo-hydraulical analysis of a Westinghouse 3-loop PWR plant by means of the dynamic event trees (DET) for Steam Generator Tube Rupture (SGTR) sequences. The ISA methodology allows obtaining the SGTR Dynamic Event Tree taking into account the operator actuation times. Simulations are performed with SCAIS (Simulation Code system for Integrated Safety Assessment), which includes a dynamic coupling with MAAP thermal hydraulic code. The results show the capability of the ISA methodology and SCAIS platform to obtain the DET of complex sequences.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The commercial centre VIALIA and the new railway station of the AVE (high speed train) in Malaga was inaugurated in November 2006, just on the place of the former railway station. The new railway station with an investment of 134,7 million Euros occupies a surface of 51.377 m2, five times the surface of the former station. The enclosure is the biggest intermodal and commercial centre of Spain which comprises a parking of 21.000 m2 for 1300 parking places, one commercial area and a hotel with a total extension constructed of approximately 100.000 m2. The spaces of leisure contain cinemas, shops, restaurants, bowling, gymnasium, swimming pool and zones of passenger's traffic.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The new railway station of María Zambrano for AVE (Spanish high-speed trains) located in Malaga, has been inaugurated in November 2006, just on the site of the former railway station. The new railway station with an investment of 134.7 million Euros occupies a surface of 51.377 m2, five times the surface of the former station. The enclosure is the biggest intermodal transport and commercial center of Spain which comprises a parking of 21,000 m2 for 1,300 parking places, one commercial area and a hotel of 35 m height, with a total extension constructed of approximately 100,000 m2.