5 resultados para Railroad stations
em Universidad Politécnica de Madrid
Resumo:
The City of Madrid is putting into operation Intermodal Exchange Stations (IESs) to make connections between urban and suburban transportation modes easier for users of public transportation. The purpose of this article is to evaluate the actual effects that the implementation of IESs in the City of Madrid has on the affected stakeholders: users, public transportation operators, infrastructure managers, the government, the abutters and other citizens. We develop a methodology intended to help assess the welfare gains and losses for each stakeholder. Then we apply this methodology to the case study of the Avenida de América IES in the city of Madrid. We found that it is indeed possible to arrive at win–win solutions for the funding of urban transportation infrastructure, as long as the cost-benefit ratio of the project is high enough. Commuters save travel time. Bus companies diminish their costs of operation. The abutters gain in quality of life. The private operator of the infrastructure makes a fair profit. And the government is able to promote these infrastructure facilities without spending more of its scarce budgetary resources.
Resumo:
In the present uncertain global context of reaching an equal social stability and steady thriving economy, power demand expected to grow and global electricity generation could nearly double from 2005 to 2030. Fossil fuels will remain a significant contribution on this energy mix up to 2050, with an expected part of around 70% of global and ca. 60% of European electricity generation. Coal will remain a key player. Hence, a direct effect on the considered CO2 emissions business-as-usual scenario is expected, forecasting three times the present CO2 concentration values up to 1,200ppm by the end of this century. Kyoto protocol was the first approach to take global responsibility onto CO2 emissions monitoring and cap targets by 2012 with reference to 1990. Some of principal CO2emitters did not ratify the reduction targets. Although USA and China spur are taking its own actions and parallel reduction measures. More efficient combustion processes comprising less fuel consuming, a significant contribution from the electricity generation sector to a CO2 dwindling concentration levels, might not be sufficient. Carbon Capture and Storage (CCS) technologies have started to gain more importance from the beginning of the decade, with research and funds coming out to drive its come in useful. After first researching projects and initial scale testing, three principal capture processes came out available today with first figures showing up to 90% CO2 removal by its standard applications in coal fired power stations. Regarding last part of CO2 reduction chain, two options could be considered worthy, reusing (EOR & EGR) and storage. The study evaluates the state of the CO2 capture technology development, availability and investment cost of the different technologies, with few operation cost analysis possible at the time. Main findings and the abatement potential for coal applications are presented. DOE, NETL, MIT, European universities and research institutions, key technology enterprises and utilities, and key technology suppliers are the main sources of this study. A vision of the technology deployment is presented.
Resumo:
The need for the use of another surveillance system when radar cannot be used is the reason for the development of the Multilateration (MLT) Systems. However, there are many systems that operate in the L-Band (960-1215MHz) that could produce interference between systems. At airports, some interference has been detected between transmissions of MLT systems (1030MHz and 1090MHz) and Distance Measuring Equipment (DME) (960-1215MHz).
Resumo:
Diseño conceptual de puentes de alta velocidad ferroviarios. Railroad bridges, in general, and those for high speed railways, in particular, demand very special conditions. The traffic loads are much higher than for road bridges. Loads due to braking and acceleration determine, due to their magnitude, the structural layout. Because of the speed of the vehicles there are specific dynamic effects which need to be considered. In order to ensure passenger comfort, compatible with speeds of up to 350 km/h, it is necessary to meet very demanding conditions with respect to stiffness, displacements and dynamic behavior. In this paper these conditions are briefly described and different typological possibilities to satisfy them are presented as well as the main construction methods applicable to this kind of bridges.
Resumo:
In the context of the present conference paper culverts are defined as an opening or conduit passing through an embankment usually for the purpose of conveying water or providing safe pedestrian and animal crossings under rail infrastructure. The clear opening of culverts may reach values of up to 12m however, values around 3m are encountered much more frequently. Depending on the topography, the number of culverts is about 10 times that of bridges. In spite of this, their dynamic behavior has received far less attention than that of bridges. The fundamental frequency of culverts is considerably higher than that of bridges even in the case of short span bridges. As the operational speed of modern high-speed passenger rail systems rises, higher frequencies are excited and thus more energy is encountered in frequency bands where the fundamental frequency of box culverts is located. Many research efforts have been spent on the subject of ballast instability due to bridge resonance, since it was first observed when high-speed trains were introduced to the Paris/Lyon rail line. To prevent this phenomenon from occurring, design codes establish a limit value for the vertical deck acceleration. Obviously one needs some sort of numerical model in order to estimate this acceleration level and at that point things get quite complicated. Not only acceleration but also displacement values are of interest e.g. to estimate the impact factor. According to design manuals the structural design should consider the depth of cover, trench width and condition, bedding type, backfill material, and compaction. The same applies to the numerical model however, the question is: What type of model is appropriate for this job? A 3D model including the embankment and an important part of the soil underneath the culvert is computationally very expensive and hard to justify taking into account the associated costs. Consequently, there is a clear need for simplified models and design rules in order to achieve reasonable costs. This paper will describe the results obtained from a 2D finite element model which has been calibrated by means of a 3D model and experimental data obtained at culverts that belong to the high-speed railway line that links the two towns of Segovia and Valladolid in Spain