5 resultados para Public projects

em Universidad Politécnica de Madrid


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Based on the empirical evidence that the ratio of email messages in public mailing lists to versioning system commits has remained relatively constant along the history of the Apache Software Foundation (ASF), this paper has as goal to study what can be inferred from such a metric for projects of the ASF. We have found that the metric seems to be an intensive metric as it is independent of the size of the project, its activity, or the number of developers, and remains relatively independent of the technology or functional area of the project. Our analysis provides evidence that the metric is related to the technical effervescence and popularity of project, and as such can be a good candidate to measure its healthy evolution. Other, similar metrics -like the ratio of developer messages to commits and the ratio of issue tracker messages to commits- are studied for several projects as well, in order to see if they have similar characteristics.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of this paper is to call into question those typologies conventionally used in developing the post-industrial urban fabric (streets, cityblocks, slabs, etc.), often catering to urban designs based on speculative interests and completely overlooking community interests. By defining the concepts of ?postpublic space? and ?reversible urban entities? and illustrating them with an exemplary case of Spanish residential architecture from the 1960s, we establish one possible way of tackling contemporary urban-residential projects. This alternative approach considers the relationship between residential systems and open space systems and promotes the continuity and/or alternation of scales between house and city in an effort to improve the urban quality of life for residents and external users.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes a theoretical model based primarily on transaction costs, for comparing the various tendering mechanisms used for transportation Public-Private Partnership (PPP) projects. In particular, the model contrasts negotiated procedures with the open procedure, as defined by the current European Union legislation on public tendering. The model includes both ex ante transaction costs (borne during the tendering stage) and ex post transaction costs (such as enforcement costs, re-negotiation costs, and costs arising from litigation between partners), explaining the trade-off between them. Generally speaking, it is assumed that the open procedure implies lower transaction costs ex ante, while the negotiated procedure reduces the probability of the appearance of new contingencies not foreseen in the contract, hence diminishing the expected value of transaction costs ex post. Therefore, the balance between ex ante and ex post transaction costs is the main criterion for deciding whether the open or negotiated procedure would be optimal. Notwithstanding, empirical evidence currently exists only on ex ante transaction costs in transportation infrastructure projects. This evidence has shown a relevant difference between the two procedures as far as ex ante costs are concerned, favouring the open procedure. The model developed in this paper also demonstrates that a larger degree of complexity in a contract does not unequivocally favour the use of a negotiated procedure. Only in those cases dealing with very innovative projects, where important dimensions of the quality of the asset or service are not verifiable, may we observe an advantage in favour of the negotiated procedure. The bottom line is that we find it difficult to justify the employment of negotiated procedures in most transportation PPP contracts, especially in the field of roads. Nevertheless, the field remains open for future empirical work and research on the levels of transaction costs borne ex post in PPP contracts, as well as on the probabilities of such costs appearing under any of the procurement procedures.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

It is impossible to talk about planning as a scientific meta-discipline without mentioning one of the most influential worldwide figures in the second half of the twentieth century: John Friedmann. His contribution to the planning concept on his "Planning as Social Learning" theory is still very relevant. This paper shows the intellectual connection between Friedmann and Angel Ramos and Ignacio Trueba, two of the Spanish intellectual drivers in the engineering project knowledge area, who contributed to founding the Engineering Projects Spanish Association. The three of them share a broad vision of the project and abandon the "blue print" planning model. They also see the project as a transformational tool that requires a different planning style to the one which prevailed in the 70s - both in public and private domains. They were pioneers in structuring Knowledge / Action in a different way, both in academic institutions where disciples helped to bring about change- and with direct action via projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the EU context extraction of shale and oil gas by hydraulic fracturing (fracking) differs from country to country in terms of legislation and implementation. While fossil fuel extraction using this technology is currently taking place in the UK, Germany and France have adopted respective moratoria. In between is the Spanish case, where hydrocarbon extraction projects through fracking have to undergo mandatory and routine environmental assessment in accordance with the last changes to environmental regulations. Nowadays Spain is at the crossroad with respect to the future of this technology. We presume a social conflictt in our country since the position and strategy of the involved and confronted social actors -national, regional and local authorities, energy companies, scientists, NGO and other social organization- are going to play key and likely divergent roles in its industrial implementation and public acceptance. In order to improve knowledge on how to address these controverted situations from the own engineering context, the affiliated units from the Higher Technical School of Mines and Energy Engineering at UPM have been working on a transversal program to teach values and ethics. Over the past seven years, this pioneering experience has shown the usefulness of applying a consequentialist ethics, based on a case-by-case approach and costs-benefits analysis both for action and inaction. As a result of this initiative a theoretical concept has arisen and crystallized in this field: it is named Inter-ethics. This theoretical perspective can be very helpful in complex situations, with multi-stakeholders and plurality of interests, when ethical management requires the interaction between the respective ethics of each group; professional ethics of a single group is not enough. Under this inter-ethics theoretical framework and applying content analysis techniques, this paper explores the articulation of the discourse in favour and against fracking technology and its underlying values as manifested in the Spanish traditional mass media and emerging social media such as Youtube. Results show that Spanish public discourse on fracking technology includes the costs-benefits analysis to communicate how natural resources from local communities may be affected by these facilities due to environmental, health and economic consequences. Furthermore, this technology is represented as a solution to the "demand of energy" according to the optimistic discourse while, from a pessimistic view, fracking is often framed as a source "environmental problems" and even natural disasters as possible earthquakes. In this latter case, this negative representation could have been influenced by the closure of a macro project to store injected natural gas in the Mediterranean Sea using the old facilities of an oil exploitation in Amposta (Proyecto Cástor). The closure of this project was due to the occurrence of earthquakes whose intensity was higher than the originally expected by the experts in the assessment stage of the project.