3 resultados para Refuse and refuse disposal -- Ontario -- Niagara (Regional municipality)

em Universidad Politécnica de Madrid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

An integrated approach composed of a random utility-based multiregional input-output model and a road transport network model was developed for evaluating the application of a fee to heavy-goods vehicles (HGVs) in Spain. For this purpose, a distance-based charge scenario (in euros per vehicle kilometer) for HGVs was evaluated for a selected motorway network in Spain. Although the aim of this charging policy was to increase the efficiency of transport, the approach strongly identified direct and indirect impacts on the regional economy. Estimates of the magnitude and extent of indirect effects on aggregated macroeconomic indicators (employment and gross domestic product) are provided. The macroeconomic effects of the charging policy were found to be positive for some regions and negative for other regions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Shopping centre is a long term investment in which Greenfield development decisions are often taken based on risks analysis regarding construction costs, location, competition, market and an expected DCF. Furthermore, integration between the building design, project planning, operational costs and investment analysis is not entirely considered by the investor at the decision making stage. The absence of such information tends to produce certain negative impacts on the future running costs and annual maintenance of the building, especially on energy demand and other occupancy expenses paid by the tenants to the landlord. From the investor´s point of view, this blind spot in strategy development will possibly decrease their profit margin as changes in the occupancy expenses[ ] have a direct outcome on the profit margin. In order to try to reduce some higher operating cost components such as energy use and other utility savings as well as their CO2 emissions, quite a few income properties worldwide have some type of environmental label such as BREEAM and LEED. The drawback identified in this labelling is that usually the investments required to get an ecolabel are high and the investor finds no direct evidence that it increases market value. However there is research on certified commercial properties (especially offices) that shows better performance in terms of occupancy rate and rental cost (Warren-Myers, 2012). Additionally, Sayce (2013) says that the certification only provides a quick reference point i.e. the lack of a certificate does not indicate that a building is not sustainable or efficient. Based on the issues described above, this research compares important components of the development stages such as investments costs, concept/ strategy development as well as the current investor income and property value. The subjects for this analysis are a shopping centre designed with passive cooling/bioclimatic strategies evaluated at the decision making stage, a certified regional shopping centre and a non-certified standard regional shopping centre. Moreover, the proposal intends to provide decision makers with some tools for linking green design features to the investment analysis in order to optimize the decision making process when looking into cost savings and design quality.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the EU context extraction of shale and oil gas by hydraulic fracturing (fracking) differs from country to country in terms of legislation and implementation. While fossil fuel extraction using this technology is currently taking place in the UK, Germany and France have adopted respective moratoria. In between is the Spanish case, where hydrocarbon extraction projects through fracking have to undergo mandatory and routine environmental assessment in accordance with the last changes to environmental regulations. Nowadays Spain is at the crossroad with respect to the future of this technology. We presume a social conflictt in our country since the position and strategy of the involved and confronted social actors -national, regional and local authorities, energy companies, scientists, NGO and other social organization- are going to play key and likely divergent roles in its industrial implementation and public acceptance. In order to improve knowledge on how to address these controverted situations from the own engineering context, the affiliated units from the Higher Technical School of Mines and Energy Engineering at UPM have been working on a transversal program to teach values and ethics. Over the past seven years, this pioneering experience has shown the usefulness of applying a consequentialist ethics, based on a case-by-case approach and costs-benefits analysis both for action and inaction. As a result of this initiative a theoretical concept has arisen and crystallized in this field: it is named Inter-ethics. This theoretical perspective can be very helpful in complex situations, with multi-stakeholders and plurality of interests, when ethical management requires the interaction between the respective ethics of each group; professional ethics of a single group is not enough. Under this inter-ethics theoretical framework and applying content analysis techniques, this paper explores the articulation of the discourse in favour and against fracking technology and its underlying values as manifested in the Spanish traditional mass media and emerging social media such as Youtube. Results show that Spanish public discourse on fracking technology includes the costs-benefits analysis to communicate how natural resources from local communities may be affected by these facilities due to environmental, health and economic consequences. Furthermore, this technology is represented as a solution to the "demand of energy" according to the optimistic discourse while, from a pessimistic view, fracking is often framed as a source "environmental problems" and even natural disasters as possible earthquakes. In this latter case, this negative representation could have been influenced by the closure of a macro project to store injected natural gas in the Mediterranean Sea using the old facilities of an oil exploitation in Amposta (Proyecto Cástor). The closure of this project was due to the occurrence of earthquakes whose intensity was higher than the originally expected by the experts in the assessment stage of the project.